Tentative Calendar for Daytona Beach Ocean Center Electrical Switchgear Replacement

This tentative calendar document outlines the project timeline for Volusia County, Florida's electrical switchgear replacement project at the Daytona Beach Ocean Center. The project encompasses complete removal and replacement of the existing main-tie-main double-ended switchboard and associated bus duct systems, including installation of a new 480Y/277V, 3-phase, 4-wire service-entrance-rated switchboard (Square D QED-2 model, 2000A capacity) with copper busway distribution, grounding system upgrades, and comprehensive testing protocols. Key milestones include a mandatory pre-solicitation conference scheduled for March 10, 2026, with two time options (9:00 AM or 1:00 PM) at the Ocean Center loading dock; a written questions submission deadline of March 26, 2026; and an electronic proposal submission deadline of April 9, 2026, at 3:00 PM EST through the County's eProcurement Portal. Following Notice to Proceed, the contractor must substantially complete the project within 30 days and achieve full completion within 35 days total. Shop drawings must be submitted within 30 days of contract award, with deliverables including as-built AutoCAD documentation, power system studies with short-circuit and protective device coordination analysis, manufacturer certifications, and comprehensive operations and maintenance documentation.

The contract pricing is listed as TBD (To Be Determined), with liquidated damages assessed at $1,000 per day for failure to meet the 35-day completion deadline. No set-aside designations for disadvantaged or minority-owned enterprises are indicated. The procurement is open to qualified prime contractors meeting Florida licensing and experience requirements, though no incumbent vendors or current contractors are identified in available documentation. Contractors must maintain comprehensive insurance coverage including Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Auto Liability ($1,000,000 combined single limit), Excess Liability ($2,000,000), and Installation Floater coverage, with a 100 percent payment and performance bond required prior to work commencement. Special operational conditions require contractors to adhere to the facility's event calendar blackout dates, provide four weeks' advance notice for building entrance or exit closures, coordinate with Florida Power & Light for service integration, and maintain the facility's weather-tight condition and continued operations during construction.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .