This Special Conditions document pertains to the Daytona Beach Ocean Center Electrical Switchgear Replacement project in Volusia County, Florida. The project involves replacing aging high voltage switchgear equipment to improve electrical system reliability and enhance safety infrastructure at the Ocean Center facility. Contractors must coordinate work activities around the Ocean Center's scheduled events, with a blackout dates calendar provided identifying when construction is prohibited. The Ocean Center will designate staging areas in proximity to the project site, though these areas may be relocated as needed to accommodate ongoing events and operational requirements. Contractors are required to provide four weeks' advance notice for any building entrance or exit closures or work affecting direct building access, and one week's notice for any extensions beyond approved timeframes. Work shifts may extend to 24 hours per day, seven days per week to meet project timelines and minimize electrical outages.

Contractors are responsible for all site security and staging area protection, requiring six-foot chain link fencing with black liners and proper signage, as well as portable restrooms. All equipment, tools, and supplies must be secured in designated staging areas at the end of each workday, and parking is restricted to designated areas only. Contractors must provide a generator depending on the number of dark days required for switchgear replacement and the Ocean Center's event schedule. Volusia County will not direct the contractor's means, methods, or work schedule, allowing the contractor flexibility in project execution while maintaining compliance with the special conditions.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL CONDITIONS

Contractors will work around the Ocean Center scheduled events.

The events Calender will be provided for the project timeframe identifying blackout dates with no construction permitted. The Calander is subject to change.

The Ocean Center will set up the location of staging areas and will make the best efforts to be close to the project area. Staging area may be relocated for the ongoing events and client’s needs.

Contractors must park in designated areas only. Parking on sidewalks or outside dedicated workspace is prohibited.

Contractors will provide portable restrooms/ porta johns

Contractors are responsible for securing their work site and staging areas with 6-foot chain link fence with black liner and proper signage. All equipment, tools and supplies must be secured at the end of day is agreed staging areas.

The Ocean Center will need 4-week advanced notice for any closures of building entrances/ exits or work affecting direct building access. Extensions beyond approved time will need 1 week’s notice.

The Contractor may need to supply a generator depending on the number of dark days for the areas served by the switchgear replacement and the Ocean Centers scheduled events.

Volusia County will not direct means or methods of replacement or work schedule to the contractor. There may be a time when the scheduled work shift will be 24 hours a day 7 days a week to ensure project timeline is achieved and minimal dark days.