- GS-10P-09-LT-C-0052
About this file
Amendment 006
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror 15C. Date Signed 16C. Date Signed
(Signature of person authorized to sign)
16B. United States of America
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
1. Contract ID Code Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable) 006 October 9, 2009
6. Issued By Code 10PCPB 7. Administered By (If other than Item 6) Code General Services Administration SEE BLOCK 6 Acquisitions Solutions Branch (10PCQ) 400 15th St SW Auburn, WA 98001-6599
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
GS-10P-09-LT-C-0052
X 9B. Date (See Item 11) July 17, 2009 10A. Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended s is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
x B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b) C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 03 copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE PAGE 2
SOLICITATION GS-10P-09-LT-C-0052, AMENDMENT 0006 Page 2 of 2
1. This amendment provides additional instructions for the Guaranteed Maximum Price (GMP) submission, specifically it identifies what elements of the project scope should be estimated by the CMc team, and what elements should be "estimated" using pricing assumption provided by GSA. The pricing assumptions provided must be included in the GMP (appropriately burdened).
2. Attached Documents (titles in Capital Bold):
06-09 Scope Changes and Cost Summary - WITH PRICING ASSUMPTIONS
3. The amounts (pricing assumptions) cited on the attachment are unburdened (they do not include general conditions, site logistics, prime fees, bonding and insurance). They should be treated/considered subcontractor bid amounts.
4. General conditions include staffing cost for site office personnel. General Conditions should not include site logistics or field labor. Field labor is Superintendent and below, and should be treated/considered site logistics.
5. Site logistics cost should include Superintendent; Assistant Superintendent(s); security; clean-up; crane rentals; temporary fencing; portable toilets, and related/like costs.
6. General conditions and site logistics should be estimated as separate elements.
7. Offerors should schedule a 1 hour telecon with GSA (Chad O'Brien) to discuss questions or clarifications needed for amendment 5 and 6. The telecon should be scheduled to occur before Friday October 17.
8. The submission date for Design Phase and GMP submissions is unchanged (see amendment 4).