Bid Tabulation Summary

This is a bid tabulation document for the Queen Mary Village Demolition project located at 3271 E 19th Street in Signal Hill, California, opened on February 21, 2025. The project encompasses comprehensive demolition and site preparation services including temporary fencing, environmental controls, building structure and foundation removal, equipment and utility disconnection, exterior improvements demolition, asbestos abatement, site grading, fill export, asphalt and aggregate base installation, retaining wall construction, railings, storm drain realignment, curb ramp installation, and mobilization/demobilization activities. Five contractors submitted responsive bids for the project, which is identified under Plans and Specifications No. R-7265 (PW-25-540).

The lowest responsive bid was submitted by Environmental Construction Group, Inc. at $1,172,231.00 for the base bid and total bid amount, representing a difference of $330,776.00 from the second-lowest bidder, Miller Environmental, Inc. BID #1 at $1,502,510.00. Environmental Construction Group, Inc. designated as a Small Business Enterprise (SBE), meets the minimum self-performance requirement of 30% at 72.59%. Other responsive bidders include Miller Environmental, Inc. BID #2 ($1,514,412.00), D.F. Perez Construction, Inc. ($1,554,139.00), and 2H Construction, Inc. ($1,596,334.08), all meeting the self-performance threshold. C-tech Construction submitted a non-responsive bid. The project includes bid additive Item 17 for Procedure 5 Asbestos Abatement, with specialty asbestos items comprising significant portions of the total contract values across all bidders.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIR / CSLB 1000007666 / 811415 1000001577 / 295128 1000001577 / 295128 1000051924 / 387778 1000003938/741856 TABULATION OF BIDS OPENED FEBRUARY 21, 2025 FOR THE Environmental Construction Group, Inc. Miller Environmental, Inc. BID #2 Miller Environmental, Inc. BID #1 D.F. Perez Construction, Inc. 2H Construction, Inc. C-tech Construction QUEEN MARY VILLAGE DEMOLITION 3271 E 19th St 1130 W. Trenton Ave. 1130 W. Trenton Ave. 2840 E La Cresta Ave 2653 Walnut Ave 11719 McBean Dr.

Signal Hill, CA 90755 Orange, CA 92867 Orange, CA 92867 Anaheim, CA 92806 Signal Hill, CA 90755 El Monte, CA 91732 PLANS AND SPECIFICATIONS NO. R-7265 (PW-25-540) Ph 562-826-2462 714-385-0099 714-385-0099 714-774-4778 562-424-5567 626-315-7187

Fax N/A N/A N/A 714-774-5188 562-424-5578 N/A

SBE MBE, SBE SBE

Item BASE BID ITEMS QTY UOM UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL UNIT COST ITEM TOTAL 1 Temporary Fencing and Screens LS 1 $ 29,000.00 $ 29,000.00 $ 12,583.00 $ 12,583.00 $ 12,583.00 $ 12,583.00 $ 7,720.31 $ 7,720.31 $ 15,000.00 $ 15,000.00 N/A N/A

2 Best Management Practices LS 1 $ 19,400.00 $ 19,400.00 $ 12,562.00 $ 12,562.00 $ 12,562.00 $ 12,562.00 $ 11,254.10 $ 11,254.10 $ 15,000.00 $ 15,000.00 N/A N/A

3 Remove and Demolish Existing Building Structures LS 1 $ 121,250.00 $ 121,250.00 $ 327,986.00 $ 327,986.00 $ 327,586.00 $ 327,586.00 $ 341,784.09 $ 341,784.09 $ 225,000.00 $ 225,000.00 N/A N/A

4 Remove and Demolish Existing Building Foundations LS 1 $ 97,000.00 $ 97,000.00 $ 110,163.00 $ 110,163.00 $ 110,163.00 $ 110,163.00 $ 57,467.82 $ 57,467.82 $ 85,000.00 $ 85,000.00 N/A N/A

5 Removal of Equipment and Utilities LS 1 $ 48,500.00 $ 48,500.00 $ 5,000.00 $ 5,000.00 $ 9,440.00 $ 9,440.00 $ 18,054.50 $ 18,054.50 $ 25,000.00 $ 25,000.00 N/A N/A

6 Remove and Demolish Existing Exterior Improvements (Concrete Stairs, Sidewalk, Base, and Pedestrian Ramp/Base, Fencing, Posts, Footings, Planters, Planter Walls, Trees, Irrigation, etc.) LS 1 $ 97,000.00 $ 97,000.00 $ 85,258.00 $ 85,258.00 $ 85,258.00 $ 85,258.00 $ 63,070.90 $ 63,070.90 $ 125,000.00 $ 125,000.00 N/A N/A

7 Intact Building Material Asbestos Abatement (non-Procedure 5) (S)

LS 1 $ 326,729.00 $ 326,729.00 $ 232,819.00 $ 232,819.00 $ 232,819.00 $ 232,819.00 $ 350,050.45 $ 350,050.45 $ 275,000.00 $ 275,000.00 N/A N/A

8 Site Grading (Site Clearing, Rough and Fine Grading, Cut and Fill Onsite, Compaction, Erosion and Dust Control, etc.)

LS 1 $ 58,200.00 $ 58,200.00 $ 140,000.00 $ 140,000.00 $ 140,000.00 $ 140,000.00 $ 188,799.88 $ 188,799.88 $ 180,000.00 $ 180,000.00 N/A N/A

9 Export Fill LS 1 $ 6,466.00 $ 6,466.00 $ 90,000.00 $ 90,000.00 $ 90,000.00 $ 90,000.00 $ 23,448.25 $ 23,448.25 $ 60,000.00 $ 60,000.00 N/A N/A 10 Asphalt LS 1 $ 106,700.00 $ 106,700.00 $ 87,978.00 $ 87,978.00 $ 87,978.00 $ 87,978.00 $ 97,419.87 $ 97,419.87 $ 100,000.00 $ 100,000.00 N/A N/A 11 Aggregate Base LS 1 $ 86,221.00 $ 86,221.00 $ 85,000.00 $ 85,000.00 $ 85,000.00 $ 85,000.00 $ 102,460.25 $ 102,460.25 $ 100,000.00 $ 100,000.00 N/A N/A

12 New Retaining Wall and Foundation LS 1 $ 53,835.00 $ 53,835.00 $ 102,973.00 $ 102,973.00 $ 102,973.00 $ 102,973.00 $ 91,319.01 $ 91,319.01 $ 145,000.00 $ 145,000.00 N/A N/A 13 Railings LS 1 $ 46,343.00 $ 46,343.00 $ 128,685.00 $ 128,685.00 $ 128,685.00 $ 128,685.00 $ 165,946.09 $ 165,946.09 $ 175,000.00 $ 175,000.00 N/A N/A 14 Storm Drain/Catch Basin Realignment LS 1 $ 9,700.00 $ 9,700.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 6,237.69 $ 6,237.69 $ 20,000.00 $ 20,000.00 N/A N/A 15 Curb Ramp LS 1 $ 8,730.00 $ 8,730.00 $ 22,000.00 $ 22,000.00 $ 57,687.00 $ 57,687.00 $ 20,708.22 $ 20,708.22 $ 45,000.00 $ 45,000.00 N/A N/A 16 Mobilization/Demobilization LS 1 $ 47,157.00 $ 47,157.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 11,766.00 $ 11,766.00 $ 78,000.00 $ 78,000.00 N/A N/A

TOTAL BASE BID (Basis for Award) 1,162,231.00$ 1,493,007.00$ 1,532,734.00$ 1,557,507.43$ 1,668,000.00$ N/A

Delta between 1st and 2nd Lowest bidder $330,776.00

BID ADDITIVE

17 Procedure 5 Asbestos Abatement (S) 1 LS 10,000.00$ $ 10,000.00 21,405.00$ $ 21,405.00 21,405.00$ $ 21,405.00 38,826.65$ $ 38,826.65 92,460.00$ $ 92,460.00 N/A N/A

TOTAL BID AMOUNT 1,172,231.00$ 1,514,412.00$ 1,554,139.00$ 1,596,334.08$ 1,760,460.00$ N/A

Mobilization % 4% 2% 2% 1% 5% N/A 658,000.00$ 693,970.00$ 729,657.00$ 927,800.00$ 706,000.00$ N/A

56% 46% 47% 58% 40% N/A Specialty Items #7 & 17 336,729.00$ 254,224.00$ 254,224.00$ 388,877.10$ 367,460.00$ N/A

New Subcontracted Amount 321,271.00$ 693,970.00$ 729,657.00$ 538,922.90$ 338,540.00$ N/A New % Subcontracted 27.41% 29.04% 30.59% 33.76% 19.23% N/A

% Self Performance - Minimum of 30% 72.59% 70.96% 69.41% 66.24% 80.77% N/A Yes Yes Yes Yes Yes NoResponsive Bid:

Subcontracted % Subcontracted