Tentative_Calendar.pdf
PDF 10 MB Posted
- Solicitation number
- 26-P-04LL
- Issued by
- Volusia County, Florida
About this file
This is a tentative project calendar document for Volusia County, Florida's electrical switchgear replacement project at the Daytona Beach Ocean Center. The project encompasses the complete removal and replacement of the existing main-tie-main double-ended switchboard and associated bus duct systems, including installation of a new 480Y/277V, 3-phase, 4-wire service-entrance-rated switchboard (Square D QED-2 model, 2000A capacity) with copper busway distribution, grounding system upgrades, feeder replacements, and comprehensive electrical studies. Key project milestones include a mandatory pre-solicitation conference scheduled for March 10, 2026, with two time options available (9:00 AM or 1:00 PM) at the Ocean Center loading dock; a written question submission deadline of March 26, 2026; and an electronic proposal submission deadline of April 9, 2026 at 3:00 PM EST through the County's eProcurement Portal. The project must achieve substantial completion within 30 days of Notice to Proceed and full completion within 35 days total, with deliverables including shop drawings within 30 days of contract award, as-built AutoCAD documentation, comprehensive power system studies, and one-year warranty on all work.
Contractor qualifications require an active Florida-licensed building or general contractor license, an active Florida Certified Electrical Contractor subcontractor, a superintendent with active Florida Journeyman's Electrical License and minimum four years' experience, at least five years of established business history, and a minimum of three references for similar switchgear projects completed within the past three years. The evaluation criteria are weighted on a 100-point scale: Technical Qualifications and Experience (35 percent), Project Approach and Schedule (35 percent), Price and Total Cost (20 percent), and Safety, Quality Control and Resources (10 percent). The total contract price is listed as TBD with liquidated damages assessed at $1,000 per day for failure to meet the 35-day completion deadline. Comprehensive insurance requirements include Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Auto Liability ($1,000,000 combined single limit), and Excess Liability ($2,000,000), with a payment and performance bond equal to 100 percent of the contract value required prior to work commencement. No set-aside designations for disadvantaged or minority-owned businesses are indicated, and the procurement is open to qualified prime contractors meeting the stated requirements.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .