This amendment modifies an existing solicitation for the construction of an organizational level maintenance hangar and base infrastructure in Kuwait. The amendment revises specifications and drawings, and provides the package 1A drawings that were unavailable in the previous revision. Offerors must acknowledge receipt of this amendment by the proposal due date of December 6, 2021 at 4:00PM Eastern Standard Time. The original solicitation, number W912ER21R0025, was issued by the Department of the Army Corps of Engineers Engineering District Middle East for the construction of a new organizational level maintenance hangar with ten aircraft bays and associated facilities, along with site improvements and incidental work, at Al Jaber Air Base in Kuwait.
View the file
Other files
Show 40 more
Latest 50 of 84 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
480569
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0008 is to (1) amend the specifications, (2) amend the draw ings, and (3) release the package 1A draw ings that w ere not able to be uploaded in the previous Amendment 0007.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Nov-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ER21R0025
X 9B. DATED (SEE ITEM 11)
19-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Nov-2021
CODE
US ARMY CORPS OF ENGINEERS-CETAM-CT
MIDDLE EAST DISTRICT, CETAM-CT
PO BOX 2250
WINCHESTER VA 22604-1450
W912ER 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ER21R0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION PAGE
SUBJECT: Amendment 0008 to W912ER21R0025 Super Hornet Procurement B, Kuwait has been issued to revise the following:
1. Specifications: Revised sections are replaced in their entirety. Revisions to the specification pages are shown on the pages in the following manner: New text is underlined, and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the new or revised sections.
The following have been revised/added:
VOLUME 2 (Package 1A, Base Infrastructure (for Package 5)):
Section 33 16 15 Paragraph 2.1.3, page 6 Paragraph 2.1.5, pages 6-7 Paragraph 3.4, page 10 Paragraph 3.5, page 10
VOLUME 4 (Package 5, Organizational Level Maintenance Hangar):
Table of Contents – replaced in its entirety
Section 26 05 19.10 10 Paragraph 2.1.3.2, page 5 Paragraph 2.1.4.1, page 6
Section 26 20 00 Paragraph 2.8.1.2.a, page 15 Paragraph 2.8.3, page 16 Paragraph 2.24, pages 30-32
Section 33 01 50 Added in its entirety.
2. Drawings: The following drawings have been revised per this amendment. Revisions are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.
Package 1A, Base Infrastructure (for Package 5):
G-011 G-012 G-013
Site Design – Electrical
XE-150
XE-451
XE-452
Facility P
F-004 F-101 F-201 F-301 F-302 F-401 F-402 F-501 F-504 F-601 F-901 F-902
Package 5, Organizational Level Maintenance Hangar:
G-010 G-011 G-015 G-016 G-020 G-025
Facility D
F-403 F-404 F-406 F-501 E-001 E-112 E-121 E-122 E-123 E-612 E-613
Facility J
F-104 F-303 F-410 F-411 F-412 F-413 F-414 F-415 F-416 F-417 F-501 F-502 F-503 E-121 E-123 E-131
E-132 E-133 E-134 E-135 E-136 E-137 E-601 E-608 E-622 E-623
Facility N
E-111
Facility S Standard Details
SE-501
SE-502
SE-503
3. Amendment 0007 drawing: The package 1A drawings file was corrupted and could not be uploaded in the previous amendment. This file has successfully been uploaded to SAM.gov along with the spec and drawing revisions in this Amendment 0008.
4. Proposal Due Date: Your proposal due date remains unchanged and it is due on December 6th, 2021 by 4:00PM Eastern Standard Time.