About this file

This document is an Amendment (Amendment 0008) to a solicitation for the U.S. Coast Guard Base Seattle project. The amendment includes multiple Pre-Proposal Inquiries (PPIs) addressing key timeline and administrative details. Significant changes include extending the PPI deadline from March 13, 2025, to March 21, 2025, and the Price Proposal deadline from April 14, 2025, to April 30, 2025. The Non-Price proposal deadline remains unchanged at March 31, 2025.

Key responses to contractor inquiries reveal that no proprietary products are required for the project, and there are no Controlled Unclassified Information (CUI) within the plans and specifications. The solicitation is for a comprehensive environmental response and waterfront recapitalization project at Base Seattle, specifically supporting the homeporting of new U.S. Coast Guard Polar Security Cutters, with Phase 1A involving demolition, utility upgrades, dock replacements, and contaminated sediment dredging.

View the file

Other files

File Type Posted
Amendment 09_Drawing CN101-CN102 Markups_Revised Dredge Placement Areas.pdf PDF
Amendment 09_General Wage Decision WA20250125 14Mar2025.pdf PDF
Amendment 09 5.2.25.pdf PDF
Amendment 09_Drawing AB200 Markup_for PPI 110.pdf PDF
Amendment 09_Debris Survey Technical Memo_PPI 197.pdf PDF
Amendment 10_5.6.25.pdf PDF
70Z05025R43000001_Amendment 08 4.25.25.pdf PDF
70Z05025R43000001_Amendment 07 4.17.25.pdf PDF
70Z05025R43000001_06_ 06 4.14.25.pdf PDF
NMACC Site Visit_27Feb2025 (Final).pdf PDF
FPAS Rated Order Letter to Contractors_Amendment 04.pdf PDF
Amendment 03FPAS-SILC-NMACC III Electrical Equipment 2025_03_11_sign.pdf PDF
Amendment 03Base Seattle Boat Haulout - As Builts.pdf PDF
2025.02_BA_USCG_BaseSeattle.pdf PDF
SF 30 4.2.2025 Amendment 04.pdf PDF
Continuation Sheets_Amendment 4.pdf PDF
Amendment 03 Seattle PH1A Continuation Sheets 03.pdf PDF
Amendment 2 13Mar25.pdf PDF
TOA CERCLA Price Form Amendment 04.pdf PDF
USCG Base Seattle IDP Flow Chart.pdf PDF
Amendment 03SF 30 3.26.25.pdf PDF
FPAS-Electrical Equipment 2025_03_11_sign Amendment 04.pdf PDF
Amendment 2 Cover Page.pdf PDF
Amendment 05 4.4.25.pdf PDF
Base Seattle CERCLA PSC Homeport PH1A - Pre Proposal Site Visit - Attendees.pdf PDF
Amendment 01 3.5.25.pdf PDF
TOA CERCLA 2.27.25.pdf PDF
FAR Class Deviation 25-02 Waiver of PLA Requirements.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70Z05022R43000009 Amendment 0008 Continuation Pages P a g e | 1

I. SOLICITATION NO. 70Z05025R43000001 IS AMENDED AS FOLLOWS:

DELETE: NA

REPLACE: NA.

II. THE FOLLOWING DOCUMENTS ARE ISSUED WITH THIS AMENDMENT: Biological Assessment, 2025.02_BA_USCG_Base Seattle

III. THE FOLLOWING PRE-PROPOSAL INQIRUIRIES (PPI) WERE RECEIVED IN

RESPONSE TO THE SOLICITATION and do not represent Contractor specific numbering:

PPI 2: Due to the extent of information included in the subject RFP, and multiple requests from critical trade partners after participating in the recent site visit, we ask for the Coast Guard to consider extending the PPI deadline to Friday March 21, 2025.

ANSWER: The PPI deadline is extended from March 13, 2025, to March 21, 2025.

PPI 3: Proprietary products. Please identify which items are required from a proprietary manufacturer or specific model on this project. If there are any, please provide the Justification and Approval documentation for this and identify three viable manufacturers for each of the identified proprietary items for the contractors to contact to receive competitive quotations.

ANSWER: The CG has not identified any proprietary products. Any products mentioned should have been accompanied by an "or equal" statement. If you find evidence to the contrary, please bring it to our attention.

PPI 4: Please confirm that there is no “Controlled Unclassified Information” (CUI) within the plans and specifications for this solicitation.

ANSWER: Confirmed, there are no CUI with the plans and specifications for this solicitation.

PPI 5: Due to the magnitude of scope on this significant project size, it is requested that the PPI due date be extended at least two weeks, to March 27th to accommodate through contractor review and time for subcontractor inquiries.

ANSWER: The PPI deadline is extended from March 13, 2025, to March 21, 2025.

PPI 6: Please confirm the PPI and Price Proposal deadline. We note conflicts on the date between the various bid documents and amendment files.

ANSWER: The PPI deadline is extended from March 13, 2025, to March 21, 2025. The Price Proposal deadline is extended from April 14, 2025, to April 30, 2025. The Non-Price proposal deadline remains unchanged. Non-Price proposals are due March 31, 2025.

PPI 31: Please consider extending the PPI cutoff date to at least March 27th to give the market adequate time to develop questions for a project of this complexity.

ANSWER: The PPI deadline is extended from March 13, 2025, to March 21, 2025. The Price Proposal deadline is extended from April 14, 2025, to April 30, 2025. The Non-Price proposal deadline remains unchanged. Non-Price proposals are due March 31, 2025.

END