Daytona Beach Ocean Center Electrical Switchgear Replacement
Solicitation number
26-P-04LL
Issued by
Volusia County, Florida

About this file

This Tentative Calendar document outlines the project schedule for the Daytona Beach Ocean Center Electrical Switchgear Replacement project managed by the City of Daytona Beach, Florida. The document establishes key milestones and timelines for the replacement of aging high-voltage switchgear equipment at the Ocean Center facility. The calendar identifies critical dates for project phases including design, permitting, procurement, and construction activities. Site coordination and facility access requirements are referenced to accommodate the ongoing operations of the premiere event venue during the renovation period. The schedule reflects the phased approach necessary to minimize disruption to the facility's event calendar while systematically upgrading the electrical distribution infrastructure.

The tentative calendar serves as a planning tool to ensure all stakeholders, including contractors, subcontractors, and facility management, maintain alignment on project sequencing and critical path activities. The document provides flexibility for schedule adjustments based on permitting timelines, material lead times, and unforeseen site conditions. Coordination with the Ocean Center's event schedule is essential, as the facility continues operating during construction. The project's phased timeline allows for systematic replacement of switchgear components while maintaining electrical system functionality and ensuring compliance with current electrical codes and safety standards throughout the renovation process.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .