PRIME-SUB_FORM_for_Contractors_26-P-04LL,_C2055.xls
XLS spreadsheet 47 KB Posted
- Solicitation number
- 26-P-04LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form submission document for Volusia County, Florida's electrical switchgear replacement project at the Daytona Beach Ocean Center (RFP 26-P-04LL, Contract No. C-2055). The form requires bidders to identify all proposed subcontractors and allocate the total bid price between the prime contractor and subcontractors across specified disciplines including General Contractor, Building Contractor, and Electrical Contractor work. Bidders must complete the form in its entirety, as failure to do so may result in a non-responsive bid designation. The document mandates that all cost allocations in green-shaded cells sum to 100 percent of the total bid price and that any subcontractor changes during project execution require prior approval from the County Project Manager. The county reserves the right to seek clarification on subcontractor qualifications and local preference determinations without permitting changes to the total base bid pricing.
The prime contractor bears responsibility for ensuring all subcontractors maintain appropriate licensing. The form serves dual purposes: documenting the proposed subcontracting plan and determining local bid preference in accordance with Section 2.8, D of the solicitation. Subcontractor cost allocations and percentages of work must be clearly itemized for each discipline, with blank rows provided for additional subcontractors whose disciplines fall outside the three primary categories listed. The template shows zero dollar values as placeholders, with actual bid amounts to be entered during the formal bidding process by the April 9, 2026 submission deadline at 3:00 PM EST through the County's eProcurement Portal.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2055 | ITB No. 26-P-04LL | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| Electrical Contractor (if not General or Building Contractor) | $ - 0 | 0.00% | |
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| General Contractor (if not Building or Electrical Contractor) | $ - 0 | 0.00% | |
| Building Contractor (if not General or Electrical Contractor) | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .