LB Buys Export - Bids Received 2-21-25 PW-25-540.pdf
PDF 197 KB Posted
- Attached to
- R-7265 Queen Mary Village Demolition
- Solicitation number
- PW-25-540
- Issued by
- California
About this file
This is a bid tabulation document for project PW-25-540, the Queen Mary Village Demolition (R-7265), a construction demolition project. The project encompasses 16 base bid items and one additive bid item, including temporary fencing and screens, best management practices, removal and demolition of existing building structures and foundations, removal of equipment and utilities, demolition of exterior improvements, asbestos abatement, site grading, export fill, asphalt work, aggregate base installation, retaining wall and foundation construction, railings, storm drain realignment, curb ramp installation, and mobilization/demobilization services. All items are measured as lump sum (LS) units with a quantity of 1.00 each.
Six vendors submitted bids for the project: VEN0002080 (Environmental Construction Group, Inc.), VEN0002779 (2H Construction), VEN0009062 (C-tech const inc), VEN0009089 (Miller Environmental, Inc.), and VEN0009159 (D.F. Perez Construction, Inc.). One vendor submitted a zero bid (VEN0009062). The base bid totals range from $1,162,231.00 to $1,668,000.00, with the lowest compliant bid at $1,493,007.00 from Miller Environmental, Inc. The bid additive for Procedure 5 Asbestos Abatement ranges from $10,000.00 to $92,460.00. Total bid amounts including the additive range from $1,172,231.00 to $1,760,460.00, with the lowest total at $1,514,412.00 from Miller Environmental, Inc.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VEN0002080 -
Environmental Construction Group, Inc.
VEN0002779 -
2H Construction
VEN0009062 -
C-tech const inc
VEN0009089 -
Miller
Environmental, Inc.
VEN0009089 -
Miller
Environmental, Inc.
VEN0009159 - D.F.
Perez
Construction, Inc.
Short Description Item Number Description Unit of Measure Quantity Measures Bid #1 Bid #2
1.00 Temporary Fencing and
Screens
LS 1.00 Unit Cost 29,000.00 15,000.00 0.00 12,583.00 12,583.00 7,720.31
2.00 Best Management
Practices
LS 1.00 Unit Cost 19,400.00 15,000.00 0.00 12,562.00 12,562.00 11,254.10
3.00 Remove and Demolish
Existing Building Structures
LS 1.00 Unit Cost 121,250.00 225,000.00 0.00 327,586.00 327,986.00 341,784.09
4.00 Remove and Demolish
Existing Building Foundations
LS 1.00 Unit Cost 97,000.00 85,000.00 0.00 110,163.00 110,163.00 57,467.82
5.00 Removal of Equipment
and Utilities
LS 1.00 Unit Cost 48,500.00 25,000.00 0.00 9,440.00 5,000.00 18,054.50
6.00 Remove and Demolish
Existing Exterior Improvements (Concrete Stairs, Sidewalk, Base, and Pedestrian Ramp/Base, Fencing, Posts, Footings, Planters, Planter Walls, Trees, Irrigation, etc.)
LS 1.00 Unit Cost 97,000.00 125,000.00 0.00 85,258.00 85,258.00 63,070.90
7.00 Intact Building Material
Asbestos Abatement (non-Procedure 5) (S)
LS 1.00 Unit Cost 326,729.00 275,000.00 0.00 232,819.00 232,819.00 350,050.45
8.00 Site Grading (Site
Clearing, Rough and Fine Grading, Cut and Fill Onsite, Compaction, Erosion and Dust Control, etc.)
LS 1.00 Unit Cost 58,200.00 180,000.00 0.00 140,000.00 140,000.00 188,799.88
9.00 Export Fill LS 1.00 Unit Cost 6,466.00 60,000.00 0.00 90,000.00 90,000.00 23,448.25
10.00 Asphalt LS 1.00 Unit Cost 106,700.00 100,000.00 0.00 87,978.00 87,978.00 97,419.87
11.00 Aggregate Base LS 1.00 Unit Cost 86,221.00 100,000.00 0.00 85,000.00 85,000.00 102,460.25
12.00 New Retaining Wall and
Foundation
LS 1.00 Unit Cost 53,835.00 145,000.00 0.00 102,973.00 102,973.00 91,319.01
13.00 Railings LS 1.00 Unit Cost 46,343.00 175,000.00 0.00 128,685.00 128,685.00 165,946.09
14.00 Storm Drain/Catch Basin
Realignment
LS 1.00 Unit Cost 9,700.00 20,000.00 0.00 20,000.00 20,000.00 6,237.69
15.00 Curb Ramp LS 1.00 Unit Cost 8,730.00 45,000.00 0.00 57,687.00 22,000.00 20,708.22
16.00 Mobilization/Demobilizati
on
LS 1.00 Unit Cost 47,157.00 78,000.00 0.00 30,000.00 30,000.00 11,766.00
1,162,231.00 1,668,000.00 0.00 1,532,734.00 1,493,007.00 1,557,507.43
17.00 BID ADDITIVE:
Procedure 5 Asbestos Abatement (S)
LS 1.00 Unit Cost 10,000.00 92,460.00 0.00 21,405.00 21,405.00 38,826.65
TOTAL BID AMOUNT 1,172,231.00 1,760,460.00 0.00 1,554,139.00 1,514,412.00 1,596,334.08
PW-25-540
R-7265 Queen Mary Village Demolition
BASE BID (Basis for Award)