Mill Creek Parking Lot FDR Project
Open State & local contract opportunity Posted
- Solicitation number
- PE-61600-NONST-2027-000000069
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91276 Striping Streets, Parking Facilities, Lane Divisions, Etc. (Paint)
- 91327 Construction, Highway And Road
- 91336 Construction, Parking Lot And Alley
- 91345 Construction, Sewer And Storm Drain
- 91394 Paving/Resurfacing, Alley And Parking Lot
- UNSPSC codes
- 72141511 Digging services
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
Show all 40
- 72141001 Highway and road new construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 72153700 Parking facility construction and equipment installation and maintenance and repair services
- 95121645 Motorway service area
- 95121644 Parking lot
- 72141123 Manhole construction service
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72152708 Parking lot construction service
- 95121646 Bicycle parking rack
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- Point of contact
-
- Peyton Fuller pfuller@bullochcounty.net (912) 764-0165
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Bulloch County Board of Commissioners is soliciting sealed bids for the Mill Creek Parking Lot FDR Project (FY27-ENGCP-005-5), with bids due November 20, 2026 at 11:00 a.m. Bidders must be GDOT Prequalified Contractors, with current active approval as of the bid submission deadline as shown on GDOT's Directory of Prequalified Contractors webpage. Contractors must also be registered with E-Verify and provide a prequalified GDOT materials testing laboratory consultant.
The work is full depth reclamation of asphalt surface course into subgrade, with Portland cement mixed into the soil to form a soil-cement stabilized base. Scope also includes traffic control, grading, storm drainage, graded aggregate base, asphalt paving, signing and marking, and final stabilization. Bid quantities include 12,750 square yards of FDR at 6-inch depth, 350 tons of Portland cement, 1,450 tons of recycled asphalt concrete, three each of miscellaneous construction and drainage replacement, and lump sums for traffic control and construction material testing. All work must comply with the Georgia Department of Transportation Standard Specifications for Construction, 2021 edition. The County may increase or decrease quantities and will award to the lowest responsive and responsible bidder.
Bidders submit a 5 percent bid bond. The successful bidder furnishes performance and payment bonds each at 100 percent of the total contract price, and insurance including general comprehensive liability of $1 million per occurrence and $2 million aggregate, with auto liability at the same limits and the County as additional insured. Liquidated damages are $150 per calendar day for missing Substantial Completion or Final Acceptance. Payment is monthly within fifteen days of approved invoices, less 10 percent retainage.
Work begins upon Notice to Proceed, with Substantial Completion required by March 31, 2027 and Final Acceptance by April 30, 2027. Award is estimated for December 1, 2026 at a Board of Commissioners meeting. Bids are submitted to the Bulloch County Procurement Office at 115 N. Main Street, Statesboro, Georgia. The successful bidder must return signed contract documents, insurance certificates, and bonds within thirty days of award notification.
Opportunity text
The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Registered Contractors for the following project: FY27-ENGCP-005-5: Mill Creek Parking Lot FDR Project. The project consists of full depth reclamation of asphalt surface course into the subgrade, mixing Portland Cement into the soil to make a soil cement stabilized base. The project involves road construction operations including traffic control, grading, storm drainage, subgrade, graded aggregate base, asphalt paving, signing & marking, and final stabilization. All contractors seeking to provide construction delivery services to Bulloch County for this project shall submit evidence of current active approval as a GDOT Prequalified Contractor as of the bid submission deadline November 20, 2026, 11:00 AM EDT, as it appears on GDOT¿s Directory of Prequalified Contractors webpage.
Files
| File | Type | Posted |
|---|---|---|
| ENGCP_004_5 Mill Creek Exhibit.pdf | ||
| FY27_ENGCP_005_5 Mill Creek Parking Lot ITB F.pdf |
On GovTribe