480088 480569_Ku Super Hornet COST BREAKDOWN - 11-19-2021 Amendment 0009.pdf

PDF 320 KB Posted

Attached to
Amendment 0015 to Super Hornet Procurement B, Package 005 (Organizational Level Maintenance Hangar) and Package 001A/B (Base Infrastructure)
Solicitation number
W912ER21R0025
Issued by

About this file

This cost breakdown document provides pricing details for a federal construction contract to build facilities at Al Jaber Air Base in Kuwait. Key work includes an Organizational Level Maintenance Hangar, Organizational Level Corrosion Control Hangar, guard house, utility infrastructure, electrical switching and substations, telecommunications infrastructure, and associated site work. Fifteen base line items and eight optional line items are outlined with direct costs broken down by materials, subcontractors, labor, equipment, overhead and profit. The Army Corps of Engineers Middle East District is the contracting agency. The solicitation number is W912ER21R0025 and the document relates to Amendment 0009 of the Super Hornet Procurement B project.

View the file

Other files

File Type Posted
A154_Amendment 0015 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
A154_Amendment 0014 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 6 OF 7 (PKG 1B SEC 01 50 00) JAN 22.pdf PDF
A154_Amendment 0013 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2022_0106_Pkg 5_ Rev A 0013_All Drawings.pdf PDF
2021_1229_Pkg 1A_ A 0013_All Drawings.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 2 OF 7 (PKG 1A) - JAN 22.pdf PDF
AMENDMENT 0013 SPECIFICATIONS DOC FOR VOL 4 OF 7 (PKG 5) JAN 22.pdf PDF
AMENDMENT 0013 NARRATIVE - 21R0025 Superhornet Procurement B -JAN 22.pdf PDF
A154_Amendment 0012 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_1220_Pkg 1B A_12_All Drawings.pdf PDF
2021_1214_Pkg 1A_ A11_All Drawings.pdf PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 6 OF 7 - PACKAGE 1B.PDF PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 2 OF 7 - PACKAGE 1A.pdf PDF
AMENDMENT 0011 - SPECIFICATIONS DOC FOR VOL 4 OF 7 - PACKAGE 5.pdf PDF
A154_Amendment 0011 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_1214__Pkg 5_A11_All Drawings.pdf PDF
Amendment 0011 PROPOSAL SCHEDULE AND COST BREAKDOWN Super Hornet Kuwait.xls XLS spreadsheet
A154_Amendment 0010 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
DRAWING DOCUMENT VOL 3 FOR PKG 1B.pdf PDF
REVISED COVER - VOL 4 OF 5 (NOW 7) PKG 5 SPECS ORG LEVEL MAINT HANGAR.pdf PDF
VOL 6 OF 7 - SPEC PKG 1B 480088 Base Infrastr Elec and Telecomm SPECIFICATIONS.pdf PDF
480088 480569_Ku Super Hornet COST PROPOSAL - 11-19-2021 Amendment 0009.pdf PDF
AMENDMENT 0009 SPEC DOCUMENT FOR VOL 4 OF 7 (PKG 5).pdf PDF
REVISED COVER - VOL 2 OF 5 (NOW 7) SPECS PKG 1A BASE INFRSTR FOR FAC AT CLIN5 4800881A.pdf PDF
REVISED COVER - VOL 5 OF 5 (NOW 7) SPECS FOR PKG 5 SUPP DOCS - SPECS_CLIN 5_VOL2.pdf PDF
A154_Amendment 0009 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0009 SPEC DOCUMENT FOR VOL 2 OF 7 (PKG 1A).pdf PDF
REVISED COVER - VOL 3 OF 5 (NOW 7) PKG 1A BASE INFRA (FOR PKG 5) SUPP DOCS - 480088 AE-SPECS_CLIN 5_VOL2 FROM ORIG FILE.pdf PDF
VOL 7 OF 7 - SPEC PKG 1B 480088 Base Infrastr Elec and Telecomm Supplemental Docs.pdf PDF
A154_Amendment 0008 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0008 - SPEC DOCUMENT SEC 33 16 15 FOR PKG 1A.pdf PDF
2021_1015_Proc B_Pkg 1A_Amendment 0008_All Drawings.pdf PDF
2021_1007_Proc B_Pkg 1A_Rev Amendment 0007_All Drawings - 04NOV21.pdf PDF
AMENDMENT 0008 - SPEC DOCUMENT FOR PKG 5 (3 SECTIONS).pdf PDF
2021_1015_Proc B_Pkg 5_Amendment 0008_All Drawings.pdf PDF
AMENDMENT 0007 SPECIFICATION DOC FOR PKG 5.pdf PDF
2021_1014_Proc B_Pkg 5_Rev Amendment 0007_All Drawings.pdf PDF
A154_Amendment 0007 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
AMENDMENT 0007 SPECIFICATION DOC FOR PKG 1A.pdf PDF
A154_Amendment 0006 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
2021_0827_Proc B_Package 1A_Amendment 0005_All Drawings.pdf PDF
2021_0827_Proc B_Package 5_Amendment 0005_All Drawings.pdf PDF
A154_Amendment 0005 to Solicitation W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
A154_Amendment 0004 W912ER21R0025 Super Hornet Procurement B Kuwait.pdf PDF
Package 1A_Amendment 0004_All Drawings Super Hornet Procurement B Kuwait.pdf PDF
Proposal Schedule Amendment 0004 Super Hornet Procurement B Kuwait.pdf PDF
Package 5_Amendment 0004_All Drawings Super Hornet Procurement B Kuwait.pdf PDF
APPENDIX A (RFP Attachments) W912ER21R0025 Super Hornet Procurement B Kuwait.docx DOCX document
Cost Breakdown Sheet Amendment 0004 Super Hornet Procurement B Kuwait.pdf PDF
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: W912ER21R0025 P2# 480088 & 480569

PROJECT: Super Hornet Packages 001A, 001B, & 005 Amendment 0009 PROPOSER:

LOCATION: Kuwait DATE:

Primary Facilities

Mobilization and Demobilization

Mobilization and Demobilization in accordance with the Contract Documents.

Sitework and Utility Infra. Fac. A

Construct Sitework and Utility Infrastructure, identified as Facility A in Package 1A, in accordance with the Contract Documents. This work includes but may not be limited to demolition of existing facilities, rough grading, stormwater improvements, and all utility infrastructure (domestic water, sanitary sewer, and fire water) identified as Facility A in Package 1A.

Pump House, Water Storage Tanks

Construct Pump House and Water Storage Tanks in accordance with the Contract Documents. This work is identified as Facility P in Package 1A.

Org. Level Corrosion Control Hangar

Construct Organizational Level Corrosion Control Hangar in accordance with the Contract Documents. This work is further identified as Facility D in Package 5.

Org. Level Maintenance Hangar

Construct Organizational Level Maintenance Hangar in accordance with the Contract Documents. This work is further identified as Facility J in Package 5.

BOND

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)*

EXHIBIT 1 Page 1 of 8

LOCATION: Kuwait DATE:

BOND

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)*

Guard House

Construct Guard House in accordance with the Contract Documents. This work is identified as part of Facility N in Package 5. The work of this CLIN does not include Vehicle Parking Sunshades and Equipment Shelters, which is included in a different CLIN.

Sitework and Utility Infra. Fac D, J, N

Construct Associated Sitework and Utility Infrastructure to support Package 5 Facilities D, J, and N in accordance with the Contract Documents. This work includes, but is not limited to, utility tie-ins, fine grading, site concrete, asphalt pavement, and other incidental site improvements associated with Facilities D (Organizational Level Corrosion Control Hangar), J (Organizational Level Maintenance Hangar), and N (Guard House, Parking Area, etc).

