R-7265 Queen Mary Village Demolition
Closed State & local contract opportunity Posted
- Solicitation number
- PW-25-540
- State
- California
- Responses due
Opportunity facts
- NIGP codes
- 745 Road And Highway Building Materials, Asphaltic
- 909 Building Construction Services, New, Including Maintenance And Repair Services
- 91047 Lead Abatement Services
- 91187 Storm Drainage
- 91240 Demolition Services
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 92935 Earth Handling, Grading, Moving, And Packing Equipment Maintenance And Repair
- 95826 Construction Management Services
- 98815 Fence Installation, Maintenance And Repair
- UNSPSC codes
- 95120000 Permanent buildings and structures
- 46161538 Vehicle height restriction bars
- 72152706 Driveway construction service
- 72152707 Retaining wall construction service
- 95111616 Pedestrian way
- 81101513 Building construction management
- 72154027 Posthole digging service
- 76101603 Lead based paint abatement or encapsulation
- 72141508 Blasting service except building demolition
- 72141510 Demolition services
- Points of contact
-
- Michael Lau michael.lau@psomas.com (562) 570-6383
- Elisa Landeros lbpurchasing@longbeach.gov (562) 570-6200
- Anne Takii anne.takii@longbeach.gov (562) 570-6238
Opportunity details come from longbeachbuys.buyspeed.com. Updated .
About this opportunity
The City of Long Beach, Department of Public Works is procuring demolition, site grading, retaining-wall construction, and parking-lot development for Queen Mary Village under IFB R-7265, with bids due February 21, 2025 and a mandatory pre-bid conference held February 13, 2025.
The scope encompasses demolition of existing buildings, foundations, brickwork, concrete, and planters; site regrading with 392.5 cubic yards of cut and 384.8 cubic yards of fill; construction of a new retaining wall; and asphalt and aggregate-base paving to create additional parking and event space. The site is divided into upper and lower sections with a 3–4 foot elevation difference to be maintained post-construction. All work must comply with California Prevailing Wage regulations (Labor Code 1720, 2024-2 rates). The project is subject to a Project Labor Agreement with union/non-union requirements, 40% local hire goal, 10% transitional/veteran worker hire goal, apprenticeship requirements, mandatory jobs coordinator, and weekly certified-payroll uploads to LCPtracker. Asbestos is present in roof and floor mastics, roofing materials, exterior stucco, and window putty, requiring two separate SCAQMD permits. Contractors and all subcontractors must be registered with the Department of Industrial Relations. California A and/or B Contractor License is required; bid security is 10% of bid amount with 30% self-performance security. Addendum 2 (February 18, 2025) modified grading quantities and provided nine RFI responses.
The engineer's estimate is $1.25 million for a 55-calendar-day project. Mobilization is required no later than April 1, 2025. Five responsive bids were received; Miller Environmental, Inc. was the lowest responsive bidder at $1,172,231 (including Procedure 5 asbestos abatement additive). Environmental Construction Group, Inc. withdrew its bid. Miller Environmental holds MBE and SBE designations and meets the 30% self-performance threshold. Council award is estimated for March 2025. Questions were due February 14, 2025; RFI responses were posted February 18. Bids were submitted electronically through Long Beach Buys (R-7265).
Opportunity text
The work to be done consists primarily of demolishing and removing the existing Queen Mary Village buildings, foundations, and surrounding brickwork, concrete, and planters then regrading the site, constructing a new retaining wall, and constructing new parking lot areas. Bids are required for the entire work.
Files
Show all 16
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity