About this file

This document is Standard Form 30 (Amendment of Solicitation/Modification of Contract) for the NMACC III Pool 1 Base Seattle Slip 36 project. The amendment extends the Non-Price Proposal deadline from March 31, 2025 at 4:00 PM (PST) to April 8, 2025 at 4:00 PM (PST) and includes three attachments: Base Seattle Boat Haulout As Builts, USCG Base Seattle IDP Flow Chart, and FPAS SILC NMACC III Electrical Equipment. The solicitation is for a Design-Bid-Build project involving CERCLA clean-up and waterfront recapitalization at Base Seattle to support homeporting of new USCG Polar Security Cutters, with Phase 1A specifically including demolition of Building 3 and Pier 36, upgrading fendering and utilities, replacing floating docks and boathouse, and dredging contaminated sediment at Slip 36. Only NMACC III Pool 1 awardees are eligible to participate in this solicitation.

View the file

Other files

File Type Posted
Amendment 09_Drawing CN101-CN102 Markups_Revised Dredge Placement Areas.pdf PDF
Amendment 09_General Wage Decision WA20250125 14Mar2025.pdf PDF
Amendment 09 5.2.25.pdf PDF
Amendment 09_Drawing AB200 Markup_for PPI 110.pdf PDF
Amendment 09_Debris Survey Technical Memo_PPI 197.pdf PDF
Amendment 10_5.6.25.pdf PDF
70Z05025R43000001_Amendment 08 4.25.25.pdf PDF
70Z05025R43000001_Amendment 07 4.17.25.pdf PDF
70Z05025R43000001_06_ 06 4.14.25.pdf PDF
NMACC Site Visit_27Feb2025 (Final).pdf PDF
FPAS Rated Order Letter to Contractors_Amendment 04.pdf PDF
Amendment 03FPAS-SILC-NMACC III Electrical Equipment 2025_03_11_sign.pdf PDF
Amendment 03Base Seattle Boat Haulout - As Builts.pdf PDF
2025.02_BA_USCG_BaseSeattle.pdf PDF
SF 30 4.2.2025 Amendment 04.pdf PDF
Continuation Sheets_Amendment 4.pdf PDF
Amendment 03 Seattle PH1A Continuation Sheets 03.pdf PDF
Amendment 2 13Mar25.pdf PDF
TOA CERCLA Price Form Amendment 04.pdf PDF
USCG Base Seattle IDP Flow Chart.pdf PDF
Amendment 2 Continuation Pages.pdf PDF
FPAS-Electrical Equipment 2025_03_11_sign Amendment 04.pdf PDF
Amendment 2 Cover Page.pdf PDF
Amendment 05 4.4.25.pdf PDF
Base Seattle CERCLA PSC Homeport PH1A - Pre Proposal Site Visit - Attendees.pdf PDF
Amendment 01 3.5.25.pdf PDF
TOA CERCLA 2.27.25.pdf PDF
FAR Class Deviation 25-02 Waiver of PLA Requirements.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

The purpose of this amendment is to include attachments (Base Seattle Boat Haulout As Builts, USCG Base Seattle IDP Flow Chart, FPAS SILC NMACC III Electrical Equipment 2025_03_11), and to extend the Non-Price Proposal deadline from March 31, 2025 tat 4:00 PM (PST) to April 8, 2025 at 4:00 PM (PST). All other terms and conditions remain the same. See the continuation page(s) for details.

USCG SILC FD&CC Det Seattle 915 2nd Ave, Room 2664 Seattle, WA 98174

70Z05025R43000001

20312361

1 12

03/26/2025

02/27/2025

File details come from the government source that posted it. Updated .