Electrical Switching Station

Construct Electrical Switching Station in accordance with the Contract Documents.

This work is identified as part of Facility R in Package 1B. This work includes, but may not be limited to, grading, concrete and/or asphalt pavements, and construction of the new Switching Station and electrical gear.

This work does not include site electrical medium voltage ductbank or cabling, which is included in a different

CLIN.

EXHIBIT 1 Page 2 of 8

LOCATION: Kuwait DATE:

BOND

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)*

Electrical Substation #1

Construct Electrical Substation #1 in accordance with the Contract Documents.

This work is identified as Facility S in Package 1B. This work includes, but may not be limited to, grading, concrete and/or asphalt pavements, and construction of the new Electrical Substation #1 and electrical gear. This work does not include site electrical medium or low voltage ductbank or cabling, which is included in a different

CLIN.

Electrical Substation #2

Construct Electrical Substation #2 in accordance with the Contract Documents.

This work is identified as Facility T in Package 1B. This work includes, but may not be limited to, grading, concrete and/or asphalt pavements, and construction of the new Electrical Substation #2 and electrical gear. This work does not include site electrical medium or low voltage ductbank or cabling, which is included in a different

CLIN.

MV Ductbank & Cabling to Substa #1 & #2

Construct Site Electrical Medium Voltage Ductbank and Cabling from the Electrical Switching Station (Facility R in Package 1B) to Electrical Substation #1 (Facility S in Package 1B) and Electrical Substation #2 (Facility T in Package 1B) in accordance with the Contract Documents. This Site Electrical Medium Voltage Ductbank and Cabling is identified as part of Facility R in Package 1B. This work includes any associated excavation, backfill and compaction, utility or pavement crossings, pavement replacement, and any other incidental related work.

EXHIBIT 1 Page 3 of 8

LOCATION: Kuwait DATE:

BOND

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)*

LV Ductbank & Cabling From Substa #1 & #2

Construct Site Electrical Low Voltage Ductbank and Cabling from Electrical Substation #1 (Facility S in Package 1B) and Electrical Substation #2 (Facility T in Package 1B) to all new or existing facilities serviced by either substation, in accordance with the Contract Documents. This Site Electrical Low Voltage Ductbank and Cabling is identified as part of Facility R in Package 1B. This work includes excavation, backfill, compaction, utility or pavement crossings, pavement replacement, and incidental related work.

LV Ductbank & Cabling to Warehouse

Construct Site Electrical Low Voltage Ductbank and Cabling from Existing Substation S/S N5 to new facility Package 3 General Purpose Warehouse in accordance with the Contract Documents. This work includes tie-in to existing S/S N5 and termination at Package 3 General Purpose Warehouse. This Contract does not include construction of Package 3 General Purpose Warehouse (by others). This work includes any associated excavation, backfill and compaction, utility or pavement crossings, pavement replacement, and any other incidental related work.

EXHIBIT 1 Page 4 of 8

LOCATION: Kuwait DATE:

BOND

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)*

Telecom Infra at Existing Vault

Construct Telecommunications Infrastructure at Existing Communications Vault in accordance with the Contract Documents. This work is identified as part of Facility R Electrical Switching Station in Package 1B. This work includes, but may not be limited to, all equipment, cabling, and terminations within the existing Communications Vault, Handhole HH-01, and all site telecommunications ductbank and cabling from the Communications Vault to HH-01.

Telecom Ductbank and Cabling

Construct Site Telecommunications Ductbank and Cabling identified as part of Facility R in Package 1B in accordance with the Contract Documents. The scope of this CLIN includes all site telecommunications ductbank and cabling as shown, EXCEPT for any telecommunications ductbank and cabling from handhole HH-07 to Package 6 Aircrew Training Facility (HH-08, HH-09, and new infrastructure within the existing Aircrew Training Facility Building).

Work includes excavation, backfill, compaction, utility or pavement crossings, pavement replacement, and incidental related work.

TOTAL BASE (ITEMS 0001 - 0015)

EXHIBIT 1 Page 5 of 8

LOCATION: Kuwait DATE:

BOND

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)*

OPTIONAL CLINS

Power Check and Compass Calibration Pads

Construct Power Check Pad and Compass Calibration Pad complete in accordance with the Contract Documents. The work includes, but is not limited to, any sitework and utilities specifically associated with these facilities. This work is identified as Facilities B and C in Package 1A.

Parking Sunshades & Equipment Shelters

Construct Vehicle Parking Sunshades and Equipment Shelters in accordance with the Contract Documents. This work is identified as part of Facility N in Package 5. The work of this CLIN does not include the Guard House, which is included a different CLIN.

Electrical Substation #3

Construct Electrical Substation #3 in accordance with the Contract Documents.

This work is identified as Facility V in Package 1B. This work includes, but may not be limited to, grading, concrete and/or asphalt pavements, and construction of the new Electrical Substation #3 and electrical gear. This work does not include site electrical medium or low voltage ductbank or cabling, which is included in a different

CLIN.

EXHIBIT 1 Page 6 of 8

LOCATION: Kuwait DATE:

BOND

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)*

MV Ductbank & Cabling to Substa #3

Construct Site Electrical Medium Voltage Ductbank and Cabling from the Electrical Switching Station (Facility R in Package 1B) to Electrical Substation #3 (Facility V in Package 1B) in accordance with the Contract Documents. This Site Electrical Medium Voltage Ductbank and Cabling is identified as part of Facility R in Package 1B. This work includes any associated excavation, backfill and compaction, utility or pavement crossings, pavement replacement, and any other incidental related work.

LV Ductbank & Cabling From Substa #3

Construct Site Electrical Low Voltage Ductbank and Cabling from Electrical Substation #3 (Facility V in Package 1B) to all new or existing facilities serviced by this substation, in accordance with the Contract Documents.

This Site Electrical Low Voltage Ductbank and Cabling is identified as part of Facility R in Package 1B. This work includes any associated excavation, backfill and compaction, utility or pavement crossings, pavement replacement, and any other incidental related work.

LV Ductbank & Cabling to CALA

Construct Site Electrical Low Voltage Ductbank and Cabling from Existing UDS1 to new facility Package 2 Combat Aircraft Loading Area (CALA) in accordance with the Contract Documents. This work includes tie-in to existing UDS1 and termination at Package 2 CALA. This Contract does not include construction of Package 2 CALA (by others). This work includes any associated excavation, backfill and compaction, utility or pavement crossings, pavement replacement, and any other incidental related work.

EXHIBIT 1 Page 7 of 8

LOCATION: Kuwait DATE:

BOND

DIRECT

MATERIALS COST

SUB CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL

OVERHEAD/INDIRECT

COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

INDIRECT COST

JOOH (G&A)*

INDIRECT COST

HOOH (G&A)*

Telecom Ductbank & Cabling to Training Fac

Construct Site Telecom Ductbank and Cabling to Package 6 Aircrew Training Facility in accordance with the Contract Documents. This work is part of Facility R in Package 1B. This CLIN includes telecom ductbank and cabling from handhole HH-07 to Package 6 Aircrew Training Facility (HH-08, HH-09, and new infrastructure within the existing Training Facility). This work includes excavation, backfill, compaction, utility or pavement crossings, pavement replacement, infrastructure within the existing facility, and incidental work.

Enhanced Turnover Assistance

Provide Enhanced Turnover Assistance for all work completed in this Contract as described in Specification Section 01 15

00.12 10, Paragraph 1.11, in accordance with the Contract Documents.

TOTAL OPTIONS (ITEMS 0016 THRU 0023)

TOTAL BASE BID ( ITEMS 0001 - 0015) &

OPTIONS (ITEM 0016 - 0023)

EXHIBIT 1 Page 8 of 8

File details come from the government source that posted it. Updated .