AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 4 OF 7 (PKG 5) JAN 22.pdf
PDF 914 KB Posted
- Solicitation number
- W912ER21R0025
About this file
This amendment to a solicitation provides additional details for a construction project at Al Jaber Air Base in Kuwait. The project includes building a new Organizational Level Maintenance Hangar with eight aircraft bays and associated shop spaces, as well as an adjacent Organizational Level Corrosion Control Hangar with two additional aircraft bays for corrosion control and a wash bay. Associated corrosion control shop spaces, vehicle parking sunshades, and related site improvements are also part of the project scope. All inquiries must be submitted through ProjNet to receive a response. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Middle East.
View the file
Other files
Show 40 more
Latest 50 of 84 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Super Hornet, Pkg 5, Organizational Level Maint Hangar, Kuwait 480569
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS -- REVISED BY AMENDMENT NO.
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 AREA USE PLAN
1.3.1 Security Provisions
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
2.1.2 Project Identification Signs
2.1.3 Warning Signs
2.2 TEMPORARY TRAFFIC CONTROL
2.2.1 Haul Roads
2.2.2 Barricades
2.3 FENCING
2.3.1 Polyethylene Mesh Safety Fencing
2.3.2 Chain Link Panel Fencing
2.3.3 Post-Driven Chain Link Fencing
2.4 TEMPORARY WIRING
2.5 BACKFLOW PREVENTERS
PART 3 EXECUTION
3.1 EMPLOYEE PARKING
3.2 TEMPORARY BULLETIN BOARD
3.3 AVAILABILITY AND USE OF UTILITY SERVICES
3.3.1 Temporary Utilities
3.3.2 Sanitation
3.3.3 Telephone
3.3.4 Obstruction Lighting of Cranes
3.3.5 Fire Protection
3.4 TRAFFIC PROVISIONS
3.4.1 Maintenance of Traffic
3.4.2 Protection of Traffic
3.4.3 Rush Hour Restrictions
3.4.4 Dust Control
3.5 CONTRACTOR'S TEMPORARY FACILITIES
3.5.1 Safety Systems
3.5.2 Administrative Field Offices
3.5.3 Storage Area
3.5.4 Supplemental Storage Area
3.5.5 Appearance of Trailers
3.5.6 Maintenance of Storage Area
SECTION 01 50 00 Page 1
W912ER21R0025 AMENDMENT 0013
3.5.7 Security Provisions
3.5.8 Weather Protection of Temporary Facilities and Stored Materials
3.5.8.1 Building and Site Storm Protection
3.6 GOVERNMENT FIELD OFFICE
3.6.1 Resident Engineer's Office
3.6.2 Trailer-Type Mobile Office
3.7 PLANT COMMUNICATIONS
3.8 TEMPORARY PROJECT SAFETY FENCING
3.9 CLEANUP
3.10 RESTORATION OF STORAGE AREA
-- End of Section Table of Contents --
SECTION 01 50 00 Page 2
SECTION 01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS -- REVISED BY AMENDMENT NO.
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
NFPA 241 (2013; Errata 2015) Standard for Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 70/7460-1 (2015; Rev L) Obstruction Marking and Lighting
U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)
MUTCD (2015) Manual on Uniform Traffic Control Devices
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Construction Site Plan Area Use Plan ; G M/R
Security Provisions; G M/R
SECTION 01 50 00 Page 3
Traffic Control Plan; G M/R
Haul Road Plan; G M/R
SD-06 Test Reports
Backflow Preventer Tests
SD-07 Certificates
Backflow Tester Certification
Backflow Preventers Certificate of Full Approval
1.3 CONSTRUCTION SITE PLANAREA USE PLAN
Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas. The Contractor shall submit to the Contracting Officer, within 15 calendar days after issuance of Notice to Proceed (NTP), an Area Use Plan designating intended use of all areas within the project boundaries. This plan shall include, but not necessarily be limited to the following: the proposed location and dimensions of any area to be fenced and used by the Contractor;
construction plant and building installations/the number of trailers and facilities to be used; avenues of ingress/egress to the fenced areas and details of the fence installation; drawings showing temporary electrical installations; temporary water and sewage disposal installations; material storage areas; hazardous storage areas. Any areas which may have to be graveled shall also be identified. The plan shall also include a narrative description of the building structural system, the site utility system;
and the office or administration facilities. The Contractor shall also indicate if the use of a supplemental or other staging area is desired.
The Contractor shall not begin construction of the mobilization or any Area Use prior to approval by the Contracting Officer.
1.3.1 Security Provisions
a. Prior to mobilization, submit a plan for providing project security to prevent unauthorized access to equipment, facilities, materials and documents, and to safeguard them against sabotage, damage and theft. The Contractor shall be responsible for physical security of all personnel, materials, supplies, and equipment of every description, including property which may be Government-furnished or owned, for all areas occupied jointly by the Contractor and the Government, as well as for all work areas.
b. The Contractor shall comply with security regulations imposed by the installation commander and/or the agency occupying the space where work is to be performed. The Contractor shall secure buildings where construction is being performed at the end of each work day.
SECTION 01 50 00 Page 4
1.4 BACKFLOW PREVENTERS CERTIFICATE
Certificate of Full Approval from FCCCHR List , University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval. Certificate of Provisional Approval will not be acceptable.
1.4.1 Backflow Tester Certificate
Prior to testing, submit to the Contracting Officer certification issued by the State or local regulatory agency attesting that the backflow tester has successfully completed a certification course sponsored by the regulatory agency. Tester must not be affiliated with any company participating in any other phase of this Contract.
1.4.2 Backflow Prevention Training Certificate
Submit a certificate recognized by the State or local authority that states the Contractor has completed at least 10 hours of training in backflow preventer installations. The certificate must be current.
1.5 DOD CONDITION OF READINESS (COR)
DOD will set the Condition of Readiness (COR) based on the weather forecast for sustained winds 50 knots (60mph or 95 km/hr) or greater.
Contact the Contracting Officer for the current COR setting.
Monitor weather conditions a minimum of twice a day and take appropriate actions according to the aproved Emergency Plan in the accepted Accident Prevention Plan, EM 385-1-1 Section 01 Emergency Planning and the instructions below.
Unless otherwise directed by the Contracting Officer, comply with:
a. Condition FOUR (Sustained winds of 93 km/hr or greater expected within 72 hours): Normal daily jobsite cleanup and good housekeeping practices. Collect and store in piles or containers scrap lumber, waste material, and rubbish for removal and disposal at the close of each work day. Maintain the construction site including storage areas, free of accumulation of debris. Stack form lumber in neat piles less than one m high. Remove all debris, trash, or objects that could become missile hazards.
b. Condition THREE (Sustained winds of 93 km/hr or greater expected within 48 hours): Maintain "Condition FOUR" requirements and commence securing operations necessary for "Condition ONE" which cannot be completed within 18 hours. Cease all routine activities which might interfere with securing operations. Commence securing and stow all gear and portable equipment. Make preparations for securing buildings. Review requirements pertaining to "Condition TWO" and continue action as necessary to attain "Condition THREE" readiness.
c. Condition TWO (Sustained winds of 93 km/hr or greater expected within 24 hours): Curtail or cease routine activities until securing operation is complete. Reinforce or remove form work and scaffolding. Secure machinery, tools, equipment, materials, or remove from the jobsite. Expend every effort to clear all missile hazards and loose equipment from general base areas.
SECTION 01 50 00 Page 5
d. Condition ONE. (Sustained winds of 93 km/hr or greater expected within 12 hours): Secure the jobsite, and leave Government premises.
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
Within 7 calendar days of mobilization on site and prior to the commencement of work activities, provide a clear weatherproof covered bulletin board not less than 915 by 1220 mm in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, Safety and Health Information as required by EM 385-1-1 Section 01 and other information approved by the Contracting Officer. Coordinate requirements herein with
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.
2.1.2 Project Identification Signs
The requirements for the signs, their content, and location are as specified in Section 01 58 00 PROJECT IDENTIFICATION. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.
2.1.3 Warning Signs
Post temporary signs, tags, and labels to give workers and the public adequate warning and caution of construction hazards according to the EM 385-1-1 Section 04. Attach signs to the perimeter fencing every 150 feet warning the public of the presence of contruction hazards. Signs must require unauthorized persons to keep out of the construction site.
Correct the data required by safety signs daily.
2.2 TEMPORARY TRAFFIC CONTROL
2.2.1 Haul Roads
Construct access and haul roads necessary for proper prosecution of the work under this contract in accordance with EM 385-1-1 Section 04.
Construct with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic are be avoided. Submit haul road plan for approval. Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control, although optional, must be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads are subject to approval by the Contracting Officer. Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations.
2.2.2 Barricades
Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades
SECTION 01 50 00 Page 6 clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.
2.3 FENCING
Provide fencing along the construction site and at all open excavations and tunnels to control access by unauthorized personnel. Safety fencing must be highly visible to be seen by pedestrians and vehicular traffic.
Specific fencing requirements are as described herein. All fencing will meet the requirements of EM 385-1-1 .
2.3.1 Polyethylene Mesh Safety Fencing
Temporary safety fencing must be a high visibility orange colored, high density polyethylene grid, a minimum of 48 inches high and maximum mesh size of 2 inches. Fencing must extend from the grade to a minimum of 48 inches above the grade and be tightly secured to T-posts spaced as necessary to maintain a rigid and taut fence. Fencing must remain rigid and taut with a minimum of 200 pounds of force exerted on it from any direction with less than 4 inches of deflection.
2.3.2 Chain Link Panel Fencing
Temporary panel fencing must be galvanized steel chain link panels 6 feet high. Multiple fencing panels may be linked together at the bases toform long spens as needed. Each panel base must be weighted down using sand bags or other suitable materials in order for the fencing to withstand anticipated winds while remaining upright. Fencing must remain rigid and taut with a minimum of 200 pounds of force exerted on it from any direction with less than 4 inches of deflection.
2.3.3 Post-Driven Chain Link Fencing
Temporary post-driven fencing must be galvanized chain link fencing 6 feet high supported by an tightly secured to galvanized steel posts driven below grade. Fence posts must be located on minimum 10 foot centers.
Posts may be set in various sufaces such as sand, soil, ashpalt or concrete as necessary. Chain link fencing must remain rigid and taut with a minimum of 200 pounds of force exerted on it from any direction with less than 4 inches of deflection. Fencing and posts must be completely removed at the completion of construction and any surfaces disturbed or damaged must be restored to its original condition. Underground utilities must be located and identified prior to setting fence posts. Fence must be equipped with a lockable gate. Gate must remain locked when construction personnel are not present.
2.4 TEMPORARY WIRING
Provide temporary wiring in accordance with EM 385-1-1 Section 11, NFPA 241 and NFPA 70 . Include monthly inspection and testing of all equipment and apparatus.
2.5 BACKFLOW PREVENTERS
In the case of any contractor-initiated connection to the existing domestic water system, the contractor must furnish and install backflow prevention devices as required by local code and the Al Jaber Air Base Military Engineering Projects (MEP) Manager.
SECTION 01 50 00 Page 7
PART 3 EXECUTION
3.1 EMPLOYEE PARKING
Construction contract employees will park privately owned vehicles in an area designated by the Contracting Officer. This area will be within reasonable walking distance of the construction site. Employee parking must not interfere with existing and established parking requirements of the government installation.
3.2 TEMPORARY BULLETIN BOARD
Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.
3.3 AVAILABILITY AND USE OF UTILITY SERVICES
3.3.1 Temporary Utilities
The Government will provide no temporary utilities. The Contractor shall provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.
3.3.2 Sanitation
Provide and maintain within the construction area minimum field-type sanitary facilities approved by the Contracting Officer and periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility. Obtain approval from the system owner prior to discharge into any municipal, district, or commercial sanitary sewer system. Any penalties or fines associated with improper discharge will be the responsibility of the Contractor.
Coordinate with the Contracting Officer and follow station regulations and procedures when discharging into the station sanitary sewer system.
Maintain these conveniences at all times. Include provisions for pest control and elimination of odors. Government toilet facilities will not be available to Contractor's personnel.
3.3.3 Telephone
Make arrangements and pay all costs for telephone facilities desired.
3.3.4 Obstruction Lighting of Cranes
The provisions of this clause "Obstruction Lighting of Cranes" are a minimum. The Contractor shall coordinate with and comply with all requirements imposed local authorities and/or Flight Operations management responsible for operations at Ahmed Al Jaber Air Base.
Provide a minimum of 2 aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 30 meter above ground level. Light construction and installation must comply with FAA AC 70/7460-1 . Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer.
3.3.5 Fire Protection
Provide temporary fire protection equipment for the protection of
SECTION 01 50 00 Page 8 personnel and property during construction. Remove debris and flammable materials weekly to minimize potential hazards.
3.4 TRAFFIC PROVISIONS
3.4.1 Maintenance of Traffic
a. Conduct operations in a manner that will not close any thoroughfare or interfere in any way with traffic on railways or highways except with written permission of the Contracting Officer at least 15 calendar days prior to the proposed modification date, and provide a Traffic Control Plan detailing the proposed controls to traffic movement for approval. The plan must be in accordance with State and local regulations and the MUTCD, Part VI. Contractor may move oversized and slow-moving vehicles to the worksite provided requirements of the highway authority have been met.
b. Conduct work so as to minimize obstruction of traffic, and maintain traffic on at least half of the roadway width at all times. Obtain approval from the Contracting Officer prior to starting any activity that will obstruct traffic.
c. Provide, erect, and maintain, at contractors expense, lights, barriers, signals, passageways, detours, and other items, that may be required by the Life Safety Signage, overhead protection authority having jurisdiction.
3.4.2 Protection of Traffic
Maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment the work, and the erection and maintenance of adequate warning, danger, and direction signs, will be as required by the State and local authorities having jurisdiction. Protect the traveling public from damage to person and property. Minimize the interference with public traffic on roads selected for hauling material to and from the site. Investigate the adequacy of existing roads and their allowable load limit. Contractor is responsible for the repair of any damage to roads caused by construction operations.
3.4.3 Rush Hour Restrictions
Do not interfere with the peak traffic flows preceding and during normal operations for Ahmed Al Jaber Air Base without notification to and approval by the Contracting Officer.
3.4.4 Dust Control
Dust control methods and procedures must be approved by the Contracting Officer. Coordinate dust control methods with 01 57 19 TEMPORARY
ENVIRONMENTAL CONTROLS.
3.5 CONTRACTOR'S TEMPORARY FACILITIES
Contractor-owned or -leased trailers must be identified by Government assigned numbers. Size and location of the number will comply with base requirements. Apply the number to the trailer within 14 calendar days of
SECTION 01 50 00 Page 9 notification, or sooner, if directed by the Government. Temporary facilities will meet requirements as identified in EM 385-1-1 Section 04.
3.5.1 Safety Systems
Protect the integrity of any installed safety systems or personnel safety devices. Obtain prior approval from Contracting Officer if entrance into systems serving safety devices is required. If it is temporarily necessary to remove or disable personnel safety devices in order to accomplish contract requirements, provide alternative means of protection prior to removing or disabling any permanently installed safety devices or equipment and obtain approval from the Contracting Officer.
3.5.2 Administrative Field Offices
Provide and maintain administrative field office facilities within the construction area at the designated site. Government office and warehouse facilities will be available to the Contractor's personnel.
3.5.3 Storage Area
Construct a temporary 1.8 m high chain link fence around trailers and materials. Include plastic strip inserts so that visibility through the fence is obstructed. Fence posts may be driven, in lieu of concrete bases, where soil conditions permit. Do not place or store trailers, materials, or equipment outside the fenced area unless such trailers, materials, or equipment are assigned a separate and distinct storage area by the Contracting Officer away from the vicinity of the construction site but within the installation boundaries. Trailers, equipment, or materials must not be open to public view with the exception of those items which are in support of ongoing work on any given day. Do not stockpile materials outside the fence in preparation for the next day's work. Park mobile equipment, such as tractors, wheeled lifting equipment, cranes, trucks, and like equipment within the fenced area at the end of each work day.
3.5.4 Supplemental Storage Area
Upon request, and pending availability, the Contracting Officer will designate another or supplemental area for the use and storage of trailers, equipment, and materials. This area may not be in close proximity of the construction site but will be within the installation boundaries. The area will be maintained in an clean and orderly fashion and secured if needed to protect supplies and equipment. Utilities will not be provided to this area by the Government.
3.5.5 Appearance of Trailers
a. Trailers which are rusted, have peeling paint or are otherwise in need of repair will not be allowed on Installation property. Trailers must present a clean and neat exterior appearance and be in a state of good repair.
b. and maintain the temporary facilities. Failure to do so will be sufficient reason to require their removal.
3.5.6 Maintenance of Storage Area
a. Keep fencing in a state of good repair and proper alignment. Grassed
SECTION 01 50 00 Page 10 or unpaved areas, which are not established roadways, and will be traversed with construction equipment or other vehicles, will be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways, should the Contractor elect to traverse them with construction equipment or other vehicles. Mow and maintain grass located within the boundaries of the construction site for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers will be edged or trimmed neatly.
3.5.7 Security Provisions
Provide adequate outside security lighting at the temporary facilities.
The Contractor will be responsible for the security of its own equipment.
3.5.8 Weather Protection of Temporary Facilities and Stored Materials
Take necessary precautions to ensure that roof openings and other critical openings in the building are monitored carefully. Take immediate actions required to seal off such openings when rain or other detrimental weather is imminent, and at the end of each workday. Ensure that the openings are completely sealed off to protect materials and equipment in the building from damage.
3.5.8.1 Building and Site Storm Protection
When a warning of gale force winds is issued, take precautions to minimize danger to persons, and protect the work and nearby Government property.
Precautions must include, but are not limited to, closing openings;
removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work. Close openings in the work when storms of lesser intensity pose a threat to the work or any nearby Government property.
3.6 GOVERNMENT FIELD OFFICE
3.6.1 Resident Engineer's Office
Provide the Government Resident Engineer with an office, approximately 19 square meters in floor area, located where directed and providing space heat, air conditioning unit, electric light and power, and toilet facilities consisting of one lavatory and one water closet complete with connections to water and sewer mains. Provide a mail slot in the door or a lockable mail box mounted on the surface of the door. Include a 1200 by 2400 mm plan table, computer work space a standard size office desk and chair, and telephone. At completion of the project, the office will remain the property of the Contractor and be removed from the site. Utilities will be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer. Compliance with safety and appearance requirements for temporary facilities stated in previous paragraphs is required.
3.6.2 Trailer-Type Mobile Office
The option is available to, furnish and maintain a trailer-type mobile office acceptable to the Contracting Officer to meet the requirements of the minimum facilities specified above. Securely anchor the trailer to the ground at all four corners to guard against movement during high winds. Coordinate requirements for proper anchoring with EM 385-1-1
SECTION 01 50 00 Page 11
Section 04.
3.7 PLANT COMMUNICATIONS
Whenever the individual elements of the plant are located so that operation by normal voice between these elements is not satisfactory, install a satisfactory means of communication, such as telephone or other suitable devices and make available for use by Government personnel.
3.8 TEMPORARY PROJECT SAFETY FENCING
As soon as practicable, but not later than 15 days after the date established for commencement of work, furnish and erect temporary project safety fencing at the work site. Maintain the safety fencing during the life of the contract and, upon completion and acceptance of the work, removefrom the work site.
3.9 CLEANUP
Remove construction debris, waste materials, packaging material and the like from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways must be cleaned away. Store any salvageable materials resulting from demolition activities within the fenced area described above or at the supplemental storage area. Neatly stack stored materials not in trailers, whether new or salvaged.
3.10 RESTORATION OF STORAGE AREA
Upon completion of the project remove the bulletin board, signs, barricades, haul roads, and any other temporary products from the site.
After removal of trailers, materials, and equipment from within the fenced area, remove the fence. Restore areas used during the performance of the contract to the original or better condition. Remove gravel used to traverse grassed areas and restore the area to its original condition, including top soil and seeding as necessary.
-- End of Section --
SECTION 01 50 00 Page 12
DIVISION 05 - METALS
SECTION 05 12 00
STRUCTURAL STEEL -- REVISED BY AMENDMENT NO. 0013
PART 1 GENERAL
1.1 REFERENCES
1.2 REQUIREMENT PRECEDENCE
1.3 SUBMITTALS
1.4 AISC QUALITY CERTIFICATION
1.5 SEISMIC PROVISIONS
1.6 QUALITY ASSURANCE
1.6.1 Preconstruction Submittals
1.6.1.1 Erection and Erection Bracing Drawings
1.6.2 Fabrication Drawing Requirements
1.6.3 Delegated Connection Design
1.6.4 Certifications
1.6.4.1 Welding Procedures and Qualifications
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 STEEL
2.2.1 Structural Steel
2.2.2 Structural Steel Tubing
2.2.3 Steel Pipe
2.3 BOLTS, NUTS, AND WASHERS
2.3.1 Common Grade Bolts
2.3.1.1 Bolts
2.3.1.2 Nuts
2.3.1.3 Washers
2.3.2 High-Strength Bolts
2.3.2.1 Bolts
2.3.2.2 Nuts
2.3.2.3 Direct Tension Indicator Washers
2.3.2.4 Washers
2.3.3 Tension Control Bolts
2.3.4 Foundation Anchorage
2.3.4.1 Anchor Rods
2.3.4.2 Anchor Nuts
2.3.4.3 Anchor Washers
2.3.4.4 Anchor Plate Washers
2.4 STRUCTURAL STEEL ACCESSORIES
2.4.1 Welding Electrodes and Rods
2.4.2 Non-Shrink Grout
2.4.3 Welded Shear Stud Connectors
2.5 GALVANIZING
2.6 FABRICATION
2.6.1 Markings
2.6.2 Shop Primer
SECTION 05 12 00 Page 1
2.6.2.1 Cleaning
2.7 DRAINAGE HOLES
PART 3 EXECUTION
3.1 ERECTION
3.1.1 STORAGE
3.2 CONNECTIONS
3.2.1 Common Grade Bolts
3.2.2 High-Strength Bolts
3.2.2.1 Installation of Direct Tension Indicator Washers (DTIW)
3.2.3 Tension Control Bolts
3.3 GAS CUTTING
3.4 WELDING
3.5 SHOP PRIMER REPAIR
3.5.1 Field Priming
3.6 GALVANIZING REPAIR
3.7 FIELD QUALITY CONTROL
3.7.1 Welds
3.7.1.1 Visual Inspection
3.7.1.2 Nondestructive Testing
3.7.2 Direct Tension Indicator Washers
3.7.2.1 Direct Tension Indicator Washer Compression
-- End of Section Table of Contents --
SECTION 05 12 00 Page 2
SECTION 05 12 00
STRUCTURAL STEEL
-- REVISED BY AMENDMENT NO. 0013
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 207 (2016; R 2017) Certification Standard for Steel Fabrication and Erection, and Manufacturing of Metal Components
AISC 303 (2016) Code of Standard Practice for Steel Buildings and Bridges
AISC 325 (2017) Steel Construction Manual
AISC 326 (2009) Detailing for Steel Construction
AISC 341 (2016) Seismic Provisions for Structural Steel Buildings
AISC 360 (2016) Specification for Structural Steel Buildings
AISC DESIGN GUIDE 10 (1997) Erection Bracing of Low-Rise Structural Steel Buildings
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ANSI/ASNT CP-189 (2016) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors
ASME INTERNATIONAL (ASME)
ASME B46.1 (2009) Surface Texture, Surface Roughness, Waviness and Lay
SECTION 05 12 00 Page 3
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A29/A29M (2016) Standard Specification for General Requirements for Steel Bars, Carbon and Alloy, Hot-Wrought
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM A500/A500M (2018) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A563M (2007; R 2013) Standard Specification for Carbon and Alloy Steel Nuts (Metric)
ASTM A6/A6M (2017a) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling
ASTM A780/A780M (2009; R 2015) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A992/A992M (2011; R 2015) Standard Specification for Structural Steel Shapes
ASTM B695 (2004; R 2016) Standard Specification for Coatings of Zinc Mechanically Deposited on Iron and Steel
ASTM C1107/C1107M (2017) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C827/C827M (2016) Standard Test Method for Change in Height at Early Ages of Cylindrical Specimens of Cementitious Mixtures
ASTM F1136/F1136M (2011) Standard Specification for Zinc/Aluminum Corrosion Protective Coatings for Fasteners
ASTM F1554 (2018) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength
SECTION 05 12 00 Page 4
ASTM F2329/F2329M (2015) Standard Specification for Zinc Coating, Hot-Dip, Requirements for Application to Carbon and Alloy Steel Bolts, Screws, Washers, Nuts, and Special Threaded Fasteners
ASTM F2833 (2011; R 2017) Standard Specification for Corrosion Protective Fastener Coatings with Zinc Rich Base Coat and Aluminum Organic/Inorganic Type
ASTM F3125/F3125M (2015a) Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength, Inch and Metric Dimensions
ASTM F436/F436M (2016) Standard Specification for Hardened Steel Washers Inch and Metric Dimensions
ASTM F844 (2007a; R 2013) Washers, Steel, Plain (Flat), Unhardened for General Use
ASTM F959/F959M (2017a) Standard Specification for Compressible-Washer-Type Direct Tension Indicators for Use with Structural Fasteners, Inch and Metric Series
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SSPC Paint 20 (2002; E 2004) Zinc-Rich Primers (Type I, Inorganic, and Type II, Organic)
SSPC Paint 29 (2002; E 2004) Zinc Dust Sacrificial Primer, Performance-Based
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
STATE OF KUWAIT, MINISTRY OF DEFENSE, MILITARY ENGINEERING
PROJECTS (DOCUMENT)
DOCUMENT III-1 (2007) Military Engineering Projects, General Specifications
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-301-01 (2013; with Change 3) Structural Engineering
UFC 3-310-04 (2013; with Change 1) Seismic Design of Buildings
SECTION 05 12 00 Page 5
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR Part 1926, Subpart R Steel Erection
1.2 REQUIREMENT PRECEDENCE
These specifications have been prepared using information from the following Host Nation criteria: DOCUMENT III-1 .
In the case of conflicts between these Volume 1 Specifications and the Volume 2 Host Nation requirements DOCUMENT III-1 , the Volume 1 Specifications shall take precedence over Volume 2 Host Nation requirements DOCUMENT III-1 .
See attachments for DOCUMENT III-1 , Military Engineering Projects, General Specifications, April 2007 for reference and supplemental information.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Erection and Erection Bracing Drawings; G M/R
SD-02 Shop Drawings
Fabrication Drawings Including Details of Connections; G M
SD-03 Product Data
Shop Primer Welding Electrodes and Rods Direct Tension Indicator Washers Non-Shrink Grout Tension Control Bolts
SD-05 Design Data
Design Calculations for Steel Connections; G M Shoring and Temporary Bracing; G M
SD-06 Test Reports
Class B Coating Bolts, Nuts, and Washers Weld Inspection Reports Direct Tension Indicator Washer Inspection Reports
SD-07 Certificates
Steel Bolts, Nuts, and Washers Galvanizing AISC Structural Steel Fabricator Quality Certification
SECTION 05 12 00 Page 6
AISC Structural Steel Erector Quality Certification Welding Procedures and Qualifications Welding Electrodes and Rods Certified Welding Inspector NDT Technician Welding Procedure Specifications (WPS)
1.4 AISC QUALITY CERTIFICATION
Work must be fabricated by an AISC Certified Structural Steel Fabricator, in accordance with AISC 207 , Category BU. Submit AISC Structural Steel Fabricator quality certification.
Work must be erected by an AISC Structural Steel Certified Erector, in accordance with AISC 207 , Category CSE. Submit AISC Structural Steel erector quality certification.
1.5 SEISMIC PROVISIONS
Provide the structural steel system in accordance with AISC 341 , Chapter J as amended by UFC 3-310-04 .
1.6 QUALITY ASSURANCE
1.6.1 Preconstruction Submittals
1.6.1.1 Erection and Erection Bracing Drawings
Submit for record purposes. Indicate the sequence of erection, temporary shoring and bracing. The erection drawings must conform to AISC 303 .
Erection drawings must be reviewed, stamped and sealed by a registered professional engineer.
1.6.2 Fabrication Drawing Requirements
Submit fabrication drawings for approval prior to fabrication. Prepare in accordance with AISC 303 , AISC 326 and AISC 325 . Fabrication drawings must not be reproductions of contract drawings. Sign and seal fabrication drawings by a registered professional engineer. Include complete information for the fabrication and erection of the structure's components, including the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts. Use AWS A2.4 standard welding symbols. Demonstrate that fabrications will resist loads from fall protection anchors to be attached to primary or secondary framing members through insulated metal panels. Refer to Section 07 41 63 FABRICATED ROOF PANEL ASSEMBLIES for delegated design requirements for fall protection anchors in a travel restraint application. Shoring and temporary bracing must be designed and sealed by a registered professional engineer and submitted for record purposes, with calculations, as part of the drawings. Clearly highlight any deviations from the details shown on the contract drawings highlighted on the fabrication drawings. Explain the reasons for any deviations from the contract drawings.
1.6.3 Delegated Connection Design
Design structural steel connection indicated in the contract documents per AISC 303 , Option 3, using the connection loads indicated. Submit design calculations for steel connections signed and sealed by a registered
SECTION 05 12 00 Page 7 professional engineer.
1.6.4 Certifications
1.6.4.1 Welding Procedures and Qualifications
Prior to welding, submit certification for each welder stating the type of welding and positions qualified for, the code and procedure qualified under, date qualified, and the firm and individual certifying the qualification tests.
Conform to all requirements specified in AWS D1.1/D1.1M .
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide the structural steel system, including shop primer , complete and ready for use. Provide structural steel systems including design, materials, installation, workmanship, fabrication, assembly, erection, inspection, quality control, and testing in accordance with AISC 303 , AISC 360 , AISC 341 , UFC 3-301-01 and UFC 3-310-04 except as modified in this contract.
2.2 STEEL
2.2.1 Structural Steel
Wide flange and WT shapes, ASTM A992/A992M . Angles, Channels and Plates, ASTM A36/A36M.
2.2.2 Structural Steel Tubing
ASTM A500/A500M , Grade B_____.
2.2.3 Steel Pipe
ASTM A53/A53M, Type E or S, Grade B, weight class STD (Standard) or as indicated.
2.3 BOLTS, NUTS, AND WASHERS
Submit the certified manufacturer's mill reports which clearly show the applicable ASTM mechanical and chemical requirements together with the actual test results for the supplied fasteners.
2.3.1 Common Grade Bolts
2.3.1.1 Bolts
ASTM A307, Grade A. The bolt heads and the nuts of the supplied fasteners must be marked with the manufacturer's identification mark, the strength grade and type specified by ASTM specifications.
2.3.1.2 Nuts
ASTM A563M, Grade A, heavy hex style.
SECTION 05 12 00 Page 8
2.3.1.3 Washers
ASTM F844.
2.3.2 High-Strength Bolts
High strength bolts and nuts must be shipped together in the same shipping container. Fasteners indicated to be galvanized shall be tested by the supplier to show that the galvanized nut with the supplied lubricant provided may be rotated from the snug tight condition well in excess of the rotation required for pretensioned installation without stripping.
The supplier shall supply nuts that have been lubricated and tested with the supplied bolts.
2.3.2.1 Bolts
ASTM F3125/F3125M , Grade A325M A325 , Type 1 Heavy Hex Head Style, plain finish.
2.3.2.2 Nuts
ASTM A563M, Grade and Style as specified in the applicable ASTM bolt standard.
2.3.2.3 Direct Tension Indicator Washers
ASTM F959/F959M .
2.3.2.4 Washers
ASTM F436/F436M , plain carbon steel.
2.3.3 Tension Control Bolts
ASTM F3125/F3125M , Grade F1852, Type 1, twist-off style assemblies consisting of steel structural bolts with splined ends, heavy-hex carbon steel nuts, and hardened carbon steel washers. Assembly finish must be plain. Submit product data for tension control bolts.
2.3.4 Foundation Anchorage
2.3.4.1 Anchor Rods
ASTM F1554 Gr 36 , Class 1A.
2.3.4.2 Anchor Nuts
ASTM A563M, Grade A, hex style.
2.3.4.3 Anchor Washers
ASTM F844.
2.3.4.4 Anchor Plate Washers
ASTM A36/A36M
SECTION 05 12 00 Page 9
2.4 STRUCTURAL STEEL ACCESSORIES
2.4.1 Welding Electrodes and Rods
AWS D1.1/D1.1M . Submit product data for welding electrodes and rods.
2.4.2 Non-Shrink Grout
ASTM C1107/C1107M , with no ASTM C827/C827M shrinkage. Grout must be nonmetallic. Submit product data for non-shrink grout.
2.4.3 Welded Shear Stud Connectors
ASTM A29/A29M, Grades 1010 through 1020. AWS D1.1/D1.1M , Table 7.1, Type B.
2.5 GALVANIZING
ASTM F2329/F2329M , ASTM F1136/F1136M , ASTM F2833 or ASTM B695 for threaded parts or ASTM A123/A123M for structural steel members exposed to weather , as applicable, unless specified otherwise galvanize after fabrication where practicable.
2.6 FABRICATION
Fabrication must be in accordance with the applicable provisions of AISC 325 . Fabrication and assembly must be done in the shop to the greatest extent possible. Punch, subpunch and ream, or drill bolt holes perpendicular to the surface of the member.
Compression joints depending on contact bearing must have a surface roughness not in excess of 13 micrometer as determined by ASME B46.1 , and ends must be square within the tolerances for milled ends specified in
ASTM A6/A6M.
Shop splices of members between field splices will be permitted only where indicated on the Contract Drawings. Splices not indicated require the approval of the Contracting Officer.
2.6.1 Markings
Prior to erection, identify members by a painted erection mark.
Connecting parts assembled in the shop for reaming holes in field connections must be match marked with scratch and notch marks. Do not locate erection markings on areas to be welded. Do not locate match markings in areas that will decrease member strength or cause stress concentrations.
2.6.2 Shop Primer
SSPC Paint 20 or SSPC Paint 29 , (zinc rich primer). Shop prime structural steel, except as modified herein, in accordance with SSPC PA 1 . Do not prime steel surfaces embedded in concrete, galvanized surfaces, or surfaces within 13 mm of the toe of the welds prior to welding (except surfaces on which metal decking and shear studs are to be welded). If flash rusting occurs, re-clean the surface prior to application of primer. Apply primer to a minimum dry film thickness of 0.05 mm. Submit shop primer product data.
SECTION 05 12 00 Page 10
Prime slip critical surfaces with a Class B coating in accordance with AISC 325 . Submit test report for Class B coating.
Prior to assembly, prime surfaces which will be concealed or inaccessible after assembly. Do not apply primer in foggy or rainy weather; when the ambient temperature is below 7 degrees C or over 35 degrees C; or when the primer may be exposed to temperatures below 4 degrees C within 48 hours after application, unless approved otherwise by the Contracting Officer.
Repair damaged primed surfaces with an additional coat of primer.
2.6.2.1 Cleaning
SSPC SP 6/NACE No.3 , except steel exposed in spaces above ceilings, attic spaces, furred spaces, and chases that will be hidden to view in finished construction may be cleaned to SSPC SP 3 when recommended by the shop primer manufacturer. Maintain steel surfaces free from rust, dirt, oil, grease, and other contaminants through final assembly.
2.7 DRAINAGE HOLES
Drill adequate drainage holes to eliminate water traps. Hole diameter must be 13 mm and location indicated on the detail drawings. Hole size and locations must not affect the structural integrity.
PART 3 EXECUTION
3.1 ERECTION
a. Erection of structural steel, except as indicated in item b. below, must be in accordance with the applicable provisions of AISC 325 , AISC 303 and 29 CFR Part 1926, Subpart R .
b. For low-rise structural steel buildings (18 m tall or less and a maximum of 2 stories), erect the structure in accordance with
AISC DESIGN GUIDE 10 .
After final positioning of steel members, provide full bearing under base plates and bearing plates using nonshrink grout. Place nonshrink grout in accordance with the manufacturer's instructions.
3.1.1 STORAGE
Store the material out of contact with the ground in such manner and location as to minimize deterioration.
3.2 CONNECTIONS
Except as modified in this section, design connections indicated in accordance with AISC 360 . Build connections into existing work. Do not tighten anchor bolts set in concrete with impact torque wrenches. Holes must not be cut or enlarged by burning. Bolts, nuts, and washers must be clean of dirt and rust, and lubricated immediately prior to installation.
3.2.1 Common Grade Bolts
Tighten ASTM A307 bolts to a "snug tight" fit. "Snug tight" is the tightness that exists when plies in a joint are in firm contact. If firm contact of joint plies cannot be obtained with a few impacts of an impact wrench, or the full effort of a man using a spud wrench, contact the
SECTION 05 12 00 Page 11
Contracting Officer for further instructions.
3.2.2 High-Strength Bolts
Provide direct tension indicator washers in all ASTM F3125/F3125M , Grade A325M and Grade A490M bolted connections. Bolts must be installed in connection holes and initially brought to a snug tight fit. After the initial tightening procedure, fully tension bolts, progressing from the most rigid part of a connection to the free edges.
Fastener components shall be protected from dirt and moisture in closed containers at the site of the installation. Fastener components that are not incorporated into the work shall be returned to protected storage at the end of the work shift.
3.2.2.1 Installation of Direct Tension Indicator Washers (DTIW)
Where possible, install the DTIW under the bolt head and tighten the nut.
If the DTIW is installed adjacent to the turned element, provide a flat washer between the DTIW and nut when the nut is turned for tightening, and between the DTIW and bolt head when the bolt head is turned for tightening. In addition to the LIW, provide flat washers under both the bolt head and nut when ASTM F3125/F3125M , Grade A490M bolts are used.
3.2.3 Tension Control Bolts
Bolts must be installed in connection holes and initially brought to a snug tight fit. After the initial tightening procedure, fully tension bolts, progressing from the most rigid part of a connection to the free edges.
3.3 GAS CUTTING
Use of gas-cutting torch in the field for correcting fabrication errors is not permitted on any major member in the structural framing. Use of a gas cutting torch will be permitted on minor members not under stress only after approval has been obtained from the Contracting Officer.
3.4 WELDING
Welding must be in accordance with AWS D1.1/D1.1M . Provide AWS D1.1/D1.1M qualified welders, welding operators, and tackers.
Develop and submit the Welding Procedure Specifications (WPS) for all welding, including welding done using prequalified procedures. Submit for approval all WPS, whether prequalified or qualified by testing.
3.5 SHOP PRIMER REPAIR
Repair shop primer in accordance with the paint manufacturer's recommendation for surfaces damaged by handling, transporting, cutting, welding, or bolting.
3.5.1 Field Priming
Field prime steel exposed to the weather, or located in building areas without HVAC for control of relative humidity. After erection, the field bolt heads and nuts, field welds, and any abrasions in the shop coat must be cleaned and primed with paint of the same quality as that used for the
SECTION 05 12 00 Page 12 shop coat.
3.6 GALVANIZING REPAIR
Repair damage to galvanized coatings using ASTM A780/A780M zinc rich paint for galvanizing damaged by handling, transporting, cutting, welding, or bolting. Do not heat surfaces to which repair paint has been applied.
3.7 FIELD QUALITY CONTROL
Perform field tests, and provide labor, equipment, and incidentals required for testing. Notify the Contracting Officer in writing of defective welds, bolts, nuts, and washers within 7 working days of the date of the inspection.
3.7.1 Welds
3.7.1.1 Visual Inspection
AWS D1.1/D1.1M . Furnish the services of AWS-certified welding inspectors for fabrication and erection inspection and testing and verification inspections. A Certified Welding Inspector must perform visual inspection on 100 percent of all welds. Document this inspection in the Visual Weld Inspection Log. Submit certificates indicating that certified welding inspectors meet the requirements of AWS QC1.
3.7.1.2 Nondestructive Testing
Nondestructive testing must be in accordance with AWS D1.1/D1.1M . Test locations must be selected by the Contracting Officer. All personnel performing NDT must be certified in accordance with ANSI/ASNT CP-189 in the method of testing being performed. Submit certificates showing compliance with ANSI/ASNT CP-189 for all NDT technicians. If more than 20percent of welds made by a welder contain defects identified by testing, then all groove welds made by that welder must be tested by ultrasonic testing, and all fillet welds made by that welder must be inspected by magnetic particle testing (MT) or dye penetrant testing (PT) as approved by the Contracting Officer. When groove welds made by an individual welder are required to be tested, magnetic particle or dye penetrant testing may be used only in areas inaccessible to ultrasonic testing.
Retest all repaired areas. Submit weld inspection reports.
3.7.2 Direct Tension Indicator Washers
3.7.2.1 Direct Tension Indicator Washer Compression
Test direct tension indicator washers in place to verify that they have been compressed sufficiently to provide the 0.38 mm gap, as required by ASTM F959/F959M . Submit direct tension indicator washer inspection reports.
-- End of Section --
SECTION 05 12 00 Page 13
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 27 19.01
SELF-ADHERING AIR BARRIERS…
This is the start of the file's text. The full file is on GovTribe.