06-09 Scope Changes and Cost Summary 10-01-09 V1.xlsx

XLSX spreadsheet 98 KB Posted

Attached to
Recovery: Edith Green/Wendell Wyatt Federal Building Modernization
Solicitation number
GS-10P-09-LT-C-0052
Issued by

About this file

06-09 Scope Changes and Cost Summary

View the file

Other files

File Type Posted
Award_GS-10P-09-LT-C-0052.pdf PDF
Pavement_Markings_-_FedBizOpps_Form.pdf PDF
ER__14.01_-_Kitchen_Equipment.pdf PDF
Signage Bid Package.pdf PDF
ER 10.01 - Earthwork and Utilities.pdf PDF
ER 11.01 - Exterior Building Cleaning.pdf PDF
ER 9 - Roller Shades and Final Cleaning.pdf PDF
ER 8.01 - Cistern Waterproofing - FedBizOpps Form.pdf PDF
Affirmative Action Fact Sheet 1 Final 11-30-11.pdf PDF
EGWW FS Small Business 12-1-11 V4 CONSOLIDATED.pdf PDF
EGWW SBA calendar Oct 11 Update for FedBizOps.pdf PDF
Consolidated Directory October Update.pdf PDF
ER 7.01 - Plaza Level Waterproofing - FedBizOpps Form.pdf PDF
ER 6.01 - Arch Wood Casework - FedBizOpps Form.pdf PDF
Community Construction Training Fund RFP - FedBizOpps Form.docx DOCX document
Community Outreach Meeting 1.pdf PDF
Bid Phase 3 - Sub Fail FedBizOpps.pdf PDF
ER 4 - Early Release Packages - 10 05 10.pdf PDF
Bid Phase 2 - Sub Fair FedBizOpps rev 3 07.28.10.pdf PDF
Strategy for Outreach.pdf PDF
ER 002 - FedBizOpps Form.docx DOCX document
EGWW PS02 PLA Executed.pdf PDF
EGWW Final Executed PLA4.28.10.pdf PDF
BP 001 - Well Drilling.docx DOCX document
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Amendment 007.pdf PDF
Amendment 6 Attachment GMP Pricing Assumptions.pdf PDF
Amendment 6.pdf PDF
Amendment 005.pdf PDF
Tech Docs for CMc Pricing.docx DOCX document
Attachment to Amendment 005 Block 14 10-2-09 V4.doc DOC document
Staffing and Summary Worksheet 10-1-09 V2.xls XLS spreadsheet
PIB 09-02.pdf PDF
Amendment 004.pdf PDF
Sections 100 600 700 Updated 8-17-09.doc DOC document
Amendment 003.pdf PDF
Pre-Proposal Conference Minutes 7-29-09.pdf PDF
Attachment 2 Technical Documents.pdf PDF
Amendment 002.pdf PDF
Amendment 001.pdf PDF
06 RFP —
Past Performance Evaluation - Owner V3 7-9-09.xls XLS spreadsheet
Market Research Summary 6-25-09 V2 FINAL.doc DOC document
Contractor POCs EGWW 6-27-09 V4.xls XLS spreadsheet
V3 PDF Format.pdf PDF
Transmittal E-Mail.doc DOC document
EMC Decision Flow Chart.pdf PDF
EGWW_Workshop_Project History.pdf PDF
09_05_29_Synthesis HPBW.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2009 List

2006 - 2009 SCOPE CHANGES AND COST SUMMARY
(Revised for CMc, V1)
Area/ Item2006 Scope2009 ScopeCost ImpactRef Docs
Building Status during ConstructionOccupied

Constuction duration 54 months Escalation included Unoccupied Construction duration 30 months No escalation Do not Price.

Use assumptions of 2009 Scope.

Demo Work - FacadesPhased work in occupied buildingUnoccupied buildingP-01, P-02, P-03
Parking
(2 levels with loading dock and entry/exit ramps)Garage entry security upgrades.
Removal of abandoned mech/plumbing equip.Paint ceiling and walls

New striping, arrows, etc.

Exhaust system with CO² control system Lighting, Electric Data systems (if reqd) Security (assume new cameras only)

Fire Protection, Fire AlarmP-04, P-02, P-05, P-06, P-11, P-12ROWS IN GREEN ARE ITEMS FOR CMc TO PRICE
New Ramp Entry to Parking at NW CornerNot consideredUnder consideration
Basement LevelMech. room upgrades.

Replace sump pump and repair pit.

Fire storage and pump Replace asbestos core doors. Reprogram floor: replace ceilings, walls, doors, paint, flooring, etc. primarily for storage use.

HVAC Air distribution system Lighting, Electric Data systems Security Fire Protection, Fire Alarm Ground Level New finishes in common areas New security screening station New trash/recycling center New lease space Upgrades to café and servery Closed Madison entry Reprogram entire floor - cafeteria, conference rooms, fitness center, common areas.

HVAC Air distribution system Lighting, Electric Data systems Security Fire Protection, Fire Alarm 1st Level (Plaza Interior) New pavilion and security New finishes New double stair to Ground Level Updated pavilion design with green roof Reprogram floor Remove and replace plaster ceiling and pre-cast panels.

HVAC Air distribution system Lighting, Electric Data systems Security Fire Protection, Fire Alarm 1st Level (Plaza Exterior) Removal of all brick paving and cladding.

New paving, circulation, bollards, sidewalks, curbs, etc.

New landscaping and water feature.

New street trees.Convert planters to flow through planters.
2-17 Floors and CoresUpgrade finishes throughout.

Add common galley to core.

Enlarge floor plate at perimeter. Reduce size of shafts and consolidate core to create additional lease space.

New shaft walls Penthouses Louvers over existing pre-cast panels on exterior Remove pre-cast and add curtainwall with louvers (20%).

Study option to extend passenger elevators to level and tenant fitout.

Roof Modify existing exterior maintenance equipment New roof mounted equipment

New TPO roof with ballast and pavers New exterior maintenance equipment New space frame second roof with PV and solar thermal

North FaçadeBlast resistant window wallBlast resistant curtain wall with light reflectors
East FaçadeBlast resistant window wallBlast resistant curtain wall with light reflectors and shading devices
South FaçadeBlast resistant double window wall with operable shading devices.Blast resistant curtain wall with light reflectors and shading devices
West FaçadeBlast resistant window wall with vegetated fins for shadingBlast resistant curtain wall with horizontal light reflectors and shading devices and modified vegetated fins for shading.
Seismic UpgradeBased on FEMA 310 and 356Based on ASCE 41-06 requirementsP-07
Exit StairsEnlarge landings at office floors.Replace guardrails and handrails with code compliant rails.
Heating and Cooling Floors 2-17Upgrade HVAC system with VAV system
New boilers and cooling towersRadiant panel system with DOASP-05, P-08, P-09
Ground Water Heat Pump SystemNot consideredUnder investigation
Plumbing / Greywater SystemRepair plumbing
Upgrade restrooms to ADA standards.Replace plumbing with water conserving fixtures and greywater system for irrigation.
Storm WaterStorage for fin irrigationMaximize collection, storage, and useage for toilet flushing.
Electrical (2-17)Add new risers and distribution to existing

New generator New switchgear New risers and distribution.

All new equipment

Move transformers to basementNot consideredUnder investigation
Lighting (2-17)New lighting and controls.Improved energy efficiency lighting and controls.P-08, P-10, P-11, P-12
ElevatorsReplace controls on #9 & 10.
New cab finishes, door operators and skins, and markers on all.Modernize #1-8, 10

Regenerative Destination dispatch for #1-8 Eliminate shuttle elevator #9

Extend 2 passenger elevators to Basement and PenthouseP-13, P-14
Fire Protection (2-17)P-4, P-6, P-14
Fire Alarm (2-17)Modify existing systemNew state-of-the-art systemP-4, P-6, P-14
Security (2-17)Modify existing systemNew state-of-the-art system
Data Systems (2-17)New data closets and distribution.
PBX changeoutplaceholder
Blast ProtectionIncluded in window wall designIncluded in curtainwall design
Core and Shell Enhancements above design standards to meet HPGBplaceholder
LEED Rating TargetSilver Required, Gold TargetGold Required, Platinum Target
Metering and Verification (M+V)To meet LEED and GSA requirements
TOTAL COST IMPACTS$ - 0
REVISED 2009 CORE AND SHELL COST$ - 0
TENANT COSTS
TI Buildout06 cost. Not updated.
New Building Area TI CostsTenant areas excluded in 06 scope - B, G, 1st, and Penthouse
TI costs above program work
REVISED 2009 PROJECT COST$ - 0

&"Arial Narrow,Bold"&8EDITH GREEN WENDELL WYATT FEDERAL BUILDING MODERNIZATION &"Arial Narrow,Bold"&8 2006 - 2009 SCOPE CHANGES

29 SEPTEMBER 2009 V1.2