Amendment 0015 to Super Hornet Procurement B, Package 005 (Organizational Level Maintenance Hangar) and Package 001A/B (Base Infrastructure)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912ER21R0025
- Agency
-
ENDIST Middle East
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Kuwait
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Middle East seeks to award a firm-fixed price contract to construct a new Organizational Level Maintenance Hangar with eight aircraft bays and associated shop spaces, along with an adjacent Organizational Level Corrosion Control Hangar with two additional aircraft bays at Al Jaber Air Base in Kuwait. Offerors must submit proposals through ProjNet by January 24, 2022 and the agency intends to award by March 1, 2022. Evaluation will be based on technical qualifications, past performance, and price.
There is no set-aside designation. The primary NAICS code is 237310 and PSC code S206. The incumbent is the current maintenance provider at Al Jaber Air Base. The estimated value is over $25 million for construction services to be completed within 24 months of award at the base in Kuwait. The scope includes eight aircraft bays, two additional corrosion control bays, vehicle parking sunshades, and related site improvements to support the U.S. military's F/A-18 aircraft fleet.
Notice text
18 versions
Update #18 · Latest ·
The purpose of this Amendment 0015 is to extend the proposal due date. See attachment for details.
Update #17 ·
The purpose of this Amendment 0014 is to extend proposal due date. See attachment for details.
Update #16 ·
The purpose of this Amendment 0013 is to (1) Revise/Add the Specifications, (2) Revise the Draw ings, (3) Replace DFARS 252.225-7045 Balance of Payments Program - Construction Material Under Trade Agreements w ith Deviation 2020-O0019 Rev 2 252.225-7045 Balance of Payments Program - Construction Material Under Trade Agreements, and (4) Open ProjNet for last minute inquiries.
Update #15 ·
The purpose of this Amendment 0012 is to (1) Revise the drawings and (6) Extend the proposal due date.
Update #14 ·
The purpose of this Amendment 0011 is to (1) Revise/add the specifications, (2) Revise the drawings, (3) Revise Factor 3 Preliminary Schedule, (4) Revise FAR 52.217-7 Option for Increased Quantity--Separately Priced Line Item and Delete Deviation 2021-O0009 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors, (5) Add option numbers to option CLINs, and (6) Extend the proposal due date.
Update #13 ·
The purpose of this Amendment 0010 to extend the Proposal Due Date.
Update #12 ·
The purpose of this Amendment 0009 version is to inlcude drawings: "DRAWING DOCUMENT VOL 3 FOR PKG 1B".
Update #11 ·
The purpose of this Amendment 0009 is to (1) amend the specifications and add the package 1B specif ication packages, (2) add the
package 1B draw ings, (3) replace the proposal schedule and cost breakdow n sheet, and (4) extend the proposal due date.
Update #10 ·
The purpose of this Amendment 0008 is to (1) amend the specifications, (2) amend the drawings, and (3) release the package 1A draw ings that were not able to be uploaded in the previous Amendment 0007.
Update #9 ·
The purpose of this Amendment 0007 is to (1) amend the specifications, (2) amend the drawings, (3) include the Class Deviation 2021-O0009, and (4) extend the proposal due date.
Due to technical issues, TAM could not issue file "Proc B Pkg 1A Drawings" as part of this Amendment 0007. However, our intent is to inlcude the file with another forthcoming Amendment.
Update #8 ·
The purpose of this Amendment 0006 is to extend the proposal due date.
Update #7 ·
The purpose of this Amendment 0005 is to (1) revise the Drawings, (2) revise Section 00 21 00, and (3) revise Section 00 73 00.
The proposal due date is not affected by this Amendment 0005 and it is still due not later than October 8th, 2021 by 4:00PM Eastern Daylight Time.
Update #6 ·
The purpose of this Amendment 0004 is to revise/replace/extend Specifications, Drawings, Proposal Schedule and Cost Breakdown Sheet, Solicitation and Proposal Due Date.
Update #5 ·
Preproposal Conference Slides for Solicitation W912ER21R0025 Super Hornet Procurement B, Kuwait has been uploaded for your information.
This is a standalone release, not part of any Amendments to the Solicitation.
Update #4 ·
Amendment 0003 to Solicitation W912ER21R0025 Super Hornet Procurement B, Kuwait has been issued to: (1) provide pre-proposal conference dial-in and WebEx information, (2) provide the updated cost breakdown schedule and proposal schedule, (3) provide the updated specs package, and (4) provide the updated drawings package.
Update #3 ·
Amendment 0002 to Solicitation W912ER21R0025 Super Hornet Procurement B, Kuwait has been issued to change
the in-person pre-proposal conference to a virtual conference.
Update #2 ·
Amendment 0001 to Solicitation W912ER21R0025 Super Hornet Procurement B, Kuwait has been issued as follows:
1. Due to technical difficulties with the sam.gov website, the U.S. Army Corps of Engineers Transatlantic Middle East District were unable to upload Volumes 1 and 2 of the drawings (DRAWINGS VOL 1 -- KU472118-2_CLIN 1A_18JAN21 & DRAWINGS VOL 2 -- KU472118-2_CLIN 5_06JAN21U) on July 19, 2021. These difficulties have been resolved and the files are uploaded to sam.gov website as follows:
a. DRAWINGS VOL 1 -- KU472118-2_CLIN 1A_18JAN21_Part 1 through Part 4
b. DRAWINGS VOL 2 -- KU472118-2_CLIN 5_06JAN21U_Part 1 through Part 5
2. On SF1442 Block 13A, Proposal Due date has been revised to read as 8 September 2021 by 4:00PM.
APPENDIX A (RFP Attachments) W912ER21R0025 Super Hornet Procurement B Kuwait word document is included for your convenience. You proposals are due not later than September 8th, 2021 by 4:00PM Eastern Daylight Time (EDT). All inquiries regarding this solicitation are to be submitted via Bidder Inquiry through ProjNet at https://www.projnet.org/projnet/ (See soliciation for details).
Update #1 ·
Solicitation W912ER21R0025 - Super Hornet Procurement B, Kuwait is hereby issued for the construction of a new Organizational Level Maintenance Hangar with eight aircraft bays and associated shop spaces. The project includes construction of an adjacent Organizational Level Corrosion Control Hangar with two additional aircraft bays (one for corrosion control and one for a wash bay), associated corrosion control shop spaces, vehicle parking sunshades, related site improvements, and incidental related work.
All inquiries must be asked through ProjNet to receive a response, as specified in the solicitation.
This project is located at the Al Jaber Air Base in Kuwait.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity