PRIME-SUB_FORM_for_Contractors_26-P-04LL,_C2055.xls
XLS spreadsheet 47 KB Posted
- Solicitation number
- 26-P-04LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for ITB No. 26-P-04LL, Contract No. C-2055, issued by Daytona Beach, Florida for the Ocean Center Electrical Switchgear Replacement project. The form requires bidders to identify all proposed subcontractors and detail the scope of work each will perform. The project involves replacing aging high voltage switchgear equipment with modern systems to improve electrical reliability, enhance safety infrastructure, and ensure compliance with current electrical codes at the Ocean Center facility. Bidders must complete and return this form as a mandatory requirement; failure to do so may result in a non-responsive bid designation.
The form requires bidders to allocate dollar values and percentages of work to the prime contractor and all subcontractors across specified disciplines including general, building, and electrical contractors. All green-shaded cells must be completed with dollar values that total the submitted base bid price and collectively equal 100 percent of the work. The prime contractor bears responsibility for verifying that all subcontractors maintain appropriate licenses, and any changes to proposed subcontractors during project execution require prior written approval from the County Project Manager. The County reserves the right to request clarification on subcontractors but will not permit changes to total bid pricing. This form is also used to determine local preference eligibility in accordance with Section 2.8(D) of the solicitation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2055 | ITB No. 26-P-04LL | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| Electrical Contractor (if not General or Building Contractor) | $ - 0 | 0.00% | |
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| General Contractor (if not Building or Electrical Contractor) | $ - 0 | 0.00% | |
| Building Contractor (if not General or Electrical Contractor) | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |