BId Tab R-7265 Queen Mary Village Demolition REVISED.pdf
PDF 419 KB Posted
- Attached to
- R-7265 Queen Mary Village Demolition
- Solicitation number
- PW-25-540
- Issued by
- California
About this file
This is a tabulation of bids opened on February 21, 2025, for the Queen Mary Village Demolition project located at 3271 E 19th Street in Signal Hill, California, prepared in accordance with City plans and specifications No. R-7265 (PW-25-540). The project encompasses comprehensive demolition and site preparation work, including temporary fencing, best management practices, removal and demolition of existing building structures and foundations, removal of equipment and utilities, demolition of exterior improvements, asbestos abatement, site grading, export fill, asphalt work, aggregate base installation, retaining wall and foundation construction, railing installation, storm drain/catch basin realignment, curb ramp construction, and mobilization/demobilization services. Six contractors submitted bids for the project: Environmental Construction Group, Inc.; Miller Environmental, Inc.; D.F. Perez Construction, Inc.; 2H Construction, Inc.; and C-tech Construction. Miller Environmental, Inc. submitted the lowest responsive bid.
The total base bid from the lowest responsive bidder, Miller Environmental, Inc., was $1,162,231.00, with a total bid amount including the Procedure 5 Asbestos Abatement additive of $1,172,231.00. The delta between the first and second lowest bidder was $330,776.00. Miller Environmental, Inc. designated itself as both a Minority-Owned Business Enterprise (MBE) and Small Business Enterprise (SBE). The bid included a mobilization component of 4 percent, with specialty asbestos abatement items (items 7 and 17) totaling $254,224.00 and a new subcontracted amount of $321,271.00, representing 29.04 percent of the total bid and meeting the minimum 30 percent self-performance requirement with 70.96 percent self-performance. One bidder, Environmental Construction Group, Inc., withdrew its bid, rendering it non-responsive.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIR / CSLB 1000007666 / 811415 1000001577 / 295128 1000001577 / 295128 1000051924 / 387778 1000003938/741856 TABULATION OF BIDS OPENED FEBRUARY 21, 2025 FOR THE Environmental Construction Group, Inc. Miller Environmental, Inc. BID Miller Environmental, Inc. D.F. Perez Construction, Inc. 2H Construction, Inc. C-tech Construction QUEEN MARY VILLAGE DEMOLITION 3271 E 19th St 1130 W. Trenton Ave. 1130 W. Trenton Ave. 2840 E La Cresta Ave 2653 Walnut Ave 11719 McBean Dr.
Signal Hill, CA 90755 Orange, CA 92867 Orange, CA 92867 Anaheim, CA 92806 Signal Hill, CA 90755 El Monte, CA 91732 PLANS AND SPECIFICATIONS NO. R-7265 (PW-25-540) Ph 562-826-2462 714-385-0099 714-385-0099 714-774-4778 562-424-5567 626-315-7187
Fax N/A N/A N/A 714-774-5188 562-424-5578 N/A
SBE MBE, SBE SBE
Item BASE BID ITEMS QTY UOM UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL 1 Temporary Fencing and Screens LS 1 $ 29,000.00 $ 29,000.00 $ 12,583.00 $ 12,583.00 $ 12,583.00 $ 12,583.00 $ 7,720.31 $ 7,720.31 $ 15,000.00 $ 15,000.00 N/A N/A
2 Best Management Practices LS 1 $ 19,400.00 $ 19,400.00 $ 12,562.00 $ 12,562.00 $ 12,562.00 $ 12,562.00 $ 11,254.10 $ 11,254.10 $ 15,000.00 $ 15,000.00 N/A N/A
3 Remove and Demolish Existing Building Structures LS 1 $ 121,250.00 $ 121,250.00 $ 327,986.00 $ 327,986.00 $ 327,586.00 $ 327,586.00 $ 341,784.09 $ 341,784.09 $ 225,000.00 $ 225,000.00 N/A N/A
4 Remove and Demolish Existing Building Foundations LS 1 $ 97,000.00 $ 97,000.00 $ 110,163.00 $ 110,163.00 $ 110,163.00 $ 110,163.00 $ 57,467.82 $ 57,467.82 $ 85,000.00 $ 85,000.00 N/A N/A
5 Removal of Equipment and Utilities LS 1 $ 48,500.00 $ 48,500.00 $ 5,000.00 $ 5,000.00 $ 9,440.00 $ 9,440.00 $ 18,054.50 $ 18,054.50 $ 25,000.00 $ 25,000.00 N/A N/A
6 Remove and Demolish Existing Exterior Improvements (Concrete Stairs, Sidewalk, Base, and Pedestrian Ramp/Base, Fencing, Posts, Footings, Planters, Planter Walls, Trees, Irrigation, etc.) LS 1 $ 97,000.00 $ 97,000.00 $ 85,258.00 $ 85,258.00 $ 85,258.00 $ 85,258.00 $ 63,070.90 $ 63,070.90 $ 125,000.00 $ 125,000.00 N/A N/A
7 Intact Building Material Asbestos Abatement (non-Procedure 5) (S)
LS 1 $ 326,729.00 $ 326,729.00 $ 232,819.00 $ 232,819.00 $ 232,819.00 $ 232,819.00 $ 350,050.45 $ 350,050.45 $ 275,000.00 $ 275,000.00 N/A N/A
8 Site Grading (Site Clearing, Rough and Fine Grading, Cut and Fill Onsite, Compaction, Erosion and Dust Control, etc.)
LS 1 $ 58,200.00 $ 58,200.00 $ 140,000.00 $ 140,000.00 $ 140,000.00 $ 140,000.00 $ 188,799.88 $ 188,799.88 $ 180,000.00 $ 180,000.00 N/A N/A
9 Export Fill LS 1 $ 6,466.00 $ 6,466.00 $ 90,000.00 $ 90,000.00 $ 90,000.00 $ 90,000.00 $ 23,448.25 $ 23,448.25 $ 60,000.00 $ 60,000.00 N/A N/A 10 Asphalt LS 1 $ 106,700.00 $ 106,700.00 $ 87,978.00 $ 87,978.00 $ 87,978.00 $ 87,978.00 $ 97,419.87 $ 97,419.87 $ 100,000.00 $ 100,000.00 N/A N/A 11 Aggregate Base LS 1 $ 86,221.00 $ 86,221.00 $ 85,000.00 $ 85,000.00 $ 85,000.00 $ 85,000.00 $ 102,460.25 $ 102,460.25 $ 100,000.00 $ 100,000.00 N/A N/A
12 New Retaining Wall and Foundation LS 1 $ 53,835.00 $ 53,835.00 $ 102,973.00 $ 102,973.00 $ 102,973.00 $ 102,973.00 $ 91,319.01 $ 91,319.01 $ 145,000.00 $ 145,000.00 N/A N/A 13 Railings LS 1 $ 46,343.00 $ 46,343.00 $ 128,685.00 $ 128,685.00 $ 128,685.00 $ 128,685.00 $ 165,946.09 $ 165,946.09 $ 175,000.00 $ 175,000.00 N/A N/A 14 Storm Drain/Catch Basin Realignment LS 1 $ 9,700.00 $ 9,700.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 6,237.69 $ 6,237.69 $ 20,000.00 $ 20,000.00 N/A N/A 15 Curb Ramp LS 1 $ 8,730.00 $ 8,730.00 $ 22,000.00 $ 22,000.00 $ 57,687.00 $ 57,687.00 $ 20,708.22 $ 20,708.22 $ 45,000.00 $ 45,000.00 N/A N/A 16 Mobilization/Demobilization LS 1 $ 47,157.00 $ 47,157.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 11,766.00 $ 11,766.00 $ 78,000.00 $ 78,000.00 N/A N/A
TOTAL BASE BID (Basis for Award) 1,162,231.00$ 1,493,007.00$ 1,532,734.00$ 1,557,507.43$ 1,668,000.00$ N/A
Delta between 1st and 2nd Lowest bidder $330,776.00
BID ADDITIVE
17 Procedure 5 Asbestos Abatement (S) 1 LS 10,000.00$ $ 10,000.00 21,405.00$ $ 21,405.00 21,405.00$ $ 21,405.00 38,826.65$ $ 38,826.65 92,460.00$ $ 92,460.00 N/A N/A
TOTAL BID AMOUNT 1,172,231.00$ 1,514,412.00$ 1,554,139.00$ 1,596,334.08$ 1,760,460.00$ N/A
Mobilization % 4% 2% 2% 1% 5% N/A 658,000.00$ 693,970.00$ 729,657.00$ 927,800.00$ 706,000.00$ N/A
56% 46% 47% 58% 40% N/A Specialty Items #7 & 17 336,729.00$ 254,224.00$ 254,224.00$ 388,877.10$ 367,460.00$ N/A
New Subcontracted Amount 321,271.00$ 693,970.00$ 729,657.00$ 538,922.90$ 338,540.00$ N/A New % Subcontracted 27.41% 29.04% 30.59% 33.76% 19.23% N/A
% Self Performance - Minimum of 30% 72.59% 70.96% 69.41% 66.24% 80.77% N/A Yes WITHDRAWN Yes Yes Yes No
VOID- BID WITHDRAWN
Responsive Bid:
Subcontracted % Subcontracted
Company Address
IN LONG BEACH, CALIFORNIA IN ACCORDANCE WITH City/State/Zip