PRIME-SUB_FORM_for_Contractors_26-P-04LL,_C2055.xls
XLS spreadsheet 47 KB Posted
- Solicitation number
- 26-P-04LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime-Sub Form document for contractors bidding on RFP 26-P-04LL, Contract No. C-2055, issued by Volusia County, Florida for the Daytona Beach Ocean Center Electrical Switchgear Replacement project. The project encompasses complete removal and replacement of the existing main-tie-main double-ended switchboard and associated bus duct systems, installation of a new 480Y/277V, 3-phase, 4-wire service-entrance-rated switchboard (Square D QED-2 model, 2000A capacity) with copper busway distribution, grounding system upgrades, feeder replacements, arc flash studies compliant with IEEE 1584-2018 standards, comprehensive testing protocols, and operations and maintenance documentation. Deliverables include shop drawings within 30 days of contract award, as-built AutoCAD documentation, comprehensive power system studies with short-circuit and protective device coordination analysis, manufacturer certifications, and one-year warranty on all work with extended warranties on metering devices (five years) and surge protective devices (ten years). A mandatory pre-solicitation conference is scheduled for March 10, 2026 (9:00 AM or 1:00 PM options) at the Ocean Center loading dock, with written questions due by March 26, 2026, and electronic proposal submission through the County's eProcurement Portal required by April 9, 2026 at 3:00 PM EST. The project must be substantially completed within 30 days of Notice to Proceed and fully completed within 35 days total.
Required contractor qualifications include an active Florida-licensed building or general contractor license, an active Florida Certified Electrical Contractor (EC) as subcontractor, a superintendent with active Florida Journeyman's Electrical License and minimum four years' experience, at least five years of established business history, and a minimum of three references demonstrating completion of similar switchgear replacement projects within the past three years. Evaluation criteria are weighted on a 100-point scale as follows: Technical Qualifications and Experience (35 percent), Project Approach and Schedule (35 percent), Price and Total Cost (20 percent), and Safety, Quality Control and Resources (10 percent). No set-aside designations for disadvantaged enterprises or minority-owned businesses are indicated, and no incumbent vendors or current contractors are identified. The contract price is listed as TBD (To Be Determined) with liquidated damages assessed at $1,000 per day for failure to meet the 35-day completion deadline. Contractors must comply with comprehensive insurance requirements including Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Auto Liability ($1,000,000 combined single limit), Excess Liability ($2,000,000), and Installation Floater coverage, with the County named as additional insured and all policies issued by Florida-licensed insurers with A.M. Best ratings of A- or better. A payment and performance bond equal to 100 percent of the contract value is required prior to work commencement.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2055 | ITB No. 26-P-04LL | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| Electrical Contractor (if not General or Building Contractor) | $ - 0 | 0.00% | |
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| General Contractor (if not Building or Electrical Contractor) | $ - 0 | 0.00% | |
| Building Contractor (if not General or Electrical Contractor) | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .