Transmittal E-Mail.doc

DOC document 28 KB Posted

Attached to
Recovery: Edith Green/Wendell Wyatt Federal Building Modernization
Solicitation number
GS-10P-09-LT-C-0052
Issued by

About this file

Transmittal E-Mail to Contractors who Received an Early Exchange Meeting

View the file

Other files

File Type Posted
Award_GS-10P-09-LT-C-0052.pdf PDF
Pavement_Markings_-_FedBizOpps_Form.pdf PDF
ER__14.01_-_Kitchen_Equipment.pdf PDF
Signage Bid Package.pdf PDF
ER 10.01 - Earthwork and Utilities.pdf PDF
ER 11.01 - Exterior Building Cleaning.pdf PDF
ER 9 - Roller Shades and Final Cleaning.pdf PDF
ER 8.01 - Cistern Waterproofing - FedBizOpps Form.pdf PDF
Affirmative Action Fact Sheet 1 Final 11-30-11.pdf PDF
EGWW FS Small Business 12-1-11 V4 CONSOLIDATED.pdf PDF
EGWW SBA calendar Oct 11 Update for FedBizOps.pdf PDF
Consolidated Directory October Update.pdf PDF
ER 7.01 - Plaza Level Waterproofing - FedBizOpps Form.pdf PDF
ER 6.01 - Arch Wood Casework - FedBizOpps Form.pdf PDF
Community Construction Training Fund RFP - FedBizOpps Form.docx DOCX document
Community Outreach Meeting 1.pdf PDF
Bid Phase 3 - Sub Fail FedBizOpps.pdf PDF
ER 4 - Early Release Packages - 10 05 10.pdf PDF
Bid Phase 2 - Sub Fair FedBizOpps rev 3 07.28.10.pdf PDF
Strategy for Outreach.pdf PDF
ER 002 - FedBizOpps Form.docx DOCX document
EGWW PS02 PLA Executed.pdf PDF
EGWW Final Executed PLA4.28.10.pdf PDF
BP 001 - Well Drilling.docx DOCX document
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Amendment 007.pdf PDF
Amendment 6 Attachment GMP Pricing Assumptions.pdf PDF
Amendment 6.pdf PDF
Amendment 005.pdf PDF
Tech Docs for CMc Pricing.docx DOCX document
Attachment to Amendment 005 Block 14 10-2-09 V4.doc DOC document
Staffing and Summary Worksheet 10-1-09 V2.xls XLS spreadsheet
06-09 Scope Changes and Cost Summary 10-01-09 V1.xlsx XLSX spreadsheet
PIB 09-02.pdf PDF
Amendment 004.pdf PDF
Sections 100 600 700 Updated 8-17-09.doc DOC document
Amendment 003.pdf PDF
Pre-Proposal Conference Minutes 7-29-09.pdf PDF
Attachment 2 Technical Documents.pdf PDF
Amendment 002.pdf PDF
Amendment 001.pdf PDF
06 RFP —
Past Performance Evaluation - Owner V3 7-9-09.xls XLS spreadsheet
Market Research Summary 6-25-09 V2 FINAL.doc DOC document
Contractor POCs EGWW 6-27-09 V4.xls XLS spreadsheet
V3 PDF Format.pdf PDF
EMC Decision Flow Chart.pdf PDF
EGWW_Workshop_Project History.pdf PDF
09_05_29_Synthesis HPBW.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Transmittal E-Mail to Contractors who Received an Early Exchange Meeting:

I'd like to thank-you again for meeting with us and discussing our Edith Green-Wendell Wyatt modernization project. I've attached a summary of our market research and discussions with our industry partners, along with updated versions of the handouts provided. I've also included a spreadsheet of the POC data I was provided. This summary will be posted to the Federal Business Opportunities (FedBizOpps) Web Site.

I'd appreciate your review and any comments you might have. I have another very important request at the end of this message.

We haven't initiated round 2 early exchanges for the following reasons:

1. We wanted to determine the potential impact to the project scope that the High Performance Building Workshop discussions may have had.

STATUS: We believe there will be new energy conservation measures that we can include in the project scope, but that those measures won't materially impact competition (add unique or proprietary capabilities)

2. We wanted to confirm that vacating the building, during construction, was possible.

STATUS: Vacating the building is possible and can be funded. Lease space is available.

3. We wanted feedback from our tenants with respect to vacating the building as well as capturing their programming and our ability to design build-outs.

STATUS: This is ongoing, but feedback to date is very encouraging. The design, and pricing, of TI build-outs will be accomplished after tenants vacate the building. The Construction Manager as Constructor (CMc) delivery method provides sufficient flexibility to manage this complexity.

4. We wanted to ensure our strategy was consistent with ARRA rule clarifications.

STATUS: Our preferred strategy has not been affected by any ARRA rule clarification issued or being vetted in draft.

At this point, operating under a "vacate the building strategy" and given the feedback industry provided during first round market research we will not be conducting a second round. As we have been, and will continue to do so up to release of the solicitation, we will accommodate meeting requests from industry to the greatest extent possible.

Given input provided, we believe a CMc delivery method, with a Guaranteed Maximum Price (GMP) contract type, is most appropriate for this project. Given ARRA obligation constraints we will solicit the CMc with up to, but not more than 5 first tier subcontractors. We will revise past performance questionnaires to limit the size (will attempt to get it to a 1 page document). We will eliminate inquiries to AE's and will eliminate past performance questionnaires for key personnel. Given we will be soliciting a CMc team, a GMP proposal, after a voluntary short-list, will be required. We believe the GMP will be meaningful, since we will have a more fully articulated design (about 100% DD's). It will also help us set a reasonable baseline for negotiating the construction option after the design phase. An AE option, to be considered during the design phase, will also be included.

We will attempt to post a draft copy of the solicitation document (on FedBizOpps) for comment, but the comment period will be short (1-3 days).

As a post script, I have a very important request to ask pertaining to federal cost accounting standards (CAS). If you would please respond to the following "survey":

1. Are you familiar with (federal) CAS requirements?

2. Does your firm have a written accounting description disclosure THAT HAS BEEN APPROVED by a government entity:

3. If you have an approved disclosure statement, when was it approved? _____________ What agency/individual issued the approval? __________________

4. Would you participate in the solicitation if CAS compliance was required?

5. Could you obtain CAS compliance before contract award (assume December 2009)?

Attachments:

Summary of market research/early exchanges, with attachments cited