The ECM Decision Flow Chart is being provided FYI to communicate the potential scope of the project and the decisions currently being evaluated.

View the file

Other files

File Type Posted
Award_GS-10P-09-LT-C-0052.pdf PDF
Pavement_Markings_-_FedBizOpps_Form.pdf PDF
ER__14.01_-_Kitchen_Equipment.pdf PDF
Signage Bid Package.pdf PDF
ER 10.01 - Earthwork and Utilities.pdf PDF
ER 11.01 - Exterior Building Cleaning.pdf PDF
ER 9 - Roller Shades and Final Cleaning.pdf PDF
ER 8.01 - Cistern Waterproofing - FedBizOpps Form.pdf PDF
Affirmative Action Fact Sheet 1 Final 11-30-11.pdf PDF
EGWW FS Small Business 12-1-11 V4 CONSOLIDATED.pdf PDF
EGWW SBA calendar Oct 11 Update for FedBizOps.pdf PDF
Consolidated Directory October Update.pdf PDF
ER 7.01 - Plaza Level Waterproofing - FedBizOpps Form.pdf PDF
ER 6.01 - Arch Wood Casework - FedBizOpps Form.pdf PDF
Community Construction Training Fund RFP - FedBizOpps Form.docx DOCX document
Community Outreach Meeting 1.pdf PDF
Bid Phase 3 - Sub Fail FedBizOpps.pdf PDF
ER 4 - Early Release Packages - 10 05 10.pdf PDF
Bid Phase 2 - Sub Fair FedBizOpps rev 3 07.28.10.pdf PDF
Strategy for Outreach.pdf PDF
ER 002 - FedBizOpps Form.docx DOCX document
EGWW PS02 PLA Executed.pdf PDF
EGWW Final Executed PLA4.28.10.pdf PDF
BP 001 - Well Drilling.docx DOCX document
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Amendment 007.pdf PDF
Amendment 6 Attachment GMP Pricing Assumptions.pdf PDF
Amendment 6.pdf PDF
Amendment 005.pdf PDF
Tech Docs for CMc Pricing.docx DOCX document
Attachment to Amendment 005 Block 14 10-2-09 V4.doc DOC document
Staffing and Summary Worksheet 10-1-09 V2.xls XLS spreadsheet
06-09 Scope Changes and Cost Summary 10-01-09 V1.xlsx XLSX spreadsheet
PIB 09-02.pdf PDF
Amendment 004.pdf PDF
Sections 100 600 700 Updated 8-17-09.doc DOC document
Amendment 003.pdf PDF
Pre-Proposal Conference Minutes 7-29-09.pdf PDF
Attachment 2 Technical Documents.pdf PDF
Amendment 002.pdf PDF
Amendment 001.pdf PDF
06 RFP —
Past Performance Evaluation - Owner V3 7-9-09.xls XLS spreadsheet
Market Research Summary 6-25-09 V2 FINAL.doc DOC document
Contractor POCs EGWW 6-27-09 V4.xls XLS spreadsheet
V3 PDF Format.pdf PDF
Transmittal E-Mail.doc DOC document
EGWW_Workshop_Project History.pdf PDF
09_05_29_Synthesis HPBW.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EGWW ECM Decision Flow Chart 8 June 2009

Optimize Wall and Glazing

- Specific to each Facade - N, E, S, W

- Establish: U-value, % of glazing, solar heat gain coefficient (SHGC), visible light transmittance (VLT)

Envelope Measures

Exterior Shading

- Specific to each Facade - E, S, W

- Operable vs. Fixed

- Validate Double Wall

- Validate Vegetated Fins

Optimize Daylighting Specific to each Facade - N, E, S, W

Select Performance Requirements for each Facade

Internal Loads

Lighting

- Advanced lighting controls, dimming, occ sensors, individual control

- Luminarie, lamp and ballast systems

Select lighting Select lighting controls

Establish Internal Loads

Roof Design

- Cool or Vegetated Roof - R-50 Min.

- Coordinate with roof equipment and solar thermal collection

Establish metrics for:

- Number of occupants

- Plug loads

- Equipment loads

- Hours of opperation

Establish Tenant Standards In Leasing Agreements

- Plug loads

- Equipment loads

- Monitor and control loads

Natural Ventilation

- Operable windows, louvers or vents

- Central chimney for heat exchange

Hydronic Heating and Cooling

- Chilled Beams

- Radiant Panels

Dedicated Outdoor Air Supply (DOAS)

Mechanical Systems - Distribution

Air System for Heating and Cooling Update 2006 Design with new metrics developed through envelop and internal load studies

Select Mechanical System Distribution

Options for distribution of heating and cooling

- Distributed fan coils

- Outside air from facade

- Displacement vent.

Options for sourcing and tempering outside air (DOAS)

- Specific to each Facade - N, E, S, W

- Evaporative cooling air handlers

- Heat recovery w/ exhaust air

System Options

- Ground water heat pumps

- Distributed heat pumps

- Chiller / Boiler / Cooling Tower:

Optimize pumps, water temp, operation

Mechanical Systems - Production of Heating and Cooling

Other Strategies

- Heat recovery

- Air to water heat pumps

Select Mechanical System Production

Options

- Adsorption chillers using waste heat

- Outdoor water feature used for evaporative or convective water cooling

- Ice storage systems

Renewable Options

- Photovoltaic solar collection to reduce overall electrical load

On-Site Renewable Energy Generation

Determine extent of PV

Domestic Hot Water System

- Point-of-use water heaters

- Tempered water w/ heat recovery

- Solar thermal

- Ground water heat pump

Alternate Systems

- Solar Thermal for building water

- Micro-hydro turbines in roof drains

Primary ECM's Development ECM's

Baseline ECM's

ECM Measures Recommended for Recovery Design Phase

Final Energy Model LCCA Test (40 year)

Integrate with cost estimate

Enhanced Recovery Design for Project Team GSA - CMc - A/E

Primary ECM's

Development ECM's

Baseline ECM's

Primary Energy Conservation Measures to be evaluated for incorporation into final recovery design. Design work to precede selection of CMc.

Development Energy Conservation Measures to be evaluated through the course of the design process.

Baseline Energy Conservation Measures to be evaluated for incorporation into final recovery design as required by the Office of the Chief Architect (OCA)