Elec_One-Line_Diagram.jpg

JPG image 2 MB Posted

Attached to
Daytona Beach Ocean Center Electrical Switchgear Replacement
Solicitation number
26-P-04LL
Issued by
Volusia County, Florida

About this file

This is an electrical one-line diagram image file related to Volusia County, Florida's procurement for electrical switchgear replacement at the Daytona Beach Ocean Center. The diagram serves as a technical schematic illustrating the electrical system configuration for the facility located at 101 North Atlantic Avenue, Daytona Beach, Florida 32118. The project requires complete removal and replacement of the existing main-tie-main double-ended switchboard and associated bus duct systems, with installation of a new 480Y/277V, 3-phase, 4-wire service-entrance-rated switchboard (Square D QED-2 model, 2000A capacity). The mandatory pre-solicitation conference is scheduled for March 10, 2026, with two time options (9:00 AM or 1:00 PM) at the Ocean Center loading dock. Written questions must be submitted by March 26, 2026, and electronic proposals are due through the County's eProcurement Portal by April 9, 2026, at 3:00 PM EST. Substantial completion is required within 30 days of Notice to Proceed, with full completion within 35 days total. Deliverables include shop drawings within 30 days of contract award, as-built AutoCAD documentation, comprehensive power system studies, manufacturer certifications, and one-year standard warranty with extended warranties on metering devices (five years) and surge protective devices (ten years).

Qualified contractors must hold an active Florida-licensed building or general contractor license with an active Florida Certified Electrical Contractor (EC) as subcontractor, and a superintendent possessing an active Florida Journeyman's Electrical License and minimum four years' experience. Bidders must demonstrate at least five years of established business history and provide three references for similar switchgear replacement projects completed within the past three years. Evaluation criteria are weighted as follows: Technical Qualifications and Experience (35 percent), Project Approach and Schedule (35 percent), Price and Total Cost (20 percent), and Safety, Quality Control and Resources (10 percent). The contractor must coordinate with Florida Power & Light (FPL) for utility service integration and comply with comprehensive insurance requirements including Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Auto Liability ($1,000,000 combined single limit), and Excess Liability ($2,000,000). A payment and performance bond equal to 100 percent of the contract value is required prior to work commencement. Liquidated damages are assessed at $1,000 per day for failure to meet the 35-day completion deadline. No set-aside designations for disadvantaged or minority-owned businesses are indicated, and no incumbent vendors or current contractors are identified.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .