Attachment to Amendment 005 Block 14 10-2-09 V4.doc

DOC document 35 KB Posted

Attached to
Recovery: Edith Green/Wendell Wyatt Federal Building Modernization
Solicitation number
GS-10P-09-LT-C-0052
Issued by

About this file

Attachment to Amendment 005 Block 14

View the file

Other files

File Type Posted
Award_GS-10P-09-LT-C-0052.pdf PDF
Pavement_Markings_-_FedBizOpps_Form.pdf PDF
ER__14.01_-_Kitchen_Equipment.pdf PDF
Signage Bid Package.pdf PDF
ER 10.01 - Earthwork and Utilities.pdf PDF
ER 11.01 - Exterior Building Cleaning.pdf PDF
ER 9 - Roller Shades and Final Cleaning.pdf PDF
ER 8.01 - Cistern Waterproofing - FedBizOpps Form.pdf PDF
Affirmative Action Fact Sheet 1 Final 11-30-11.pdf PDF
EGWW FS Small Business 12-1-11 V4 CONSOLIDATED.pdf PDF
EGWW SBA calendar Oct 11 Update for FedBizOps.pdf PDF
Consolidated Directory October Update.pdf PDF
ER 7.01 - Plaza Level Waterproofing - FedBizOpps Form.pdf PDF
ER 6.01 - Arch Wood Casework - FedBizOpps Form.pdf PDF
Community Construction Training Fund RFP - FedBizOpps Form.docx DOCX document
Community Outreach Meeting 1.pdf PDF
Bid Phase 3 - Sub Fail FedBizOpps.pdf PDF
ER 4 - Early Release Packages - 10 05 10.pdf PDF
Bid Phase 2 - Sub Fair FedBizOpps rev 3 07.28.10.pdf PDF
Strategy for Outreach.pdf PDF
ER 002 - FedBizOpps Form.docx DOCX document
EGWW PS02 PLA Executed.pdf PDF
EGWW Final Executed PLA4.28.10.pdf PDF
BP 001 - Well Drilling.docx DOCX document
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Amendment 007.pdf PDF
Amendment 6 Attachment GMP Pricing Assumptions.pdf PDF
Amendment 6.pdf PDF
Amendment 005.pdf PDF
Tech Docs for CMc Pricing.docx DOCX document
Staffing and Summary Worksheet 10-1-09 V2.xls XLS spreadsheet
06-09 Scope Changes and Cost Summary 10-01-09 V1.xlsx XLSX spreadsheet
PIB 09-02.pdf PDF
Amendment 004.pdf PDF
Sections 100 600 700 Updated 8-17-09.doc DOC document
Amendment 003.pdf PDF
Pre-Proposal Conference Minutes 7-29-09.pdf PDF
Attachment 2 Technical Documents.pdf PDF
Amendment 002.pdf PDF
Amendment 001.pdf PDF
06 RFP —
Past Performance Evaluation - Owner V3 7-9-09.xls XLS spreadsheet
Market Research Summary 6-25-09 V2 FINAL.doc DOC document
Contractor POCs EGWW 6-27-09 V4.xls XLS spreadsheet
V3 PDF Format.pdf PDF
Transmittal E-Mail.doc DOC document
EMC Decision Flow Chart.pdf PDF
EGWW_Workshop_Project History.pdf PDF
09_05_29_Synthesis HPBW.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment to Amendment 005, Block 14 (Solicitation GS-10P-09-LT-C-0052) This amendment provides instructions for the Design Phase price and Guaranteed Maximum Price (GMP). It identifies the technical documents we are providing.

The GMP submission is used to evaluate understanding of the project scope. The GMP is not binding. We will negotiate the GMP during the design phase. The GMP must be as realistic as possible. We encourage estimates for any reasonable risk being INCLUDED in the GMP.

As stated during the interviews Energy Conservation Measures surfaced during the High Performing Green Building workshop were modeled and analyzed. We also revised scope that was not included in the '06 design.

GSA intends to schedule a telecon with each offerors to discuss and clarify all aspects of the Phase 2, GMP Proposal. This will be scheduled at a mutually agreed upon time after the CMc has had an opportunity to review the documents. Any substantial clarifications identified will be posted by amendment.

Attached Documents (titles in Capital Bold):

Technical Documents for CMc Pricing This document lists all technical documents incorporated into this amendment. They are identified as either Orientation (to provide a more full understanding of the project) or GMP Pricing (to be used to price elements of the GMP). A disc containing the documents will be hand delivered October 6, 2009.

Staffing and Summary Worksheet

This spreadsheet is mainly provided to assist with pricing the project staffing. Instructions for use are provided later in this document.

06-09 Scope Changes and Cost Summary This spreadsheet is provided to identify scope changes between the 2006 and 2009 projects and to summarize pricing of the GMP. Items in green are for the CMc to price. Items in white are currently blank, but GSA will provide pricing assumptions (dollar value to be used in the GMP) via later amendment.

Instructions for GMP pricing submissions:

1. Assume construction duration (notice-to-proceed to substantial completion) of 30 months. Assume a NTP of September 2010.

2. Use any software application or formats you normally use, with the exception of staffing cost. For staffing please use the templates provided (Staffing and Summary Worksheet) or a similar form.

3. The GMP should clearly identify the cost by CSI trade.

4. Assumptions and estimating details should be provided when used. The more detail the better.

5. General conditions should reflect historical costs and commercial practice.

6. Staffing cost, for the CMc, and mechanical, electrical first tier subcontractor, must match the organizations and staffing levels proposed or clarified during the oral interview.

7. Where we’ve provided pricing assumptions, you do not need to estimate that work. Simply use the dollar amounts provided.

8. Include a construction contingency of 5% in the GMP proposal.

Instructions for Design Phase pricing submissions:

1. Assume the design phase will be 9 months, December 2009 to August 2010.

2. Propose a fixed monthly price.

3. Staffing cost, for the CMc, and mechanical, electrical first tier subcontractor, must match the organizations and staffing levels proposed or clarified during the oral interview.

DESIGN PHASE SCOPE ASSUMPTIONS

a. Work with the owner and AE to develop project team processes for:

1. Project Estimating;

2. Document control;

3. Construction Document development (extent of drawings needed and process for development (example: GSA process (50%, 100%, 100% revised); commercial method/process; other).

4. Constructability reviews;

5. Schedule development;

6. Value engineering;

7. Product research;

b. Participate in team meetings to status workload and develop shared processes.

Instructions for Design and Construction Phase Staffing Costs and GMP Summary:

1. As stated earlier, staffing cost, for the CMc, mechanical, and the electrical first tier subcontractor, must match the organizations and staffing levels proposed or clarified during the oral interview for both the design phase and construction phase. Staffing is for front office and corporate office support, not field labor.

2. Staffing costs for both design and construction phases must also be summarized using the templates provided (Staffing and Summary Worksheet) or in a similar form. Summaries are needed to create apple-to-apple comparison.

3. Design phase costs and GMP’s should be summarized using the template provided (Staffing and Summary Worksheet) or in a similar form.