NOTICE- Design-Build State Route 280 (South Cobb Drive) Improvements

Open State & local contract opportunity Posted

Solicitation number
PE-63353-NONST-2027-000000047
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 25
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Smyrna, Georgia is soliciting Design-Build proposals for the State Route 280 (South Cobb Drive) Improvements Project, with the notice listing a March 5, 2027 due date and a Statement of Qualifications deadline of April 2, 2027 at 5:00 p.m. Eligibility is restricted to firms and team members holding Georgia Department of Transportation (GDOT) prequalification. The Design-Builder must be prequalified in Urban Roadway Design (Area Class 3.02) or Complex Urban Roadway Design (Area Class 3.03) for the land design consultant role, and team members must maintain GDOT prequalification in multiple area classes, including NEPA documentation, traffic projections and operations, landscape architecture, utility coordination, hydraulic and hydrological studies, land surveying, utility engineering, soil surveys, hazardous waste assessment, construction engineering, and erosion and sedimentation control. Six named firms are identified as conflicted and ineligible: Croy Engineering, LLC; Greg Malcom & Associates, Inc.; Geo-Hydro Engineering, Inc.; Lumenor Consulting Group, Inc.; Marr Traffic, Inc.; and New South Associates, Inc.

The project covers approximately 1.65 miles of South Cobb Drive in Cobb County, from Concord Road to Windy Hill Road. Required design and construction elements include a 12-foot shared-use path on both sides, two through lanes and local access lanes in each direction, raised landscaped buffers, a raised median, curb and gutter, roadway lighting, storm drainage enhancements with two culvert improvements, one new traffic signal, reconstruction of six existing traffic signals, driveway modifications, and realignment of Plaza Drive. The Design-Builder must field a DB Project Manager, Preconstruction Project Manager, Construction Project Manager, and Utility Liaison. Selection uses a two-phase process under GDOT's Design-Build methodology, with the apparent successful proposer determined by the highest overall score among proposers meeting RFQ/P requirements.

The notice does not name a contract value, incumbent, or funding source. The tentative schedule lists a virtual Industry Forum on November 27, 2027 at 8:00 a.m. (pre-recorded presentation), a Request for Qualifications issuance on March 5, 2027, notice to finalists on April 16, 2027 at 11:00 a.m., Request for Proposals issuance on April 30, 2027 at 10:00 a.m., proposal receipt on May 28, 2027, bid opening on May 31, 2027 at 9:00 a.m., and city letting on June 14, 2027. The City of Smyrna may adjust this schedule in its sole discretion. Communications run through the Georgia Procurement Registry and BidNet Direct, with project identification number 0018265 and City of Smyrna Project No. 27-006.

Opportunity text

City of Smyrna, GA P.I. Number: 0018265 The City of Smyrna is providing the following documents to notify interested firms of this upcoming project: *Special Notice to Contractors - Design-Build State Route 280 (South Cobb Drive) Improvements *Public Notice Advertisement PNA-006-11132026DB to provide Design-Build Services for SR 280 (South Cobb Drive) Improvements Project

Files

File Type Posted
NTC_South Cobb Drive_City of Smyrna.pdf PDF
PNA_South Cobb Drive_City of Smyrna.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors