A154_Amendment 0013 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf
PDF 402 KB Posted
- Solicitation number
- W912ER21R0025
About this file
This amendment modifies a solicitation for the construction of an organizational level maintenance hangar and base infrastructure at Al Jaber Air Base in Kuwait. The scope of work includes construction of an organizational level maintenance hangar with eight aircraft bays and associated shop spaces, an adjacent corrosion control hangar with two additional aircraft bays and shop spaces, vehicle parking sunshades, and related site improvements. The amendment revises specifications and drawings, replaces a DFARS clause, and reopens the question submission period through ProjNet until January 12th, 2022. Proposals remain due on January 18th, 2022 by 10:00 AM Eastern Standard Time. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Middle East for construction services located at Al Jaber Air Base in Kuwait.
View the file
Other files
Show 40 more
Latest 50 of 84 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
480569
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0013 is to (1) Revise/Add the Specifications, (2) Revise the Draw ings, (3) Replace DFARS 252.225-7045 Balance of Payments Program - Construction Material Under Trade Agreements w ith Deviation 2020-O0019 Rev 2 252.225-7045 Balance of Payments Program - Construction Material Under Trade Agreements, and (4) Open ProjNet for last minute inquiries.
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ER21R0025
X 9B. DATED (SEE ITEM 11)
19-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jan-2022
CODE
US ARMY CORPS OF ENGINEERS-CETAM-CT
MIDDLE EAST DISTRICT, CETAM-CT
PO BOX 2250
WINCHESTER VA 22604-1450
W912ER 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ER21R0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION PAGE
SUBJECT: Amendment 0013 to W912ER21R0025, Superhornet F-18 Base Infrastructure for Package 5 and Organizational Level Maintenance Hangar (Packages 1A, 5 and 1B), Al Jaber Air Base, Kuwait
1. Specifications: Revised sections for existing volumes are replaced in their entirety. Revisions to the existing specification pages are shown on the pages in the following manner: New text is underlined and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the new or revised sections.
The following have been revised/added:
VOLUME 2 of 7 (Package 1A, Base Infrastructure (for Package 5)):
Section 01 50 00
Paragraph 1.2, pages 3-4 Paragraph 1.3-1.3.1, page 4 Paragraphs 1.4-1.5, pages 5-6
Section 21 13 13.00 11
Paragraph 1.6.1, page 8
VOLUME 4 of 7 (Package 5, Org Level Maintenance Hangar):
Section 05 12 00
Paragraph 2.5, page 10
Section 07 27 19.01
Paragraph 1.9.2, page 7
Section 21 13 13.00 11
Paragraph 1.6.1, page 8
Section 23 30 00
Paragraph 2.10.2.1, page 19
VOLUME 6 of 7 (Package 1B, Organizational Level Maintenance Hangar):
2. Drawings: The following drawings have been revised per this amendment. Revisions are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.
Package 1A, Base Infrastructure (for Package 5):
G-011
1A Site
CU101
CU112
CU115
CU201
CU601
Package 5, Organizational Level Maintenance Hangar:
G-010 G-011 G-015 G-016 G-020
Facility D
A-302 A-310 A-312 A-501 A-602 M-601 T-103 T-104
Facility J
A-201 A-204 A-602 A-603 T-103 T-105 T-107
Facility N
A-601
3. Solicitation:
Section 00 72 00:
The Defense Federal Acquisition Regulation Supplement (DFARS) 252.225-7045 Balance of Payments Program--Construction Material Under Trade Agreements has been removed and is hereby replaced with the following Deviation 2020-O0019 Rev 2, 252.225-7045 Balance of Payments Program--Construction Material Under Trade Agreements.
252.225-7045 Balance of Payments Program--Construction Material Under Trade Agreements.
(DEVIATION 2020-O0019) (JUL 2020)
(a) Definitions. As used in this clause—
“Caribbean Basin country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
“Commercially available off-the-shelf (COTS) item”—
(i) Means any item of supply (including construction material) that is—
(A) A commercial item (as defined in paragraph (1) of the definition of “commercial item” in section 2.101 of the Federal Acquisition Regulation);
(B) Sold in substantial quantities in the commercial marketplace; and
(C) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(ii) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. 40102), such as agricultural products and petroleum products.
“Component” means any article, material, or supply incorporated directly into construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(i) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(ii) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Designated country” means—
(i) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World Trade Organization as “the Separate Customs Territory of Taiwan, Penghu, Kinmen, and Matsu” (Chinese Taipei)), Ukraine, or the United Kingdom);
(ii) A Free Trade Agreement country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Panama, Peru, or Singapore);
(iii) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(iv) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.
Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
“Designated country construction material” means a construction material that is a WTO GPA country construction material, a Free Trade Agreement country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
“Domestic construction material” means—
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if—
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(B) The construction material is a COTS item.
“Free Trade Agreement country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a Free Trade Agreement country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Free Trade Agreement country into a new and different construction material distinct from the material from which it was transformed.
“Least developed country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a least developed country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
“United States” means the 50 States, the District of Columbia, and outlying areas.
“WTO GPA country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) This clause implements the Balance of Payments Program by providing a preference for domestic construction material. In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements apply to this acquisition. Therefore, the Balance of Payments Program restrictions are waived for designated country construction materials.
(c) The Contractor shall use only domestic or designated country construction material in performing this contract, except for—
(1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation;
(2) Information technology that is a commercial item; or
(3) The construction material or components listed by the Government as follows:
Bulk aggregate, sand, gravel, cement, ready mix concrete, reinforcing steel, steel wire mesh, rolled steel coil, structural steel, security fencing, ductile iron pipe, plant-mix asphalt paving, stone, concrete masonry units, excavation and fill sand and other soil materials.
All materials required for this project must meet the standards, quality and requirements of the Specifications.
(End of clause)
4. ProjNet: ProjNet system is re-opened for last minute inquiries until Wednesday, January 12, 2022.
5. Proposal Due Date: Your proposal due date remains unchanged and it is due on January 18th, 2022 by 10:00AM Eastern Standard Time.
All other terms and conditions remain unchanged.