About this file

This document is a detailed flowchart outlining procedures for inadvertent archaeological and human remains discoveries during the USCG Base Seattle environmental cleanup and waterfront recapitalization project. The flowchart provides comprehensive step-by-step protocols for project personnel in two specific scenarios: archaeological resource discovery and human remains discovery. Key procedural requirements include immediately stopping work, establishing a 100-foot buffer zone, notifying designated authorities (USCG Point of Contact, archaeological monitor, King County Medical Examiner), maintaining confidentiality, and avoiding disturbance of discovered materials. Work resumption is contingent upon formal evaluation by cultural resources specialists, consultation with State Historic Preservation Office (SHPO), tribes, and obtaining written authorization from USCG, ensuring compliance with federal and state preservation laws.

View the file

Other files

File Type Posted
Amendment 09_Drawing CN101-CN102 Markups_Revised Dredge Placement Areas.pdf PDF
Amendment 09_General Wage Decision WA20250125 14Mar2025.pdf PDF
Amendment 09 5.2.25.pdf PDF
Amendment 09_Drawing AB200 Markup_for PPI 110.pdf PDF
Amendment 09_Debris Survey Technical Memo_PPI 197.pdf PDF
Amendment 10_5.6.25.pdf PDF
70Z05025R43000001_Amendment 08 4.25.25.pdf PDF
70Z05025R43000001_Amendment 07 4.17.25.pdf PDF
70Z05025R43000001_06_ 06 4.14.25.pdf PDF
NMACC Site Visit_27Feb2025 (Final).pdf PDF
FPAS Rated Order Letter to Contractors_Amendment 04.pdf PDF
Amendment 03FPAS-SILC-NMACC III Electrical Equipment 2025_03_11_sign.pdf PDF
Amendment 03Base Seattle Boat Haulout - As Builts.pdf PDF
2025.02_BA_USCG_BaseSeattle.pdf PDF
SF 30 4.2.2025 Amendment 04.pdf PDF
Continuation Sheets_Amendment 4.pdf PDF
Amendment 03 Seattle PH1A Continuation Sheets 03.pdf PDF
Amendment 2 13Mar25.pdf PDF
TOA CERCLA Price Form Amendment 04.pdf PDF
Amendment 2 Continuation Pages.pdf PDF
Amendment 03SF 30 3.26.25.pdf PDF
FPAS-Electrical Equipment 2025_03_11_sign Amendment 04.pdf PDF
Amendment 2 Cover Page.pdf PDF
Amendment 05 4.4.25.pdf PDF
Base Seattle CERCLA PSC Homeport PH1A - Pre Proposal Site Visit - Attendees.pdf PDF
Amendment 01 3.5.25.pdf PDF
TOA CERCLA 2.27.25.pdf PDF
FAR Class Deviation 25-02 Waiver of PLA Requirements.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inadvertent Discovery of Archaeological Resources

Yes Monitor follows 5.2 procedures

Is an archaeological monitor on site?

The person who made the discovery will immediately:

• Pause work

• Notify the Monitor (if not already present)

• Protect the location with the help of the monitor

• Avoid touching or removing the materials or associated items

• Maintain Confidentiality

The archaeological monitor will:

• Assess the find to determine if it is over 50 years old, archaeological, and potentially significant

• Notify USCG Point of Contact

• Collect archaeological materials for testing and/or curation

• Notify DAHP and affected Tribes within 1 day of discovery

• Record monitoring activities on daily forms and in project report

The person who made the discovery will immediately:

• Stop work

• Notify USCG POC

• Establish a 100-foot buffer with flagging and barricading to protect the area

• Avoid touching or removing materials or associated items

• Maintain Confidentiality

USCG will immediately:

• Notify qualified archaeologist/ cultural resources specialist

• Ensure discovery area is secured

The Archaeologist/Cultural Resources Specialist will:

• Arrive onsite and assess the find to determine if it is over 50 years old, archaeological, and potentially significant

• Collect archaeological materials for testing and/or curation

• Notify DAHP and affected Tribes within 1 day of discovery

Work can proceed in the area when:

• Archaeological monitor evaluates and documents an isolate finding as non-significant

• If potentially significant, USCG, in consultation with DAHP, Tribes, and other consulting parties, determines when compliance with federal and state laws is complete and provides written authorization

• Construction outside the protected discovery location and buffer may continue during documentation and assessment.

• The archaeologist evaluates an isolate finding as non-significant

• USCG, in consultation with DAHP, Tribes, and other consulting parties, determines when compliance with state laws is complete and provides written consent to proceed

• Construction outside the protected buffer may continue during documentation and assessment.

Inadvertent Discovery of Human Remains

• Stop work and protect the location

• Avoid touching or removing the materials or associated items

• Establish a 100-foot buffer with flagging and barricading to protect the area

• Cover the remains with a clean, new tarp only

• Do not leave the area unsecured

• Notify USCG and archaeological monitor or cultural resources specialist (if present)

• Maintain Confidentiality

• Avoid discussing the discovery with the media (including social media postings) or any outside parties

• Do not photograph the remains.

• USCG, DAHP, Tribes, and consulting parties as appropriate, determine that compliance with state and federal laws is complete and provide written consent to proceed

• Construction outside the protected buffer may continue during documentation and assessment.

The person who made the discovery will immediately:

USCG will immediately:

• Ensure discovery area is secured

• Notify King County Medical

Examiner and King County Sherriff’s Office

• Notify qualified archaeologist/cultural resources specialist (if not already present)

• Maintain Confidentiality

The Cultural Resources Specialist will support USCG as needed with:

• Consultation with SHPO, Tribes, and other consulting parties

• Coordination with cemeteries and Tribes regarding future preservation, excavating and disposition per federal laws (e.g. NAGPRA)

• Requesting authorization to resume work within the buffer

Work can proceed in the area when:

Work can proceed in the area when:

No Follow 6.1 procedures

Slide 1

File details come from the government source that posted it. Updated .