A154_Amendment 0005 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf

PDF 466 KB Posted

Attached to
Amendment 0015 to Super Hornet Procurement B, Package 005 (Organizational Level Maintenance Hangar) and Package 001A/B (Base Infrastructure)
Solicitation number
W912ER21R0025
Issued by

About this file

This document is an amendment to a solicitation for the construction of an organizational level maintenance hangar and base infrastructure at Al Jaber Air Base in Kuwait. The amendment revises drawings, pricing proposal instructions, and contract requirements. Offerors must submit proposals by October 8, 2021 with a preliminary project schedule and five-page narrative. The schedule must include milestones from award to notice to proceed within 20 days, preconstruction submittals, procurement of long lead items, testing and commissioning, and completion within the period of performance. The narrative should explain the schedule logic and durations. The amendment also adds a requirement for offerors to comply with the two percent federal excise tax in accordance with FAR provisions and clauses. The U.S. Army Corps of Engineers Middle East District is the issuing agency for this solicitation to construct facilities at Al Jaber Air Base in Kuwait.

View the file

Other files

File Type Posted
A154_Amendment 0015 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
A154_Amendment 0014 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 6 OF 7 (PKG 1B SEC 01 50 00) JAN 22.pdf PDF
A154_Amendment 0013 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2022_0106_Pkg 5_ Rev A 0013_All Drawings.pdf PDF
2021_1229_Pkg 1A_ A 0013_All Drawings.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 2 OF 7 (PKG 1A) - JAN 22.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 4 OF 7 (PKG 5) JAN 22.pdf PDF
AMENDMENT 0013 NARRATIVE - 21R0025 Superhornet Procurement B -JAN 22.pdf PDF
A154_Amendment 0012 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_1220_Pkg 1B A_12_All Drawings.pdf PDF
2021_1214_Pkg 1A_ A11_All Drawings.pdf PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 6 OF 7 - PACKAGE 1B.PDF PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 2 OF 7 - PACKAGE 1A.pdf PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 4 OF 7 - PACKAGE 5.pdf PDF
A154_Amendment 0011 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_1214__Pkg 5_A11_All Drawings.pdf PDF
Amendment 0011 PROPOSAL SCHEDULE AND COST BREAKDOWN Super Hornet Kuwait.xls XLS spreadsheet
A154_Amendment 0010 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
DRAWING DOCUMENT VOL 3 FOR PKG 1B.pdf PDF
REVISED COVER - VOL 4 OF 5 (NOW 7) PKG 5 SPECS ORG LEVEL MAINT HANGAR.pdf PDF
VOL 6 OF 7 - SPEC PKG 1B 480088 Base Infrastr Elec and Telecomm SPECIFICATIONS.pdf PDF
480088 480569_Ku Super Hornet COST PROPOSAL - 11-19-2021 Amendment 0009.pdf PDF
480088 480569_Ku Super Hornet COST BREAKDOWN - 11-19-2021 Amendment 0009.pdf PDF
AMENDMENT 0009 SPEC DOCUMENT FOR VOL 4 OF 7 (PKG 5).pdf PDF
REVISED COVER - VOL 2 OF 5 (NOW 7) SPECS PKG 1A BASE INFRSTR FOR FAC AT CLIN5 4800881A.pdf PDF
REVISED COVER - VOL 5 OF 5 (NOW 7) SPECS FOR PKG 5 SUPP DOCS - SPECS_CLIN 5_VOL2.pdf PDF
A154_Amendment 0009 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0009 SPEC DOCUMENT FOR VOL 2 OF 7 (PKG 1A).pdf PDF
REVISED COVER - VOL 3 OF 5 (NOW 7) PKG 1A BASE INFRA (FOR PKG 5) SUPP DOCS - 480088 AE-SPECS_CLIN 5_VOL2 FROM ORIG FILE.pdf PDF
VOL 7 OF 7 - SPEC PKG 1B 480088 Base Infrastr Elec and Telecomm Supplemental Docs.pdf PDF
A154_Amendment 0008 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0008 - SPEC DOCUMENT SEC 33 16 15 FOR PKG 1A.pdf PDF
2021_1015_Proc B_Pkg 1A_Amendment 0008_All Drawings.pdf PDF
2021_1007_Proc B_Pkg 1A_Rev Amendment 0007_All Drawings - 04NOV21.pdf PDF
AMENDMENT 0008 - SPEC DOCUMENT FOR PKG 5 (3 SECTIONS).pdf PDF
2021_1015_Proc B_Pkg 5_Amendment 0008_All Drawings.pdf PDF
AMENDMENT 0007 SPECIFICATION DOC FOR PKG 5.pdf PDF
2021_1014_Proc B_Pkg 5_Rev Amendment 0007_All Drawings.pdf PDF
A154_Amendment 0007 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0007 SPECIFICATION DOC FOR PKG 1A.pdf PDF
A154_Amendment 0006 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_0827_Proc B_Package 1A_Amendment 0005_All Drawings.pdf PDF
2021_0827_Proc B_Package 5_Amendment 0005_All Drawings.pdf PDF
A154_Amendment 0004 W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
Package 1A_Amendment 0004_All Drawings Super Hornet Procurement B Kuwait.pdf PDF
Proposal Schedule Amendment 0004 Super Hornet Procurement B Kuwait.pdf PDF
Package 5_Amendment 0004_All Drawings Super Hornet Procurement B Kuwait.pdf PDF
APPENDIX A (RFP Attachments) W912ER21R0025 Super Hornet Procurement B Kuwait.docx DOCX document
Cost Breakdown Sheet Amendment 0004 Super Hornet Procurement B Kuwait.pdf PDF
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

480569

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment 0005 is to (1) revise the draw ings, (2) revise section 00 21 00, and (3) revise section 00 73 00 to include compliance w ith 2% federal excise tax

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ER21R0025

X 9B. DATED (SEE ITEM 11)

19-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Sep-2021

CODE

US ARMY CORPS OF ENGINEERS-CETAM-CT

MIDDLE EAST DISTRICT, CETAM-CT

PO BOX 2250

WINCHESTER VA 22604-1450

W912ER 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ER21R0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

SUBJECT: Amendment 0005 to W912ER21R0025 Super Hornet Procurement B, Kuwait has been issued to revise the following:

1. Specifications: Specifications are not affected by this amendment.

2. Drawings: The following drawings have been revised per this amendment. Revisions are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.

For Package 1A, Base Infrastructure (for Package 5):

G-011 G-012

XE601

For Package 5, Organizational Level Maintenance Hangar:

G-010 G-011 G-015 G-016

Facility D

I-172 F-403 F-404 F-502

Facility J

A-301 A-503 I-176 F-004 F-410 F-411 F-412 F-502 M-642

3. Solicitation:

a. Section 00 21 00 B 1 d, VOLUME II - PRICE PROPOSAL: The reference to section 00 11 00 in paragraph ii and iii has been revised to read “00 10 00”.

b. Section 00 21 00 F Factor 3: Preliminary Schedule: Replaced in its entirety

Proposal Submission Requirements:

Offerors shall provide a single preliminary overall master schedule. This schedule should provide sufficient detail to convey to the Government a complete understanding of the work associated with the contract documents and the Period of Performance (PoP) as described in the Scope of Work. The offeror shall include with its proposed preliminary schedule an accompanying schedule narrative that demonstrates the offeror’s understanding of the solicitation requirements.

a. Schedule Diagram: An offeror’s schedule shall be formatted as a time scaled network diagram Critical Path Method (CPM) Schedule, in accordance with specification 01 32 18.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BID-BUILD, with the exception that for the purposes of the Proposal, the Preliminary Schedule does not need to be cost-loaded/resource loaded. The format for preliminary schedule submissions shall be in PDF format. The length of the schedule must be in compliance with the stated period of performance for both construction and any options. The schedule shall be provided as two reports, the first indicating all activities and the second indicating only the critical path of the project. The schedule should include the following major design and construction activity milestones, including specific activities between contract award and Notice to Proceed (NTP):

i. Estimated contract award date of 31 December 2021

ii. A 20 calendar day activity named “KTR Prepare/Submit NTP Docs” that follows the Award milestone

iii. A 5 business day activity named “Gov’t Review/Approve NTP Docs” that follows the

“Prepare/Submit” activity above

iv. An NTP milestone that follows the “Gov’t Review/Approve” activity above

v. Obtaining base access to Al Jaber Air Base

vi. Preconstruction submittals (i.e., Accident Prevention Plan, Quality Control Plan, Area Use Plan, etc.)

vii. Procurement of long lead items

viii. Testing & commissioning of hangar and infrastructure systems

ix. Completion date of Procurement Package B within the specified period of performance.

x. Completion of all options within their respective periods of performance. The schedule should assume that options are exercised on the latest date allowed and shall consist of the required construction completion duration as well as the periods of performance for any options.

xi. Project completion through demobilization.

An offeror should demonstrate a further understanding of the project requirements by including additional activities and milestones not listed above.

b. Schedule Narrative: The narrative shall demonstrate the offeror’s understanding of the solicitation requirements, and shall support the schedule diagram. The narrative shall be limited to five (5) pages. The narrative should include, but not be limited to, an explanation of:

i. How the offeror determined the duration of activities between Award and NTP

ii. How the offeror determined the duration of the “Obtain Base Access” activity or activities

iii. How the offeror determined the duration of the “Preconstruction submittals” activity or activities

iv. How the offeror determined the duration of any procurement activities, including long lead items

v. How the offeror determined the duration of the testing and commissioning of hangar and infrastructure activities.

vi. The offeror’s plan to meet the period of performance (PoP), and whether it will require multiple crews, multiple shifts, overtime, or other special efforts to achieve the PoP

vii. Key construction milestones and features of work

Note: There are no changes to Evaluation Procedures, Adjectival Ratings and Descriptions

c. Section 00 73 00 Special Contract Requirements: The following sentence has been deleted from paragraph G. COMPLAINCE WITH HOST COUNTRY RULES AND CUSTOMS: “(20) The following is from the signed Letter of Offer and Acceptance (LOA), KU-P-SBG between the United States of America and the Kuwait:”.

d. Section 00 73 00 Special Contract Requirements: The following Compliance with 2% federal excise tax section has been added.

K. COMPLIANCE WITH TWO (2) PERCENT FEDERAL EXCISE TAX

Federal Acquisition Regulation (FAR) provision 52.229-11 and FAR clause 52.229-12 are included in Section 00 45 00 and 00 72 00 of the solicitation and resultant contract. This provision and clause concern the imposition of a two

(2) percent Federal excise tax withholding on any resultant contract award or payment request. Contractor should read the provision and clause fully to understand how this may apply to them.

Note: U.S. Army Corps of Engineers (USACE) Transatlantic Middle East District (TAM) does not have the means of withholding the excise tax at this time. As a result, contractors are expected to comply with the instructions and to properly complete and return the W-14 at proposal submission, and with each pay application. The amount due for each withholding will be confirmed by USACE, BUT WILL NOT BE WITHHELD. It is the contractor’s responsibility to calculate this tax liability and remit payment, or set aside for future payment to the Internal Revenue Service (IRS). Whether the contractor makes immediate payment, or sets aside monies for future payment to the IRS, is the contractor’s discretion, based on its analysis of the regulations regarding the excise tax. In the future event that USACE is able to withhold the excise tax during contract performance, it will notify the contractor and make such a withholding; no advance notice is required prior to the withholding. Under no circumstances is USACE liable for any excise tax liability not paid by the contractor. The contractor is liable for the tax, to the extent required by law, regardless of whether USACE makes a withholding.

4. Section 00 21 00 Section II - Solicitation Provisions, C PROPOSAL SUBMISSION INSTRUCTIONS:

The proposal due date is not affected by this amendment and it is still due not later than October 8th, 2021 by 4:00PM Eastern Daylight Time.

All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .