Recovery: Edith Green/Wendell Wyatt Federal Building Modernization

Award Notice Posted

Solicitation number
GS-10P-09-LT-C-0052
Agency
Awarded
to Howard S Wright Companies Oregon Joint Venture
Set-aside
No set-aside

Opportunity facts

Contract number
GS-10P-09-LT-C-0052 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
1220 SW Third Avenue Portland, Oregon 97204, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The option cited in the December 15, 2009 notice was exercised by modification PS03 July 23, 2010.  The modification exercised the option (contract line item number 0002) at the amount of $123,500,000.  Total contract price was then changed to $124,617,242.

Update #2 ·

This is a Construction Management as Constructor (CMc) contract.   The base contract is for Design Phase Services, which consist of pre-construction activity, primarily verification of all design documents for constructability and cost realism.  This phase also involves partnering activity, verifying site conditions, value engineering, schedule development, subcontract plan development, and estimating.  The Design Phase duration is approximately 9 months.

The contract includes a bi-lateral option for Construction Phase Services (actual modernization of the building).  The construction duration will be approximately 30 months and is estimated to cost approximately $110,000,000.

INTERESTED PARTIES ARE ADVISED THAT PROJECT STATUS WILL CONTINUE TO BE POSTED TO THIS WEB SITE.  THIS WILL INCLUDE PROJECT SCHEDULES AND PROCESSES FOR SUBCONTRACT AND SUPPLIER REFERRALS.

Update #1 ·

 


PROJECT DESCRIPTION: GSA is seeking a contractor to perform as CMc (Construction Manager as Constructor) for the Edith Green Wendell Wyatt (EGWW) Federal Building Modernization Project at 1220 SW Third Avenue, Portland, OR.


BACKGROUND: Originally (approximately 2 years ago), this project envisioned a building upgrade to include ADA restrooms, seismic, electrical, HVAC distribution, complete building re-cladding, secure entry, blast and seismic resistance, lower level exit, 1st Impressions, tenant space, finishes, HVAC replacement, and security system equipment. The goal was to achieve LEED Silver Certification. Work involves renovation of about 500,000 gsf of space. The project was put on hold when Congress did not appropriate the construction funding.


CURRENT UPDATE: This project is now being funded under American Recovery and Reinvestment Act (ARRA). The project is being re-scoped to align more closely with the High Efficiency Green Building requirements (Energy Independence and Security Act, EISA) as mandated by ARRA. The re-scoping effort will include a workshop hosted by GSA in EGWW on May 14th and 15th.


WORKSHOP REGISTRATION: Contractors planning to compete for the CMc contract are invited to attend the workshop. Space is limited, so attendance will be limited to 1 representative per contractor. Participation will be limited to auditing the workshop only (not active participation). Interested participants should register by contacting Chad O'Brien at chad.obrien@gsa.gov.


OCCUPANCY STATUS (DURING CONSTRUCTION): Originally, GSA intended to renovate the building while the building was occupied, with construction activity meticulously phased around the tenant agencies, requiring tenants to be moved to swing space and back to their final space in the building. AS THE PROJECT IS BEING RE-SCOPED, GSA IS ATTEMPTING TO VACATE THE BUILDING BEFORE CONSTRUCTION BEGINS.


PROJECT CONSTRAINTS: ARRA funding must be obligate by September 2010, meaning GSA and the CMc must reach agreement on the Guaranteed Maximum Price (GMP) by that date. Construction funding must be expensed by September 2014. ARRA prescribed Buy American, Whistleblower, and Reporting and Invoicing requirements will be included.


VARIATION FROM TYPICAL CMc DELIVERY METHOD: The CMc solicitation (RFP) may require that the CMc also include or propose up to 5 first tier subcontractors. The RFP and resulting contract will include an option to acquire A-E services after award. That option would only be exercised if agreement on the A-E scope of work for CA phase services cannot be reached by GSA, the CMc, and GSA's A-E.


EARLY EXCHANGES: Early exchange meetings have been conducted with interested parties that responded to the original pre-solicitation notice (posted 2 years ago). GSA will meet with any party interested in competing for the CMc contract. During the meeting GSA will present a timeline of project activity to date and answer any project related questions.


As early exchange meetings occur, GSA will summarize those exchanges and post them with this notice. GSA will also post relevant technical documents related to this project (for example, summary of the workshop conducted on May 14th and 15th).


PROJECT MAGNITUDE: The Estimated Cost of Construction is between $110,000,000.00 and $125,000,000.00.


PROJECT DURATION: GSA has re-opened the A-E contract with the original designer, SERA Architects. SERA will be responsible for updating the technical requirement package (DDs/CDs). The CMc design phase services are projected to last 6 months. The construction duration is projected to last 30-40 months.


COMPETITION: Unrestricted.


CONTRACTING METHOD: Best Value Source Selection, Guaranteed Maximum Price (GMP) Contract Type with Construction Manager as Constructor (CMc) Delivery Method with potential Award Fee. The scope of CMc services is to include Design Phase Services (constructability reviews, value engineering, project schedule and construction cost development, etc.) and Construction Phase Services (construction contract and subcontract administration, CPM scheduling, monitoring of construction costs, etc.). For this contract, technical factors will be given greater weight than price (Design Phase Services and the GMP Proposal) in the selection of a successful offeror.

PROPOSAL SUBMISSION REQUIREMENTS: GSA presently plans to evaluate proposals in two Phases. In Phase 1, offerors will be evaluated on technical factors including qualifications, past performance, and key personnel. Phase 2 offerors will be evaluated on submission of their GMP Proposal consisting of a conceptual estimate and pricing for Design Phase Services, and any other requirements stated in detail in the RFP. PLEASE NOTE, THE ACTUAL PROPOSAL REQUIREMENTS MAY CHANGE BASED ON FEEDBACK RECEIVED DURING EARLY EXCHANGE ACTIVITY.


CONTRACT AWARD: A guaranteed maximum price (GMP) contract will be awarded.


SOLICITATION ISSUE DATE: Presently, the RFP expected release date is July 7, 2009. GSA is attempting to better that date and may post a draft copy.


PRE-PROPOSAL CONFERENCE: A pre-proposal conference is likely to be conducted. The conference date will be confirmed via posting in FBO at a later date.


SOLICITATION DISTRIBUTION METHOD: Exclusively via FedBizOpps electronic postings. No paper documents will be issued.


REGISTRATION: It is strongly recommended that interested parties click on "Add Me to Interested Vendors" at the bottom of the solicitation to be added to the interested vendors list for contact and networking. Additionally, it is strongly recommended that interested parties click on "Add to Watchlist" at the bottom of the solicitation to receive notification of additional postings related to this project.


 

Files

File Type Posted
Award_GS-10P-09-LT-C-0052.pdf PDF
Pavement_Markings_-_FedBizOpps_Form.pdf PDF
ER__14.01_-_Kitchen_Equipment.pdf PDF
Signage Bid Package.pdf PDF
ER 10.01 - Earthwork and Utilities.pdf PDF
ER 11.01 - Exterior Building Cleaning.pdf PDF
ER 9 - Roller Shades and Final Cleaning.pdf PDF
ER 8.01 - Cistern Waterproofing - FedBizOpps Form.pdf PDF
Affirmative Action Fact Sheet 1 Final 11-30-11.pdf PDF
Consolidated Directory October Update.pdf PDF
EGWW FS Small Business 12-1-11 V4 CONSOLIDATED.pdf PDF
EGWW SBA calendar Oct 11 Update for FedBizOps.pdf PDF
ER 7.01 - Plaza Level Waterproofing - FedBizOpps Form.pdf PDF
ER 6.01 - Arch Wood Casework - FedBizOpps Form.pdf PDF
Community Construction Training Fund RFP - FedBizOpps Form.docx DOCX document
Community Outreach Meeting 1.pdf PDF
Bid Phase 3 - Sub Fail FedBizOpps.pdf PDF
ER 4 - Early Release Packages - 10 05 10.pdf PDF
Bid Phase 2 - Sub Fair FedBizOpps rev 3 07.28.10.pdf PDF
Strategy for Outreach.pdf PDF
ER 002 - FedBizOpps Form.docx DOCX document
EGWW PS02 PLA Executed.pdf PDF
EGWW Final Executed PLA4.28.10.pdf PDF
BP 001 - Well Drilling.docx DOCX document
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Amendment 007.pdf PDF
Amendment 6.pdf PDF
Amendment 6 Attachment GMP Pricing Assumptions.pdf PDF
Amendment 005.pdf PDF
Tech Docs for CMc Pricing.docx DOCX document
06-09 Scope Changes and Cost Summary 10-01-09 V1.xlsx XLSX spreadsheet
Staffing and Summary Worksheet 10-1-09 V2.xls XLS spreadsheet
Attachment to Amendment 005 Block 14 10-2-09 V4.doc DOC document
Amendment 004.pdf PDF
PIB 09-02.pdf PDF
Amendment 003.pdf PDF
Sections 100 600 700 Updated 8-17-09.doc DOC document
Pre-Proposal Conference Minutes 7-29-09.pdf PDF
Attachment 2 Technical Documents.pdf PDF
Amendment 002.pdf PDF
Amendment 001.pdf PDF
06 RFP —
Past Performance Evaluation - Owner V3 7-9-09.xls XLS spreadsheet
V3 PDF Format.pdf PDF
Contractor POCs EGWW 6-27-09 V4.xls XLS spreadsheet
Market Research Summary 6-25-09 V2 FINAL.doc DOC document
Transmittal E-Mail.doc DOC document
EMC Decision Flow Chart.pdf PDF
09_05_29_Synthesis HPBW.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors