Edith Green - Wendell Wyatt Federal Building Modernization - Portland, OR
Calendar 11/29/10 Small Business Subcontractor technical work session @ MCIP @ 1pm – 3pm 11/30/10 Small Business Subcontractor technical work session @ MCIP @ 11am – 1pm 12/6/10 Small Business Subcontractor technical work session @ MCIP @ 1pm – 3pm All technical work sessions are located at MCIP: 2802 NE MLK Blvd., Suite K, Portland 12/9/10 Bid Phase 3 bids due @ 2pm
Small Business Subcontracting Plan The project includes a Small Business Subcontracting Plan. The Small Business Subcontract Plan includes Subcon-tracting goals for Small Business, Small Disadvantaged Business (SDB), Women-owned Small Business, HUB- Zone Small Business, Service-Disabled Veteran-owned Small Business, and Veteran-owned Small Business.
Bid Documents:
Bid documents are located online at www.bxwa.com under Howard S. Wright Constructors Federal proj-ects page. Please register with BXWA as an interested bidder to receive future updates, addendums, and clarifications for this project. Bid due date: 12/9/10 @ 2pm.
Bid Documents particulars will follow with bid solicitation notifications. Pre-registration for SBU clearance is recommended (see below).
Project Documents are Sensitive but Unclassified (SBU) information and the Property of the United States Gov-ernment. Disclosure, copying, dissemination, or distribution of controlled unclassified information is prohibited.
Documents must be properly destroyed when no longer needed.
Subsequent to the release dates, documents will be available on the Builders Exchange of Washington's website (www.bxwa.com) under Howard S Wright Federal Projects posting area. Prior to receiving access to the EGWW project documents on BXWA, all bidders will be required to register with the Central Contractor Registration (CCR). Once registered, submit the “access information” sheet located on BXWA to egww@hswc.com to receive the login and password to view the bid documents.
Edith Green - Wendell Wyatt Federal Building Modernization - Portland, OR
BID PHASE #3
Division
Division 5
Division 5
Division 6
Division 7
Division 7
Division 8, 9, 10
Division 31, 32, 33
Mechanical
Electrical
Person of Contact
Ryan McGrew:
McGrewR@hswc.com
Bid Package 3 Summary
• F&I Monumental Stair Package
• Metal fabrication
• Rough Carpentry
• Waterproofing
• Traffic Coatings
• Sheet Metal Flashing and Trim
• Thermal Insulation
• Intumescent Mastic Fireproofing
• GWB
• Stucco
• Tile
• F&I Doors, Frames, Hardware
• Overhead Coiling Doors
• Floor Coverings
• Access Flooring
• Painting
• Earthwork & Utilities
• Landscaping and Irrigation
• Supply and Install Fuel Oil System
• Supply and Install Solar World Heating System
• Pipe Pre-fabrication
• Supply and Install Site Power and Lighting
• Re-bid Supply and Install Garage and Basement Lighting
Scott Passman:
PassmanS@hswc.com
Scott Passman:
PassmanS@hswc.com
Scott Passman:
PassmanS@hswc.com
Scott Passman:
PassmanS@hswc.com
Josh English:
EnglishJ@hswc.com
Ryan McGrew:
McGrewR@hswc.com
Damon Cannon:
DamonC@McKinstry.com
Curt Sander:
CSander@dyna-portland.com
Edith Green – Wendell Wyatt
Bid Phase Schedule – Bid Phase #3 11/22/10 (vers 3.5)
Bid Phase
Division Bid Pkg
Bid Pkg Description Person of Contact
(POC)
Bid Phase #3 - Documents Available 11/11/10 BP #3 Div 5 BP-3.01 Metal Fabrications passmans@hswc.com BP #3 Div 5 BP-3.02 Monumental Steel Stair Package – Supply & Install mcgrewr@hswc.com
BP #3 Div 6 BP-3.03 Rough Carpentry passmans@hswc.com
BP #3 Div 7 BP-3.04 Plaza Waterproofing & Tank Liner – Best Value mcgrewr@hswc.com BP #3 Div 7 BP-3.05 Traffic Coatings – Parking Garage, Mechanical Rooms mcgrewr@hswc.com BP #3 Div 7 BP-3.06 Thermal Insulation (Foamed-in-Place) passmans@hswc.com BP #3 Div 7 BP-3.07 Sheet Metal Flashing and Trim mcgrewr@hswc.com BP #3 Div 7 BP-3.08 Intumescent Mastic Fireproofing passmans@hswc.com
BP #3 Div 8 BP-3.09 Doors & Frames & Hardware – Supply passmans@hswc.com BP #3 Div 8 BP-3.10 Door & Hardware – Install passmans@hswc.com BP #3 Div 8 BP-3.11 Overhead Coiling Doors – Supply & Install passmans@hswc.com
BP #3 Div 9 BP-3.12 GWB Pkg “B” - Level B1 & Level 00 passmans@hswc.com BP #3 DDiivv 99 BP-3.13 Portland Cement Plaster passmans@hswc.com BP #3 Div 9 BP-3.14 Tile Pkg “A” - Level B1 & Level 00 & Level 01 passmans@hswc.com BP #3 DDiivv 99 BP-3.15 Tile Pkg “B” – Level 02 through Level 17 passmans@hswc.com BP #3 DDiivv 99 BP-3.16 Linear Wood Ceiling – Level 01 passmans@hswc.com BP #3 DDiivv 99 BP-3.17 Floor Coverings Pkg “A” - Level B1 & Level 00 & Level 01 passmans@hswc.com BP #3 DDiivv 99 BP-3.18 Floor Coverings Pkg “B” – Level 02 through Level 18 passmans@hswc.com BP #3 DDiivv 99 BP-3.19 Terrazzo Flooring passmans@hswc.com BP #3 DDiivv 99 BP-3.20 Access Flooring passmans@hswc.com BP #3 DDiivv 99 BP-3.21 Painting Pkg “A” - Parking Garage at Levels B1 & Level 00 passmans@hswc.com BP #3 DDiivv 99 BP-3.22 Painting Pkg “B” - Inside Stair Shafts #1 & #2, & Steel Stairs passmans@hswc.com
BP #3 Div 10 BP-3.23 Metal Toilet Compartments – Supply & Install passmans@hswc.com BP #3 Div 10 BP-3.24 Toilet Accessories – Supply & Install passmans@hswc.com BP #3 Div 10 BP-3.25 Fire Protection Specialties - Supply passmans@hswc.com
BP #3 Div 22 Reference McKinstry Bid Pkg schedule damonc@mckinstry.com
BP #3 Div 23 Reference McKinstry Bid Pkg schedule damonc@mckinstry.com
BP #3 Div 26 Reference Dynalectric Bid Pkg schedule csander@dyna-portland.com
BP #3 Div 31 BP-3.26 Earthwork and Utilities englishj@hswc.com
BP #3 Div 32 BP-3.27 Landscape & Irrigation – Best Value englishj@hswc.com
Bid Phas
BP #3
BP #3
BP #3
BP #3
BP #3
BP #3
d se
Division
3 Div 22 3 Div 22
3 Div 22, 23 3 Div 22, 23
3 Div 26 3 Div 26
Bid Pkg
BBiidd
BP-3.30 F
BP-3.31 S
BP-3.32 P
BP-3.33 P
BBiidd BP-3.34 Si
BP-3.35 G
B
PPhhaassee ##33 --uel Oil System - S olar Water Heat
Plumbing / HVAC Plumbing / HVAC
PPhhaassee ##33 --ite Power and Li
Garage and Base
Edith Gree id Phase Sch
11/2
Bid Pkg Desc
-- DDooccuummeennt Supply & Install ting System - Sup
C Piping Pre-Fabr C Pumps - Supply
-- DDooccuummeennt ghting - Supply & ement Lighting -en – Wendell hedule – Bid 22/10 (vers 3.5) cription ttss AAvvaaiillaabbllee pply & Install rication y ttss AAvvaaiillaabbllee & Install
- Supply & Install l Wyatt Phase #3 ee 1111//1111//1100 da da ee 1111//1111//1100 csa ccssaa
Person of C
(POC
anielm@mckinstry anielm@mckinstry anielm@mckinstry anielm@mckinstry ander@dyna-p aannddeerr@@ddyynnaa--pp
MEC
Contact C) ry.com ry.com ry.com ry.com
E portland.com ppoorrttllaanndd..ccoomm
CHANICAL
ELECTRICAL
L
L