NTC_South Cobb Drive_City of Smyrna.pdf

PDF 266 KB Posted

Attached to
NOTICE- Design-Build State Route 280 (South Cobb Drive) Improvements
Solicitation number
PE-63353-NONST-2027-000000047
Issued by
Cobb County, Georgia

About this file

This is a Special Notice to Contractors issued by the City of Smyrna, Georgia, announcing a Design-Build project for the State Route 280 (South Cobb Drive) Improvements Project. The City of Smyrna seeks a Design-Builder to provide comprehensive design and construction services for corridor improvements spanning approximately 1.65 miles, beginning at the intersection of South Cobb Drive and Concord Road and ending at South Cobb Drive and Windy Hill Road. The proposed scope includes a 12-foot shared-use path on both sides of the roadway, local access lanes in each direction, two through lanes in each direction, raised landscaped buffers, a raised median, curb and gutter, roadway lighting, storm drainage enhancements including two culvert improvements, installation of one new traffic signal, reconstruction of six existing traffic signals, driveway modifications, and realignment of Plaza Drive. The Request for Qualifications/Proposals (RFQ/P) will contain project-specific instructions, selection methodology, points of contact for inquiries, and communication protocols. The project follows the Georgia Department of Transportation's Design-Build process. A Virtual Industry Forum presenting the project's delivery goals, anticipated scope, procurement process, and potential risks will be published to the City of Smyrna website, with presentation slides available at the designated project website.

The City of Smyrna reserves the right to adjust the tentative schedule of events in its sole discretion. All prospective proposers are responsible for monitoring the Georgia Procurement Registry (GPR) and Smyrna Purchasing Division bidding platforms at https://ssl.doas.state.ga.us/gpr and https://www.bidnetdirect.com/georgia/cityofsmyrna for regular updates, clarifications, and announcements throughout the solicitation process. General communication regarding this solicitation will be distributed via GPR through advertisement of the RFP. The project identification number is 0018265 with the City of Smyrna Project No. 27-006. No pricing terms, set-asides, incumbent information, funding requirements, or contract award dates are specified in this notice.

View the file

Other files

File Type Posted
PNA_South Cobb Drive_City of Smyrna.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e | 1 of 1

SPECIAL NOTICE TO CONTRACTORS

THE CITY OF SMYRNA, GEORGIA ANNOUNCES

DESIGN-BUILD PROJECT

The City of Smyrna intends to advertise and proposes to let a Design-Build (DB) project for design and construction services necessary to construct the State Route 280 (South Cobb Drive) Improvements Project, in Smyrna, GA.

The Public Notice Advertisement (PNA) is issued through the Georgia Procurement Registry (GPR) at https://ssl.doas.state.ga.us/gpr and Smyrna Purchasing Division at https://www.bidnetdirect.com/georgia/cityofsmyrna.

The subsequent Request for Qualifications/Proposals (RFQ/P) will contain project-specific instructions for the proposed project, including the DB Selection Method, the point of contact for written questions, and any communication restrictions that may be in effect for this solicitation. The project will follow the Georgia Department of Transportation’s (Georgia DOT’s) Design-Build process. Information regarding Georgia DOT’s Design-Build process can be reviewed at the following website: https://www.dot.ga.gov/GDOT/Pages/DesignBuild.aspx.

GENERAL PROJECT INFORMATION

Project Identification Number 0018265 / City of Smyrna Project No. 27-006 State Route 280 (South Cobb Drive) Improvement Project.

The City of Smyrna is seeking to contract with a Design-Builder to provide design and construction services necessary to construct improvements to the State Route 280 (South Cobb Drive) corridor in Smyrna, Georgia. The project begins at the intersection of South Cobb Drive and Concord Road and ends at the intersection of South Cobb Drive and Windy Hill Road. The corridor improvement project spans approximately 1.65-miles. Proposed improvements include a 12-foot shared-use path on both sides of the roadway, a local access lane in each direction, two through lanes in each direction, raised landscaped buffers separating the through lanes from the local access lanes, and a raised median separating opposing traffic movements. Additional improvements include curb and gutter, roadway lighting along the shared-use paths and local access lanes, storm drainage enhancements including two culvert improvements, installation of one new traffic signal, reconstruction of six existing traffic signals, driveway modifications, and the realignment of Plaza Drive.

The project synopsis is located by Smyrna Purchasing Division at https://www.bidnetdirect.com/georgia/cityofsmyrna and Smyrna City projects at https://www.smyrnaga.gov/departments/ administration/city-administrator/city-projects/south-cpbb-drove-project.

TENTATIVE SCHEDULE OF EVENTS

The Tentative Schedule of Events listed in the PNA posted on the GPR and Smyrna Purchasing Division represent the City of Smyrna’s best estimate of the schedule. All times indicated are prevailing times in Smyrna, Georgia. The City of Smyrna reserves the right to adjust the Tentative Schedule of Events in its sole discretion.

The Project- specific PNA can be found on the GPR at: https://ssl.doas.state.ga.us/gpr/ and https://www.-bidnetdirect.com/georgia/cityofsmyrna.

All general communication of relevant information regarding this solicitation will be made via the GPR through the advertisement of the RFP. All Proposers that respond to a City of Smyrna-issued Design-Build solicitation, are responsible for checking the GPR on a regular basis for updates, clarifications, and announcements.

A Virtual Industry Forum will be published to the City of Smyrna website. The Industry Forum presentation will provide information regarding the Project’s delivery goals, anticipated scope, anticipated DB procurement process, and potential risks. Any information provided by the City of Smyrna or shall be considered informational only and is subject to change. Presentation slide show will be available at: https://www.smyrnaga.gov/r/city-projects/south-cpbb-drove-project.

File details come from the government source that posted it. Updated .