2026 City of Decatur Parkwood Traffic Calming Improvements at East Lake Road, US 278/SR10
Closed State & local contract opportunity Posted
- Solicitation number
- PE-64458-NONST-2026-000000029
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
Show all 28
- 95111611 Trunk road
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72141127 Seal coating of roads, highways and parking lots
- 72141003 Highway and road maintenance service
- 73151502 Joint sealing services
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
- 72141001 Highway and road new construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- Point of contact
-
- Julie Harlan julie.harlan@decaturga.com (404) 987-7572
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Decatur is soliciting sealed bids for the Parkwood Traffic Calming Improvements at East Lake Road and US 278/SR10, with bids due July 21, 2026 at 2:00 p.m., and a mandatory pre-bid conference on June 25, 2026 at 10:00 a.m. at 2635 Talley Street; attendance at the briefing is required for bid consideration.
The scope encompasses traffic control, selective demolition, curb and concrete sidewalk installation, milling and paving, signage, roadway pavement markings, striping, erosion control measures, and landscaping across approximately 683 linear feet of roadway (205 linear feet of East Parkwood entry roadway, 345 linear feet of East Lake Road, and 133 linear feet of East Parkwood Road) with a total construction area of 0.88 acres. Three driveway improvements, ADA-compliant concrete sidewalks with ramps, and landscape planting with one-year warranty are included. All work must conform to the State of Georgia Department of Transportation Standard Specifications for Construction of Roads and Bridges (January 21, 2021 edition), 2024 Supplemental Specifications, and GDOT 2025 Construction Standards and Details as modified by the City of Decatur's Special Provisions. The contractor must maintain a full-time experienced superintendent on-site, comply with E-Verify and non-discrimination provisions, and warrant all workmanship and materials for one year or the manufacturer's warranty period, whichever is greater.
The contract is structured as a lump-sum bid with unit prices for additions and deductions. A 5% bid surety bond (not certified checks) is required with submission. The successful bidder must provide a combined Performance Bond and Payment Bond equal to 200% of the contract sum. The contractor must commence work within ten days of Notice to Proceed and complete all work within 210 consecutive calendar days; liquidated damages are assessed at $500 per calendar day of delay beyond the completion date. Bids remain firm for 60 days following opening. Written questions are due by noon on June 30, 2026 to Julie Harlan, Active Transportation Director.
Opportunity text
The City of Decatur is soliciting sealed bids for the City of Decatur, Parkwood Traffic Calming Improvements at East Lake Road, US 278/SR10 project. The work includes traffic control, selective demolition, installation of curb, concrete curb and sidewalk, milling and paving, signage, roadway pavement markings, striping, erosion control measures, landscaping, and similar items.
Files
| File | Type | Posted |
|---|---|---|
| Project Manual _ Parkwood Calming Improvement.pdf | ||
| Addendum _1 2026_6_16 PARKWOOD SET compressed.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity