NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III - POOL ONE (NMACC III – Pool 1): BASE SEATTLE SLIP 36 COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION AND LIABILITY ACT (CERCLA) CLEAN UP AND WATERFRONT RECAPITALIZATION PHASE 1A
Closed Solicitation Posted
- Solicitation number
- 20312361
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Seattle, Washington 98134, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Coast Guard is soliciting proposals for a comprehensive environmental cleanup and waterfront recapitalization project at Base Seattle Slip 36 to support the homeporting of new Polar Security Cutters. This Design-Bid-Build project involves CERCLA remediation work including demolition of Building 3 and Pier 36, upgrading fendering systems and utilities, replacing and reconfiguring floating docks and boathouse, and dredging approximately 65,000 cubic yards of contaminated sediment. Only contractors who are NMACC III Pool 1 awardees are eligible to participate in this restricted competition. Evaluation will focus on environmental compliance factors including CERCLA requirements and construction permits, schedule and phasing capabilities, and price, with price being weighted more heavily than non-price factors. Key deadlines include non-price proposals due May 13, 2025 at 4:00 PM PST and price proposals due May 16, 2025 at 4:00 PM PST, with an anticipated contract award date of August 30, 2025.
This solicitation does not include any set-aside designations and represents a full and open competition among the limited pool of NMACC III Pool 1 contractors. The project has an estimated budget of approximately $190 million with a performance period of 1,200 calendar days and liquidated damages of $11,056.15 per day for delays. The work includes extensive environmental remediation activities such as dredging, in-situ treatment cover material installation, residuals management, and disposal of contaminated sediment, along with significant infrastructure improvements. Performance will take place at the USCG Base Seattle facility in Seattle, Washington, with specific work focused on the Slip 36 area within the East Waterway Operable Unit of the Harbor Island Superfund Site. The contractor will be subject to Defense Production Act priority rating requirements (DO-N5) for electrical shore tie materials with delivery required by October 1, 2028.
Notice text
***** THIS IS AN NMACC III POOL 1 PROJECT: ONLY NMACC III POOL 1 AWARDEES ARE ELIGIBLE TO PARTICIPATE ****
This Design-Bid Build projects requires a CERCLA clean-up effort and waterfront recapitalization at Base Seattle to support the homeporting of new USCG Polar Security Cutters. This effort is Phase 1A. Phase 1A includes, but is not limited to, the demolition of an existing building and pier (Building 3 and Pier 36, respectively), upgrading the fendering system and existing
utilities, replacing and reconfiguring floating docks and boathouse, as well as dredging and disposing of contaminated sediment at Slip 36.
Files
Show all 29
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USCG Station at Cape Disappointment | ENDIST Portland | No set-aside | |
| FY26 Willapa Harbor Maintenance Dredging | ENDIST Seattle | No set-aside | |
| CGC-henry-blake-drydock-repairs | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity