Daytona Beach Ocean Center Electrical Switchgear Replacement

Closed State & local contract opportunity

Solicitation number
26-P-04LL
State
Florida
Responses due

Opportunity facts

Jurisdiction
NIGP codes
Show all 14
UNSPSC codes
Show all 33
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Volusia County, Florida is seeking qualified contractors to perform a comprehensive electrical switchgear replacement project at the Daytona Beach Ocean Center (RFP 26-P-04LL, Contract No. C-2055). The project scope encompasses complete removal and replacement of the existing main-tie-main double-ended switchboard and associated bus duct systems serving this premier event venue located at 101 North Atlantic Avenue, Daytona Beach, Florida 32118. The contractor must install a new 480Y/277V, 3-phase, 4-wire service-entrance-rated switchboard (Square D QED-2 model, 2000A capacity) with copper busway distribution, grounding system upgrades, feeder replacements, arc flash studies compliant with IEEE 1584-2018 standards, comprehensive testing protocols, and operations and maintenance documentation. Deliverables include shop drawings within 30 days of contract award, as-built AutoCAD documentation, comprehensive power system studies with short-circuit and protective device coordination analysis, manufacturer certifications, and one-year warranty on all work with extended warranties on metering devices (five years) and surge protective devices (ten years). Key objectives are to improve electrical system reliability and safety infrastructure, ensure compliance with current electrical codes (Florida Building Code 8th Edition 2023, NFPA 70-2020, NFPA 72), and establish a foundation for future facility expansions. The project must be substantially completed within 30 days of Notice to Proceed and fully completed within 35 days total. Required contractor qualifications include an active Florida-licensed building or general contractor license, an active Florida Certified Electrical Contractor (EC) as subcontractor, a superintendent with active Florida Journeyman's Electrical License and minimum four years' experience, at least five years of established business history, and a minimum of three references demonstrating completion of similar switchgear replacement projects within the past three years. Evaluation criteria are weighted on a 100-point scale as follows: Technical Qualifications and Experience (35 percent), Project Approach and Schedule (35 percent), Price and Total Cost (20 percent), and Safety, Quality Control and Resources (10 percent). Bidders must attend a mandatory pre-solicitation conference on March 10, 2026 (9:00 AM or 1:00 PM options) at the Ocean Center loading dock, submit written questions by March 26, 2026, and submit electronic proposals through the County's eProcurement Portal by April 9, 2026 at 3:00 PM EST.

No set-aside designations for disadvantaged enterprises or minority-owned businesses are indicated in the solicitation documents. The procurement is open to qualified prime contractors meeting the stated licensing and experience requirements, though the contractor must ensure all subcontractors maintain appropriate licenses and identical insurance coverage to the prime contractor. No incumbent vendors or current contractors are identified in the available documentation. The contractor must integrate with and coordinate around the Ocean Center's existing electrical systems, including coordination with utility provider Florida Power & Light (FPL) for service integration, adherence to the facility's event calendar blackout dates when construction is prohibited, and maintenance of the facility's weather-tight condition and continued operations during construction activities. Special operational conditions require contractors to provide four weeks' advance notice for any building entrance or exit closures and one week's notice for project extensions, secure the work site with six-foot chain link fencing with black liners, provide portable restrooms, and arrange for generator support depending on the number of dark days required. Contractors must also comply with comprehensive insurance requirements including Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Auto Liability ($1,000,000 combined single limit), Excess Liability ($2,000,000), and Installation Floater coverage, with the County named as additional insured and all policies issued by Florida-licensed insurers with A.M. Best ratings of A- or better. A payment and performance bond equal to 100 percent of the contract value is required prior to work commencement. The total contract price is listed as TBD (To Be Determined) with liquidated damages assessed at $1,000 per day for failure to meet the 35-day completion deadline.

Opportunity text

The project significantly improves electrical system reliability for one of Daytona Beach's premier event venues while enhancing safety infrastructure to protect both facility operations and public events. By replacing aging high voltage switchgear equipment with modern, reliable systems, the upgrades enhanced electrical distribution capacity and reliability for the Ocean Center facility. The implementation of upgraded safety systems and protection schemes ensured compliance with current electrical codes and standards, while also establishing a foundation for future facility expansions and improvements.

Files

File Type Posted
Daytona_Beach_Ocean_Center_Electrical_Switchgear_Replacement_(Addendum_#5_Revision).pdf PDF
Elec_One-Line_Diagram.jpg JPG image
FPL_vault_Photos.pdf PDF
Daytona_Beach_Ocean_Center_Electrical_Switchgear_Replacement_(Addendum_#1_Revision).pdf PDF
Daytona_Beach_Ocean_Center_Electrical_Switchgear_Replacement.pdf PDF
Daytona_Beach_Ocean_Center_Electrical_Switchgear_Replacement.pdf PDF
MASTER_Construction_Contract,_26-P-04LL,_C2055.pdf PDF
MASTER_Construction_Contract,_26-P-04LL,_C2055.pdf PDF
MASTER_Construction_Contract,_26-P-04LL,_C2055.pdf PDF
MASTER_Construction_Contract,_26-P-04LL,_C2055.pdf PDF
Tentative_Calendar.pdf PDF
Tentative_Calendar.pdf PDF
Tentative_Calendar.pdf PDF
Tentative_Calendar.pdf PDF
PRIME-SUB_FORM_for_Contractors_26-P-04LL,_C2055.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_26-P-04LL,_C2055.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_26-P-04LL,_C2055.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_26-P-04LL,_C2055.xls XLS spreadsheet
Project_Manual.pdf PDF
Project_Manual.pdf PDF
Project_Manual.pdf PDF
Project_Manual.pdf PDF
Construction_Plans.pdf PDF
Construction_Plans.pdf PDF
Construction_Plans.pdf PDF
Construction_Plans.pdf PDF
Payment_and_Performance_Bond,_26-P-04LL,_C2055.pdf PDF
Payment_and_Performance_Bond,_26-P-04LL,_C2055.pdf PDF
Payment_and_Performance_Bond,_26-P-04LL,_C2055.pdf PDF
Payment_and_Performance_Bond,_26-P-04LL,_C2055.pdf PDF
Basic_Insurance_Requirements,_26-P-04LL,_C2055.pdf PDF
Basic_Insurance_Requirements,_26-P-04LL,_C2055.pdf PDF
Basic_Insurance_Requirements,_26-P-04LL,_C2055.pdf PDF
Basic_Insurance_Requirements,_26-P-04LL,_C2055.pdf PDF
DBOC_Special_Conditions.pdf PDF
DBOC_Special_Conditions.pdf PDF
DBOC_Special_Conditions.pdf PDF
DBOC_Special_Conditions.pdf PDF
Construction_Bid_Forms_26-P-04LL,_C2055.pdf PDF
Construction_Bid_Forms_26-P-04LL,_C2055.pdf PDF
Construction_Bid_Forms_26-P-04LL,_C2055.pdf PDF
Construction_Bid_Forms_26-P-04LL,_C2055.pdf PDF
VC_Ocean_Center_-_Switchgear_Rep_Project_Manual_100%_CD_Vol_1of1.pdf PDF
VC_Ocean_Center_-_Switchgear_Rep_Project_Manual_100%_CD_Vol_1of1.pdf PDF
VC_Ocean_Center_-_Switchgear_Rep_Project_Manual_100%_CD_Vol_1of1.pdf PDF
VC_Ocean_Center_-_Switchgear_Rep_Project_Manual_100%_CD_Vol_1of1.pdf PDF
2025-05-13_Ocean_Center_Switchgear_Rep_100%CD_EL.pdf PDF
2025-05-13_Ocean_Center_Switchgear_Rep_100%CD_EL.pdf PDF
2025-05-13_Ocean_Center_Switchgear_Rep_100%CD_EL.pdf PDF
2025-05-13_Ocean_Center_Switchgear_Rep_100%CD_EL.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors