LB Buys Export - Bids Received 2-21-25 PW-25-540.pdf

PDF 197 KB Posted

Attached to
R-7265 Queen Mary Village Demolition
Solicitation number
PW-25-540
Issued by
California

About this file

This is a bid tabulation document for project PW-25-540, the Queen Mary Village Demolition (R-7265), a construction demolition project. The project encompasses 16 base bid items and one additive bid item, including temporary fencing and screens, best management practices, removal and demolition of existing building structures and foundations, removal of equipment and utilities, demolition of exterior improvements, asbestos abatement, site grading, export fill, asphalt work, aggregate base installation, retaining wall and foundation construction, railings, storm drain realignment, curb ramp installation, and mobilization/demobilization services. All items are measured as lump sum (LS) units with a quantity of 1.00 each.

Six vendors submitted bids for the project: VEN0002080 (Environmental Construction Group, Inc.), VEN0002779 (2H Construction), VEN0009062 (C-tech const inc), VEN0009089 (Miller Environmental, Inc.), and VEN0009159 (D.F. Perez Construction, Inc.). One vendor submitted a zero bid (VEN0009062). The base bid totals range from $1,162,231.00 to $1,668,000.00, with the lowest compliant bid at $1,493,007.00 from Miller Environmental, Inc. The bid additive for Procedure 5 Asbestos Abatement ranges from $10,000.00 to $92,460.00. Total bid amounts including the additive range from $1,172,231.00 to $1,760,460.00, with the lowest total at $1,514,412.00 from Miller Environmental, Inc.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VEN0002080 -

Environmental Construction Group, Inc.

VEN0002779 -

2H Construction

VEN0009062 -

C-tech const inc

VEN0009089 -

Miller

Environmental, Inc.

VEN0009089 -

Miller

Environmental, Inc.

VEN0009159 - D.F.

Perez

Construction, Inc.

Short Description Item Number Description Unit of Measure Quantity Measures Bid #1 Bid #2

1.00 Temporary Fencing and

Screens

LS 1.00 Unit Cost 29,000.00 15,000.00 0.00 12,583.00 12,583.00 7,720.31

2.00 Best Management

Practices

LS 1.00 Unit Cost 19,400.00 15,000.00 0.00 12,562.00 12,562.00 11,254.10

3.00 Remove and Demolish

Existing Building Structures

LS 1.00 Unit Cost 121,250.00 225,000.00 0.00 327,586.00 327,986.00 341,784.09

4.00 Remove and Demolish

Existing Building Foundations

LS 1.00 Unit Cost 97,000.00 85,000.00 0.00 110,163.00 110,163.00 57,467.82

5.00 Removal of Equipment

and Utilities

LS 1.00 Unit Cost 48,500.00 25,000.00 0.00 9,440.00 5,000.00 18,054.50

6.00 Remove and Demolish

Existing Exterior Improvements (Concrete Stairs, Sidewalk, Base, and Pedestrian Ramp/Base, Fencing, Posts, Footings, Planters, Planter Walls, Trees, Irrigation, etc.)

LS 1.00 Unit Cost 97,000.00 125,000.00 0.00 85,258.00 85,258.00 63,070.90

7.00 Intact Building Material

Asbestos Abatement (non-Procedure 5) (S)

LS 1.00 Unit Cost 326,729.00 275,000.00 0.00 232,819.00 232,819.00 350,050.45

8.00 Site Grading (Site

Clearing, Rough and Fine Grading, Cut and Fill Onsite, Compaction, Erosion and Dust Control, etc.)

LS 1.00 Unit Cost 58,200.00 180,000.00 0.00 140,000.00 140,000.00 188,799.88

9.00 Export Fill LS 1.00 Unit Cost 6,466.00 60,000.00 0.00 90,000.00 90,000.00 23,448.25

10.00 Asphalt LS 1.00 Unit Cost 106,700.00 100,000.00 0.00 87,978.00 87,978.00 97,419.87

11.00 Aggregate Base LS 1.00 Unit Cost 86,221.00 100,000.00 0.00 85,000.00 85,000.00 102,460.25

12.00 New Retaining Wall and

Foundation

LS 1.00 Unit Cost 53,835.00 145,000.00 0.00 102,973.00 102,973.00 91,319.01

13.00 Railings LS 1.00 Unit Cost 46,343.00 175,000.00 0.00 128,685.00 128,685.00 165,946.09

14.00 Storm Drain/Catch Basin

Realignment

LS 1.00 Unit Cost 9,700.00 20,000.00 0.00 20,000.00 20,000.00 6,237.69

15.00 Curb Ramp LS 1.00 Unit Cost 8,730.00 45,000.00 0.00 57,687.00 22,000.00 20,708.22

16.00 Mobilization/Demobilizati

on

LS 1.00 Unit Cost 47,157.00 78,000.00 0.00 30,000.00 30,000.00 11,766.00

1,162,231.00 1,668,000.00 0.00 1,532,734.00 1,493,007.00 1,557,507.43

17.00 BID ADDITIVE:

Procedure 5 Asbestos Abatement (S)

LS 1.00 Unit Cost 10,000.00 92,460.00 0.00 21,405.00 21,405.00 38,826.65

TOTAL BID AMOUNT 1,172,231.00 1,760,460.00 0.00 1,554,139.00 1,514,412.00 1,596,334.08

PW-25-540

R-7265 Queen Mary Village Demolition

BASE BID (Basis for Award)