Design and construction of 5,964 SF addition to an existing aircraft paint shop and installation of a media blast booth
Open Pre-Solicitation Posted
- Solicitation number
- W912DW27R1CV6
- Agency
-
ENDIST Seattle
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Joint Base Lewis McChord, Washington, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Seattle intends to solicit a Progressive Design-Build procurement using Other Transaction Authority for design and construction of a 5,964 SF addition to an existing aircraft paint shop and installation of a media blast booth at Joint Base Lewis-McChord, Washington, with responses due November 18, 2026. The notice's Set Aside line reads "No Set-Aside Used," but the attached document's derived summary describes a sources sought targeting small businesses; verify against the attachment before making a pursuit decision. The attachment summary lists an estimated construction cost of $10.26 million and approximately 674 days for design and construction following notice to proceed, under NAICS 236220 and PSC Y1JZ with a $45.0 million small business size standard. Scope includes fire protection, intrusion detection, hazardous material storage, sustainability and energy monitoring systems, site development, and utilities. Selection is competitive and qualifications-based with an interactive pitch phase, and the Government may subsequently choose alternative procurement strategies. The attachment summary lists capabilities packages due 2:00 PM PST on November 24, 2026, which conflicts with the November 18 notice due date. Packages are limited to 10 pages (excluding joint venture and bonding information) and go to russell.j.armstrong@usace.army.mil with a copy to susan.f.newby@usace.army.mil. Required content includes up to three past projects from the prior seven years as prime or key subcontractor, self-performance percentage estimates, subcontracting assessments, and bonding limits. No funds are available for proposal preparation, and the announcement is not a binding solicitation.
Notice text
Please see attached.
Files
| File | Type | Posted |
|---|---|---|
| Sources Sought PDB w_OTA JBLM Paint Shop and Media Blast Booth.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222 | ENDIST Seattle | Total Small Business | |
| Joint base lewis mcchord multi domain task force buildings 3223-3224, washington | ENDIST Seattle | Total Small Business | |
| Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID | ENDIST Seattle | No set-aside | |
| F-15 Aerospace Ground Equipment (AGE) Facility, Vandenberg SFB | ENDIST Los Angeles | No set-aside | |
| PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT | ENDIST Wilmington | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity