FPL_vault_Photos.pdf

PDF 18 MB Posted

Attached to
Daytona Beach Ocean Center Electrical Switchgear Replacement
Solicitation number
26-P-04LL
Issued by
Volusia County, Florida

About this file

FPL_vault_Photos.pdf Summary

This image file contains photographs related to the electrical infrastructure at the Daytona Beach Ocean Center, specifically documenting the existing electrical switchgear and vault systems that will be replaced as part of the comprehensive electrical switchgear replacement project (RFP 26-P-04LL, Contract No. C-2055) for Volusia County, Florida. The photographs serve as supporting documentation for the contract opportunity and provide visual reference of the current main-tie-main double-ended switchboard and associated electrical systems located at the facility at 101 North Atlantic Avenue, Daytona Beach, Florida 32118. A mandatory pre-solicitation conference is scheduled for March 10, 2026, with two session options at 9:00 AM or 1:00 PM at the Ocean Center loading dock. Written questions must be submitted by March 26, 2026, and electronic proposals are due through the County's eProcurement Portal by April 9, 2026, at 3:00 PM EST. The project requires substantial completion within 30 days of Notice to Proceed and full completion within 35 days total.

The contract involves replacement of the existing electrical equipment with a new 480Y/277V, 3-phase, 4-wire service-entrance-rated switchboard (Square D QED-2 model, 2000A capacity) and associated systems. The total contract price is to be determined (TBD), with liquidated damages assessed at $1,000 per day for failure to meet the 35-day completion deadline. No set-aside designations for disadvantaged or minority-owned businesses are indicated. Qualified prime contractors must hold an active Florida-licensed building or general contractor license, employ an active Florida Certified Electrical Contractor as subcontractor, and demonstrate a minimum five-year business history with three references for similar switchgear replacement projects completed within the past three years. The contractor must coordinate with Florida Power & Light (FPL) for utility service integration and comply with comprehensive insurance requirements including Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Auto Liability ($1,000,000 combined single limit), Excess Liability ($2,000,000), and Installation Floater coverage with the County named as additional insured.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .