This document is an Amendment (Amendment 2) to a federal solicitation for a Non-Time Critical Removal Action (NTCRA) at the U.S. Coast Guard Base Seattle Slip 36 area. The amendment extends key proposal deadlines and includes a Biological Assessment report: the Pre-Proposal Inquiry (PPI) deadline is extended from March 13, 2025, to March 21, 2025, and the Price Proposal deadline is extended from April 14, 2025, to April 30, 2025. The Non-Price proposal deadline remains unchanged at March 31, 2025.
The amendment addresses several contractor inquiries, confirming that no proprietary products are required and there are no Controlled Unclassified Information (CUI) in the plans and specifications. The Biological Assessment, prepared by Arcadis U.S., Inc. in February 2025, provides a detailed environmental analysis of the project area, focusing on potential impacts to threatened and endangered species, critical habitats, and marine ecosystems. The project involves pier demolition, sediment dredging, and waterfront infrastructure improvements at Base Seattle to support homeporting of new Polar Security Cutters, with careful consideration of environmental conservation measures throughout the project.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
The purpose of this amendment is to include a Biological Assessment report and to extend the PPI and Price Proposal deadlines. All other terms and conditions remain the same. See the continuation page(s) for details.
USCG SILC FD&CC Det Seattle 915 2nd Ave, Room 2664 Seattle, WA 98174
70Z05025R43000001
2031236103/13/2025
02/27/2025
70Z05025R43000001 Amendment 02 Continuation Pages P a g e | 1
I. SOLICITATION NO. 70Z05025R43000001 IS AMENDED AS FOLLOWS:
DELETE: NA
REPLACE: NA.
II. THE FOLLOWING DOCUMENTS ARE ISSUED WITH THIS AMENDMENT: Biological Assessment, 2025.02_BA_USCG_Base Seattle
III. THE FOLLOWING PRE-PROPOSAL INQIRUIRIES (PPI) WERE RECEIVED IN
RESPONSE TO THE SOLICITATION and do not represent Contractor specific numbering:
PPI 2: Due to the extent of information included in the subject RFP, and multiple requests from critical trade partners after participating in the recent site visit, we ask for the Coast Guard to consider extending the PPI deadline to Friday March 21, 2025.
ANSWER: The PPI deadline is extended from March 13, 2025, to March 21, 2025.
PPI 3: Proprietary products. Please identify which items are required from a proprietary manufacturer or specific model on this project. If there are any, please provide the Justification and Approval documentation for this and identify three viable manufacturers for each of the identified proprietary items for the contractors to contact to receive competitive quotations.
ANSWER: The CG has not identified any proprietary products. Any products mentioned should have been accompanied by an "or equal" statement. If you find evidence to the contrary, please bring it to our attention.
PPI 4: Please confirm that there is no “Controlled Unclassified Information” (CUI) within the plans and specifications for this solicitation.
ANSWER: Confirmed, there are no CUI with the plans and specifications for this solicitation.
PPI 5: Due to the magnitude of scope on this significant project size, it is requested that the PPI due date be extended at least two weeks, to March 27th to accommodate through contractor review and time for subcontractor inquiries.
ANSWER: The PPI deadline is extended from March 13, 2025, to March 21, 2025.
PPI 6: Please confirm the PPI and Price Proposal deadline. We note conflicts on the date between the various bid documents and amendment files.
ANSWER: The PPI deadline is extended from March 13, 2025, to March 21, 2025. The Price Proposal deadline is extended from April 14, 2025, to April 30, 2025. The Non-Price proposal deadline remains unchanged. Non-Price proposals are due March 31, 2025.
PPI 31: Please consider extending the PPI cutoff date to at least March 27th to give the market adequate time to develop questions for a project of this complexity.
ANSWER: The PPI deadline is extended from March 13, 2025, to March 21, 2025. The Price Proposal deadline is extended from April 14, 2025, to April 30, 2025. The Non-Price proposal deadline remains unchanged. Non-Price proposals are due March 31, 2025.
END
BIOLOGICAL ASSESSMENT
for the
Base Seattle Slip 36 Area, East Waterway Operable Unit Harbor Island Superfund Site
Seattle, Washington
Prepared for:
U.S. Coast Guard
Civil Engineering Unit Oakland Oakland, California
Prepared by:
Arcadis U.S., Inc.
February 2025
Biological Assessment Base Seattle Slip 36 Area ii
Contents Abbreviations and Acronyms .................................................................................................................... v 1 Introduction
1.1 Purpose and Scope of the Biological Assessment
2 Species Considered in this Biological Assessment
2.1 Species Potentially Affected
2.2 Species Unlikely to be Affected
2.2.1 Aquatic/Marine Species
2.2.2 Terrestrial Species
2.2.3 Plants
2.3 Designated Critical Habitat
2.4 Consultation to Date
3 Description of Proposed Action
3.1 Applicant
3.2 Project Background
3.3 Existing Facilities
3.4 Purpose and Need
3.5 Action Area
3.6 Description of Proposed Action
3.7 Pier Demolition including Pile Removal
3.8 Pier Replacement
3.8.1 Pier 36B Replacement
3.8.2 Pier 36A Replacement
3.9 Existing Pier Improvements
3.10 Dredging and Placement of Fill
3.11 Dredged Material Management, Transport, and Disposal
3.12 Staging
3.13 Construction Timing
3.14 Construction Best Management Practices
3.15 Conservation Measures
4 Status of Species and Designated Critical Habitat within the Action Area or Vicinity
4.1 Fish
4.1.1 Bull Trout (Salvelinus confluentus)
4.1.2 Bocaccio Rockfish (Sebastes paucispinis) Puget Sound/Georgia Basin Distinct Population
Segment
4.1.3 Yelloweye Rockfish (Sebastes ruberrimus) Puget Sound/Georgia Basin Distinct Population
Segment iii
4.2 Salmonids
4.2.1 Puget Sound Steelhead (Oncorhynchus mykiss) Distinct Population Segment
4.2.2 Puget Sound Chinook Salmon (Oncorhynchus tshawytscha) Evolutionary Significant Unit18
4.3 Essential Fish Habitat
4.3.1 Pacific Coast Salmon
4.3.2 Pacific Groundfish Essential Fish Habitat
4.3.3 Coastal Pelagic Essential Fish Habitat
4.4 Marine Mammal Protection Act Protected Species
5 Environmental Baseline and Cumulative Effects
5.1 Description of the Environmental Baseline
5.1.1 Aquatic Habitat
5.1.2 Water Quality
5.1.3 Sediment Quality
5.1.4 Land Use
5.2 Past, Current, and Future Projects within the Vicinity of the Action Area
5.3 Cumulative Effects
5.4 Interdependent or Interrelated Effects
6 Effects of the Proposed Action
6.1 Effects and Measures to Reduce Effects on Listed Fish and Salmonids
6.2 Effects and Measures to Reduce Effects on Marine Mammals
6.3 Effects and Measures to Reduce Effects on Designated Critical Habitat
6.4 Effects and Measures to Reduce Effects on Essential Fish Habitat
6.5 Effects on Environmental Baseline
7 Conclusions and Determination
7.1 Determination for Listed Fish and Designated Critical Habitat
7.2 Conclusions and Determination on Essential Fish Habitat
8 References iv
Tables Table 1 Summary of In-Water Activities Table 2 Managed Fish Species under Magnuson-Stevens Fishery Conservation Management Act
Table 3 Summary of Noise Impacts on Fish Table 4 Summary of Potential Noise Impacts on Marine Mammals Table 5 Effects Determination for Listed Species Table 6 Effects Determination on Essential Fish Habitat
Figures Figure 1 Site Location Map Figure 2 Base Seattle Site Plan Figure 3 Slip 36 Site Plan and Bathymetry Figure 4 Action Area Figure 5 Proposed Removal Action Components
Appendices Appendix A U.S. Fish and Wildlife Service and National Marine Fisheries Service Species and Habitat
Lists Appendix B Washington Department of Fish and Wildlife State Listed Species and State Candidate
Species Appendix C Washington Natural Heritage Program Vascular Plant Species of Conservation Concern v
Abbreviations and Acronyms °C degrees Celsius
°F degrees Fahrenheit
Appledore Appledore Marine Engineering, LLC
Arcadis Arcadis U.S., Inc.
BA biological assessment
BMP best management practice
CFR Code of Federal Regulations
CPS Coastal Pelagic Species
CPSFMP Coastal Pelagic Species Fisheries Management Plan
CY cubic yards dB decibels
DPS Distinct Population Segment
Ecology Washington Department of Ecology
EEZ Exclusive Economic Zone
EFH Essential Fish Habitat
EIS Environmental Impact Statement
ESA Endangered Species Act
ESU Evolutionary Significant Unit
Fed. Reg. Federal Regulation
HUC hydrologic unit code
IPaC USFWS Information for Planning and Consultation
MLLW mean lower low water
MMC Marine Mammal Commission
NMFS National Marine Fisheries Service
NOAA National Oceanic and Atmospheric Administration
NTCRA Non-Time Critical Removal Action
PAH polycyclic aromatic hydrocarbon
PCB polychlorinated biphenyls
PCGFMP Pacific Coast Groundfish Fisheries Management Plan
PCSFMP Pacific Coast Salmon Fishery Management Plan
PFMC Pacific Fishery Management Council
PHS Priority Habitat and Species
PSC Polar Security Cutter vi
RAL remedial action level
RMC residuals management cover
SEL sound exposure levels
SSDC Shared Strategy Development Committee
SWIFD Statewide Washington Integrated Fish Distribution
T&E threatened and endangered
USACE United States Army Corps of Engineers
USCG United States Coast Guard
USEPA United States Environmental Protection Agency
USFWS United States Fish and Wildlife Service
WDFW Washington Department of Fish and Wildlife
WDNR Washington Department of Natural Resources
Windward Windward Environmental LLC
WM DRF Waste Management Duwamish Reload Facility
1 Introduction
1.1 Purpose and Scope of the Biological Assessment
This biological assessment (BA) presents the potential effects of the United States Coast Guard (USCG) Civil Engineering Unit Oakland project site for the Base Seattle Slip 36 area within the East Waterway Operable Unit of the Harbor Island Superfund Site, located in Seattle, Washington (Figure 1) on state and federally listed threatened or endangered species (T&E), candidate species, and their habitat or designated critical habitat. This BA was prepared in accordance with legal requirements set forth in regulations promulgated under Section 7 of the Endangered Species Act (ESA) (50 Code of Federal Regulations [CFR] 402; 16 United States Code 1536 (c)).
Arcadis U.S., Inc. (Arcadis) has prepared this BA on behalf of the USCG for consultation with the National Marine Fisheries Service (NMFS) and U.S. Fish and Wildlife Service (USFWS) under Section 7 of the ESA. This BA also provides analysis for Essential Fish Habitat (EFH) considerations for species managed under the Magnuson-Stevens Fishery Conservation Management Act as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), as well as species protected under the Marine Mammal Protection Act.
2 Species Considered in this Biological Assessment The species list for the proposed action was obtained from the USFWS Information for Planning and Consultation (IPaC) website (USFWS 2022a), the NMFS Managed Species Directory – West Coast List (NMFS 2022c), Washington Department of Natural Resources (WDNR) Animal Species of Concern List (WDNR 2022), and the Washington Natural Heritage Program Vascular Plant Species of Conservation Concern List (Fertig 2021). The Priority Habitat and Species (PHS) identified in the Washington Department of Fish and Wildlife (WDFW) web mapping tool (WDFW 2021) and in the Statewide Washington Integrated Fish Distribution (SWIFD) webmap (WDFW 2018) were also used to determine whether there were documented occurrences of listed species within the vicinity of the proposed action.
The NMFS EFH mapping tool, NMFS critical habitat mapping tool, and IPaC results were used to determine whether critical habitat or EFH were mapped within the Action Area (NMFS 2021, 2022a,b;
USFWS 2022a). The habitat requirements for the listed species were compared to habitats present in the Action Area to determine the likelihood of each species occurring and the potential for them to be affected by the proposed action. T&E species lists for the Action Area as identified by the USFWS and NMFS are included in Appendix A.
2.1 Species Potentially Affected
Suitable habitat for the following listed or candidate species is present in the Action Area; therefore, these species may potentially be affected by the proposed action:
Steelhead (Oncorhynchus mykiss) – Puget Sound Distinct Population Segment (DPS) – Federally Threatened
Chinook salmon (Onchorhynchus tshawytscha) – Puget Sound DPS (pop. 15) – Federally Threatened
Bull trout (Salvelinus confluentus) – Coastal – Puget Sound – Federally Threatened
Bocaccio rockfish (Sebastes paucispinis) – Puget Sound DPS – Federally Endangered, State Threatened
Yelloweye rockfish (Sebastes ruberrimus) – Puget Sound – Federally Threatened, State Threatened
Killer whale (Orcinus orca) – Southern Resident DPS – Federally Endangered, State Endangered.
2.2 Species Unlikely to be Affected
The species identified below are identified by IPaC or NMFS lists as having potential to occur within the Action Area or vicinity; however, after further evaluation, it was determined that these species are unlikely to be affected by the proposed action because suitable habitat does not occur within the Action Area, or because the proposed action is outside of the known range for the species. The species are not discussed further in this BA because the proposed action was determined to have no effect on these species.
2.2.1 Aquatic/Marine Species
Eulachon smelt (Thaleichthys pacificus) – Southern DPS – Federally Threatened, State Endangered:
This species is anadromous but spends the vast majority of its life in the ocean. The Southern DPS is a protected entity and spawns in rivers from Northern California to British Columbia (National Oceanic and Atmospheric Administration [NOAA] 2022c). According to WDNR (2014), Washington rivers used for spawning by the Eulachon smelt include “Bear, Columbia (Lower and major tributaries), Cowlitz, Elochoman, Elwah, Grays, Kalama, Lewis, Naselle, Nemah, Quinault, Queets, Toutle and Wynoochee”. None of these rivers overlap the Action Area and there are no mapped records for this species in the Action Area or vicinity on the Washington PHS mapper or the SWIFD webmap (WDFW 2021, 2018). No critical habitat for this species is present within the Action Area or vicinity, and the closest mapped critical habitat is more than 80 miles to the northwest within Elwha River (NOAA 2022c) This species is unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
Green sturgeon (Acipenser medirostris) – Southern DPS – Federally Threatened:
Green sturgeon are anadromous fish that spawn in freshwater rivers. The southern DPS green sturgeon spawn in the Upper Sacramento, Feather, and Yuba rivers in California from April to July (NOAA 2022d). After spawning, they are known to summer and autumn off the coast of Oregon and Washington but are rare within inland waters and Puget Sound (NOAA 2022d). There are no mapped records for this species in the Action Area or vicinity on the Washington PHS mapper or the SWIFD webmap (WDFW 2021, 2018). No critical habitat for this species is present within the Action Area or vicinity, and the closest mapped critical habitat is more than 60 miles to the northwest in the Salish Sea (NOAA 2022d). This species is unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
Humpback whale (Megaptera novaeangliae) – Mexico DPS – Federally Threatened, State Endangered; Central America DPS – Federally Endangered, State Endangered:
The Central American DPS, Mexico DPS, and Hawaii DPS of humpback whales spend summers in Washington waters, particularly in open waters and coastal areas. The greatest number of individuals are seen between July and September. Once common in the Salish Sea and Puget Sound, this species was historically over-hunted, but local sightings have been increasing since the 1980s (Calambokidis and Steiger 1990, Puget Sound Express 2016); currently, the species is scarce in the inland waters (WDFW 2022d).
There are no mapped records for this species in the Action Area or Elliott Bay on the Washington PHS mapper (WDFW 2021). No critical habitat for this species is present within the Action Area or Elliott Bay, and the closest mapped critical habitat is more than 100 miles to the northwest in the western reaches of the Strait of Juan de Fuca (NMFS 2022b). In May 2019 a juvenile humpback was fatally struck by a ferry in Elliott Bay (Kiro 7 News 2019). In November 2023, a young humpback whale was observed within Elliot Bay for approximately 3 to 4 days (Valdez 2023). While humpback whales could be in the greater Puget Sound area, it is unlikely for them to be within the Action Area because it is very narrow and located in a busy, developed area with ship and barge traffic. This species is much more likely to be found in the open, deeper waters within Puget Sound, and even more likely within the Salish Sea to the north, which provides more direct access to open ocean. This species is unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
Loggerhead sea turtle (Caretta caretta) – Federally and State Endangered, Green sea turtle (Chelonia mydas) – Federally and State Threatened, Leatherback sea turtle (Dermochelys coriacea)
– Federally and State Endangered:
Sea turtles are rare in Washington and generally only observed along the western coast. None of these three species are expected to occur within the inland waters of Puget Sound or Elliott Bay, and there is no appropriate nesting habitat in the Action Area or vicinity (WDFW 2015). All three species nest at lower latitudes on tropical and subtropical beaches (WDFW 2022c,e,f). No critical habitat for any of the three turtle species is present within the Action Area or vicinity. The closest mapped critical habitat is for leatherback sea turtle and stretches along the entire western coast of Washington and does not include Puget Sound (NMFS 2022b). These species are unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
Northwestern pond turtle (Actinemys marmorata) – State Endangered:
Northwestern pond turtles inhabit freshwater ponds and lakes with surrounding open, upland habitats in the Puget Sound lowland region. They require logs and/or other surfaces for basking, and nest in grasslands and woodlands around the ponds (WDFW 2022h).
There are no freshwater ponds, lakes, grasslands, or woodlands in the Action Area or vicinity to support this species. Northwestern pond turtles are mapped north of the Action Area around Lake Union but are not likely to occur in the Action Area and, thus, will not be affected by the proposed action.
2.2.2 Terrestrial Species
Marbled murrelet (Brachyramphus marmoratus) – Federally Threatened, State Endangered:
Marbled murrelets feed on fish in marine waters but nest up to 50 miles inland (WDNR 2018). This species is found along the Pacific coast, including Puget Sound, and feeds on Pacific herring, anchovy, sand lance, and capelin. They nest in large mature conifers with platforms and large mossy branches (WDNR 2018).
There are no mapped records for this species in the Action Area or Elliott Bay on the Washington PHS mapper (WDFW 2021). No critical habitat for this species is present within the Action Area or Elliott Bay. No suitable forested habitat is present in the Action Area for nesting. The vicinity does contain marine waters known to support Pacific herring that marbled murrelet could feed on.
However, the Action Area and vicinity are busy, industrial, narrow, and confined by docks and large ship movement. The Action Area does not contain prime habitat for this species, and marbled murrelet are expected to use the more suitable marine habitat in northern Elliott Bay by Discovery Park or along the western coast of Puget Sound. This species is unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
Streaked horned lark (Eremophila alpestris strigata) – Federally Threatened, State Endangered:
Streaked horn lark habitat consists of bare ground, including open country with short or no vegetation.
This species breeds in short grasslands, desert, short sage scrub, and tundra (Cornell Lab of Ornithology 2019a). They nest in depressions or scrapes in the ground.
No suitable bare ground habitat is present in the Action Area. The Action Area consists of industrial docks, concrete, asphalt, and estuary waters. The ground is not suitable for nesting, and no grassland or prairies for foraging are present. This species is unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
Yellow-billed cuckoo (Coccuzus americanus) – Federally Threatened, State Endangered:
Yellow-billed cuckoos exist almost exclusively in large, continuous swaths of dense vegetation (50 acres or larger), particularly willow thickets and riparian woodlands along streams and rivers (Cornell Lab of Ornithology 2019b; Daw 2014). The Action Area is entirely industrial and developed and does not contain any suitable vegetation or freshwater sources for yellow-billed cuckoo. This species is unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
Monarch butterfly (Danaus plexippus) – Federal Candidate:
Monarchs that breed west of the Rocky Mountains overwinter in California require secure sources of milkweed. In Washington, milkweed is typically found near wetlands, riparian areas, and in weedy habitats. This species also requires nighttime roosting trees. Monarchs begin their migration south in the late summer (WDFW 2022g). The Action Area does not contain milkweed or suitable roosting trees. This species is unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
2.2.3 Plants
The Action Area is an industrial dock surrounded by concrete, asphalt, and buildings. No vegetated areas or suitable habitat for plant establishment are present. The following plant species are unlikely to occur in the Action Area and, thus, will not be affected by the proposed action.
Triangular-lobed moonwort (Botrychium ascendens) – State Threatened
Stalked moonwort (Botrychium pedunculosum) – State Threatened
Golden paintbrush (Castilleja levisecta) – Federally and State Threatened
Weak thistle (Cirsium remotifolium var. remotifolium) – State Endangered
Pacific peavine (Lathyrus vestitus var. ochropetalus) – State Endangered
White meconella (Meconella oregana) – State Endangered.
2.3 Designated Critical Habitat
According to NMFS and USFWS, the Action Area and vicinity are located within designated critical habitat for the following species:
Bull trout
Bocaccio rockfish
Yelloweye rockfish
Southern resident killer whale
Chinook salmon Puget Sound Evolutionary Significant Unit (ESU)
Steelhead (Puget Sound DPS).
2.4 Consultation to Date
To date, there has been no documented contact with USFWS or NMFS staff regarding the proposed action.
The initial species list for the proposed action as discussed in Section 2.1 was obtained from the USFWS IPaC website (Appendix A), NMFS’s West Coast Species list, the Washington State T&E Species list (Appendix B), and the Washington Natural Heritage Program Vascular Plant List (Appendix C).
3 Description of Proposed Action
3.1 Applicant
This BA was prepared by the USCG to satisfy the requirements of Section 7 of the ESA (16 United States Code 1536 (c)) for the planned Non-Time Critical Removal Action (NTCRA) for Slip 36 of the East Waterway Operable Unit of the Harbor Island Superfund Site. The proposed action described in this BA will be performed pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (i.e., Superfund) and is consistent with the East Waterway Operable Unit Interim Record of Decision (United State Environmental Protection Agency (USEPA) 2024a). Details of the NTCRA are described in the Action Memorandum (USEPA 2024b).
3.2 Project Background
Base Seattle is the largest USCG facility in the Pacific Northwest and provides a full range of support functions for USCG vessels and missions in the Pacific Northwest and polar areas of operation and serves as the homeport for several USCG cutters (Figure 2). Current facilities and infrastructure at Base Seattle are in poor condition, which hinders the USCG from executing missions efficiently. The replacement of current ice breakers with new Polar Security Cutters (PSCs) and possible future homeporting of other major cutters necessitates facility enhancements to support these advanced operating assets.
The USCG is preparing a programmatic Environmental Impact Statement (EIS) to address the base modernization activities to be conducted within the uplands, including (but not limited to) construction of new infrastructure and modifications to update existing upland facilities and upland infrastructure. Note that the EIS only addresses modernization activities for the proposed uplands base and does not include the in-water activities to be conducted under the proposed action described in this BA.
Base Seattle currently includes shore side buildings and Slip 36, which is located perpendicular to the East Waterway in an east/west orientation. Slip 36 was constructed in 1927 and originally dredged to -35 feet mean lower low water (MLLW). The berth has been dredged several times to accommodate USCG operations, including most recently from 2004 to 2005 to lower the sediment elevation in Slip 36 to -40 feet MLLW (from a previous elevation of -38 feet MLLW).
3.3 Existing Facilities
Slip 36 includes Pier 36A (west) and Pier 36B (east) on the south, Pier 37 on the north, and the slip apron at the head or east side. These structures are described below and shown on Figure 3, based on information from a waterfront facility inspection conducted in 2020 (Appledore Marine Engineering, LLC [Appledore] 2020).
The seawall bulkhead consists of approximately 1,500 feet of coated steel sheet pile with concrete cap. The installation date is not known and may vary for different portions of the structure. The bulkhead serves as a retaining wall and shoreline protection for the upland parking and roadway. The slope adjacent to the bulkhead under Pier 36A, Pier 36B, and the slip apron is armored with riprap for erosion protection.
Pier 36A was rebuilt in 2005 with concrete piles, and the pier face was moved to the south approximately 50 feet to increase the width of Slip 36. Approximately 1,100 timber piles from the previous structure were removed or broken off at the mud line. To facilitate a sheer cut for dredging, an underwater steel sheet-pile retaining wall (104 feet long) was installed. The sheet pile was driven to approximately 84 feet in depth below sediment surface, and the exposed face varies from 10 to 20 feet based on the angle of the southern slope. To increase the shear strength of the sediment, due to risk of instability in a seismic event, the USCG installed 3-foot-diameter gravel columns on a 9-foot grid, extending 27 feet from the wall face along the extent of Pier 36A and to an elevation of -100 feet MLLW (approximately 60 feet deep). A total of approximately 153 gravel columns were installed.
Pier 36B was constructed in 1942 and consists of a timber structure with an asphalt overlay supported by creosote-treated timber piles. Building 3 is partially constructed on Pier 36B. Numerous repairs have been completed on Pier 36B to restore pilings and other structural components, most recently in 2018. Surface loads are currently limited on Pier 36B due to significant structural damage and loss of bearing capacity in timber piles from marine boring organisms. Riprap armoring is present on the upper portions of the slope extending to the bulkhead.
The slip apron was constructed in 1992 as a replacement for a timber structure and consists of concrete elements, including pre-cast deck panels, cast-in-place pile caps, and prestressed concrete piles. During construction, timber piles from the previous structure were cut or removed and remain under the reconstructed slip apron. Riprap armoring is present on the upper portions of the slopes extending to the bulkhead.
Pier 37 (Berths C and D) was reconstructed within the same extent as the prior pier in 1996 using precast concrete piles driven to a depth of approximately 150 feet and batter piles intended to mitigate liquefaction risk. During reconstruction, the creosote-treated timber piles of the previous structure were broken off at the mud line to retain the sheer strength of the sediment that the piles provided, and the broken-off timber piles remain under the reconstructed Pier 37. Pier 37 is connected to Terminal 46 to the north and does not include a bulkhead.
The boathouse and floating docks located in the eastern end of Slip 36 consist of concrete float modules held in place by concrete guide piles and were constructed in 1989 and 2006 (Appledore 2020). The docks and boathouse provide berthing space for small boats, including rapid response vessels that support critical USCG missions locally in Puget Sound.
3.4 Purpose and Need
The proposed action includes activities to deepen and widen Slip 36 to address both the required removal actions identified in the Action Memorandum (USEPA 2024b) and to implement associated repairs or upgrades to in-water infrastructure needed based on the berth expansion and removal actions and/or to provide site resiliency. The primary purpose of the proposed action is to address sediment within Slip 36 that has constituent concentrations greater than the East Waterway Operable Unit Interim Record of Decision remedial action levels (RALs [USEPA 2024a]) and to control potential sources of recontamination within Slip 36.
Slip 36 at Base Seattle is proposed as the home port for new PSCs. The USCG determined that the existing depths within Slip 36 are inadequate and that Pier 36 is structurally inadequate to accommodate PSCs or other vessels of its class. Facility enhancements are necessary to support PSCs and possible future homeporting of other major cutters. Removing sediment will address contamination and increase the depth of Slip 36 which will improve USCG operations and allow berthing of the new PSCs. The minimum operational depth necessary in Slip 36 to meet USCG requirements is -42 feet MLLW. PSCs are considered mission critical to the USCG; therefore, the ability to homeport these vessels is an essential component of the proposed action.
3.5 Action Area
Under 50 CFR § 402.02, the Action Area is defined as including all areas that may be affected directly or indirectly by the proposed action, rather than only the immediate vicinity of the the proposed action.
Therefore, the Action Area for the Base Seattle proposed action includes the entirety of the future Slip 36 extent as well as the area between Slip 36 and the federal navigational channel and extending north into the southeastern portion of Elliott Bay and south into the East Waterway. These areas are included in the Action Area to account for potential temporary increase in turbidity and potential noise effects resulting from pile driving. The Action Area is shown on Figure 4.
3.6 Description of Proposed Action
The proposed action entails deepening and widening Slip 36 for operational improvements to accommodate larger vessels as described in the Action Memorandum (USEPA 2024b). Activities include:
Dredging – Contaminated sediment will be removed in open water areas to meet the RALs to a minimum depth of -43 feet MLLW to meet USCG operational requirements and allow for placement of a dredge residuals management cover (RMC) layer. Sediment will be removed to the maximum extent possible without compromising or destabilizing existing structures or slopes. Approximately 65,000 cubic yards (CY) of sediment will be removed through dredging.
RMC Layer – A 9-inch layer of clean sand will be placed as an RMC layer over all dredged areas in Slip 36. The RMC layer will be designed to achieve a cleaner surface layer after dredging where dredge residuals may be present.
In-Situ Treatment Due to Structural Stability – In areas where dredging to RALs is not possible to protect the stability of existing structures, in-situ treatment consisting of clean sand amended with activated carbon (2 percent), or equivalent as determined by USEPA, will be placed. The in-situ treatment layer is anticipated to be 18 inches, or as determined in the design and subsequently approved by USEPA. The total volume of fill material to be placed for the RMC layer and in-situ treatment in open water areas is 13,000 CY.
In-Situ Treatment Under Piers – In under pier areas with exposed sediment that contains contaminants of concern at concentrations above the RALs, in-situ treatment applied. The in-situ treatment amendment will consist of activated carbon-impregnated materials placed in a 3-inch (minimum) layer, or equivalent as approved by USEPA. In-situ treatment amendment will not be placed in areas that do not have exposed sediment due to armoring. The area of exposed, under pier sediment that requires in-situ treatment will be determined in design. The maximum placement volume is estimated to be 1,650 CY.
In addition to the NTCRA components that are described in the Action Memorandum, USCG will implement infrastructure work in Slip 36 related to waterfront structures, including the following components:
Removal and Replacement of Pier 36B – The USCG has determined that Pier 36B is no longer structurally sound, does not meet current or future facility requirements, and needs to be demolished and replaced with a new structure. Building 3 (which is partially on the existing Pier 36B) will be demolished and the existing decking and creosote-treated wooden piles will be removed. A sheet pile toe wall will be installed to retain upland soil and facilitate sediment removal to widen Slip 36. A new Pier 36B structure will be constructed using concrete piles and pier decking.
Removal and Replacement of Pier 36A – The existing Pier 36A structure is not designed to withstand additional loads associated with the required deepening of Slip 36 and USCG requirements for future resiliency. The existing Pier 36A, including concrete decking and piles, will be removed and replaced with a new structure in the same footprint. The existing sheet pile stone wall will remain in place.
Removal and Replacement of Floating Docks – The existing small boat docks located at the east end of Slip 36 will be removed and replaced to facilitate dredging and other structural work. The existing gangways and piles will be removed. During construction, a temporary dock will be installed to maintain USCG operational capabilities. The temporary dock will be removed and replaced with new floating docks in the same area as the existing structures.
Armor Placement – The existing slope at the east end of Slip 36 adjacent to the Slip 36 Apron will be armored to protect against erosion.
Work will be phased over multiple in-water and upland construction seasons. Phase one will include demolition of Pier 36B and the floating docks, installation of temporary docks, installation of the Pier 36B toe and bulkhead walls, and sediment dredging. Phase two will include installation of the new Pier 36B structure. Phase three will include demolition and reconstruction of Pier 36A. The proposed action is described in further detail by activity in the subsequent sections.
3.7 Pier Demolition including Pile Removal
Demolition of Pier 36 will consist of the following activities:
Demolition of Building 3: The existing Building 3 currently located on Pier 36B will be demolished and removed in its entirety. Building 3 is an approximately 91,000-square-foot warehouse retrofitted with interior office and berthing space and is primarily constructed of concrete and steel. A hazardous materials survey will be conducted prior to demolition, and wastes will be segregated for handling and disposal, as required. Demolition waste and debris will be managed within the upland areas of Base Seattle prior to being loaded into containers or railcars for transport (by rail or road) to an off-site disposal facility. Best management practices (BMPs) will be used during demolition to protect against discharge of waste or debris into Waters of the United States.
Pier 36B Demolition: Demolition of Pier 36B will occur using both land-based and water-based equipment including excavators, land-based and barge-mounted cranes, and hand tools. However, work activities associated with the foundation for Building 3 and miscellaneous concrete pile caps as well as various repairs may require the use of a jackhammer. Approximately 63,000 square feet of decking and 630 linear feet of concrete bulkhead will be removed.
Pier 36B Pile Removal: Approximately 1,700 existing creosote-treated timber piles, 36 concrete piles,12 steel piles, and 150 timber piles will be removed using a impact hammer with a crane hoist or other methods (e.g., sling), depending on the condition of the pile. Timber piles will be removed in their entirety, if possible, using direct pull from a crane or impact hammer. Piles that cannot be removed will be cut off at the mudline and left in place or removed with a clamshell on a barge-mounted crane. Removed piles will be stockpiled in an area with drainage control and will be disposed at an appropriate landfill authorized to accept creosote-treated wood.
Pier 36A Demolition: Demolition of Pier 36A will occur using primarily water-based equipment, with some support from land-based equipment as feasible based on access. The equipment would include excavators, barge-mounted cranes, and hand tools. The majority of Pier 36A components are comprised of concrete and will require the use of jackhammers to demolish. Approximately 16,500 square feet of decking and 334 linear feet of concrete bulkhead will be removed.
Pier 36A Pile Removal: Approximately 170 existing concrete piles will be removed using a impact pile driver with a crane hoist or other methods (e.g., sling). It is likely that many or all of the piles may be too long to remove. Piles that cannot be removed will be cut off at the mudline and abandoned in place. Removed piles will be stockpiled in an area with drainage control and disposed or recycled at an appropriate factility.
Floating Dock Demolition: Demolition of the existing floating docks at the east end of Slip 36 will using primarily water-based equipment, with some support from land-based equipment as feasible based on access.
3.8 Pier Replacement
Following demolition of the existing Pier 36, Pier 36A will be placed within the same footprint. Pier 36B will be replaced with a new structure aligned with Pier 36A, as shown on Figure 5.
3.8.1 Pier 36B Replacement
Pier 36B replacement will consist of the following activities:
Pile Installation: Sheet and steel piles will be installed to support the new Pier 36B. Piles will be installed using a impact hammer. A summary of the piles required for each component is provided below.
o Toe Wall: Up to 149 steel piles (48 inch diameter) will be installed to create the toe wall at the new Pier 36B and facilitate dredging to widen Slip 36. Approximately 1,600 blows will be required to install each pile. The toe wall will be installed during the first phase of work after demolition of Pier 36B and prior to sediment removal adjacent to Pier 36B.
o Bulkhead Wall: A new bulkhead combination wall consisting of 162 sheet piles (27.5 inches wide), 93 steel pipe piles (36 inch diameter) will be installed. The steel pipe piles include four open end piles and two closed end piles that are longer (112 feet). The remaining 87 steel pipe piles will be between 50 and 60 feet long. Approximately 80 blows will be required to install each sheet pile. The steel pipe piles will require 700 (50 to 60 feet long piles), 1,000 (112 feet long, open end piles), or 1,700 blows (112 feet long, closed end piles). The bulkhead wall will be installed during the first phase of work.
o Pier 36B Piles: Up to 128 steel piles (36 inch diameter, closed end) will be installed to support the new Pier 36B structure. The piles will be between 109 and 125 feet long. Approximately 1,700 blows will be required to install each pile. The pier piles will be installed during the second phase of work.
Pier Deck Installation: Approximately 30,200 square feet of pre-cast concrete decking will be installed as part of the new Pier 36B. The deck will be installed during the second phase of work.
3.8.2 Pier 36A Replacement
Pier 36A replacement will consist of the following activities:
Pile Installation: Steel and sheet piles will be installed to support the new Pier 36B and as part of the bulkhead wall. Piles will be installed using a impact hammer. Steel pile installation will occur over the course of approximately 100 days. The work will be conducted during the third phase, is currently in design, and the number of blows per pile has not been determined. A summary of the piles required for each component is provided below.
o Bulkhead Wall: A new bulkhead combination wall consisting of 88 sheet piles and 44 steel pile piles (36 inch diameter, closed end) will be installed. The steel piles will be approximately 60 feet long.
o Pier 36A Piles: Up to 113 steel piles (36 inch diameter, closed end) will be installed to support the new Pier 36A structure. The piles will be between 111 and 164 feet long.
Pier Deck Installation: Approximately 19,000 square feet of pre-cast concrete decking will be installed as part of Pier 36A. The deck will be installed will be conducted during the third phase of work.
Pier replacement activities are expected to occur over no more than five in-water work windows. The anticipated daily blows from the impact hammer are not expected to exceed 2385 blows per day.
3.9 Existing Pier Improvements
It is anticipated that in-water and upland structural improvements will be necessary to replace Pier 36A.
The type and scope of retrofits will be further refined during design but may include tie backs installed at Pier 36A and/or upland ground anchors to provide structural stability along the pier. If ground anchors are used, drilling below the water line could occur from either a drill rig mounted on a barge or from uplands. If steel tie rods are used, installation would occur by trenching into the existing slope and then backfilling the trench with clean imported fill material. Steel tie rods would not require drilling but would require moving the existing riprap to approximately the mean higher high water level and then replacing the rip rap along the slope. In addition to tiebacks, it is anticipated that ground improvement of upland soils at Pier 36A will be required. Ground improvement activities would be conducted from the upland rather than in-water.
3.10 Dredging and Placement of Fill
Sediment will be dredged from approximately nine acres of open water areas to a minimum depth of -43 feet MLLW (plus 1 foot of overdredging). The estimated dredge volume is presented in Section 3.6.
Dredging is expected to be conducted using mechanical methods, such as a barge-mounted crane with an environmental bucket. The dredged materials will be placed into a barge and transported to the Waste Management Duwamish Reload Facility (WM DRF) located approximately 5 miles south of the Action Area. Sediment would be gravity dewatered on the barge and then transferred to a handling area at the transload facility and amended with dewatering reagents as necessary (e.g., portland cement or fly ash) to reduce the water content and meet disposal requirements. The amended sediment will be loaded into railcars for transportation to the disposal facility. Dredging activities may be conducted in single (12-hour) or double (24-hour) shifts. Dredging production rates of approximately 500 to 1,000 CY per single shift are expected, depending on the equipment, slopes, and dredge cut.
An RMC layer consisting of imported granular material (sand) will be placed in areas where sediment concentrations meet the RALs. The RMC layer will be placed over approximately 5 acres. In areas where sediment concentrations do not meet the RALs due to structural constraints that limit dredging or where limited contaminants of concern are present, open water in-situ treatment will be applied and consist of imported granular material mixed with activated carbon (2 percent) and placed over sediment. The open water in-situ treamtent area is approximately 2 acres. Fill material will be delivered to the project site on barges and are typically placed using a barge crane and bucket in open water areas. Fill quantities are discussed in Section 3.6.
In areas with exposed sediment underneath existing piers, under pier in-situ treatment will be applied. The material consists of aggregate with an activated carbon coating and would likely be placed over the sediment using specialty equipment due to the limited access. The material would be placed in a minimum 3-inch layer (to be confirmed during design).
Limited sediment removal underneath Pier 36A would be conducted between demolition and reconstruction of the pier using the same methodology described above for open water dredging.
Sediment will be removed and backfill and/or in-situ treatment materials will be placed followed by riprap armoring. Spaces between riprap armoring will be filled with smaller diameter stone (fish mix).
3.11 Dredged Material Management, Transport, and Disposal
Dredged sediment will be placed directly on barges and transported to the WM DRF. Disposal of dredged sediment will be consistent with the requirements of the interagency Dredged Materials Management Program (United States Army Corps of Engineers [USACE] 2021). No open water disposal will occur.
Dredged material will be placed on a haul barge and transported to WM DRF for mangement and subsequent land transport to the landfill. Barges will be brought to the site via Duwamish Waterway and the West Waterway federal navigation channel (Figure 4). Dredging within Slip 36 is expected to occur over the course of approximately 150 days within three agency-approved in-water work windows.
3.12 Staging
Waste and construction materials may be staged in the upland portions of Base Seattle and other off-site locations. Demolition waste and debris may be stockpiled in areas with controls to prevent runnoff and waste from entering the waterway. Construction materials, including heavy equipment, fill materials, and other supplies, may also be stockpiled in areas with controls as required by the spill prevention plan.
BMPs and controls will be used to protect against discharge of sediment and water to the waterway.
3.13 Construction Timing
In-water work is expected to begin in 2025. All in-water construction work will occur during appropriate work windows to avoid and minimize impacts on migratory fish. In-water construction work is expected to occur over the course of four to five in-water work windows. Upland activities that do not involve in-water work (e.g., mobilization/demobilization, demolition of upland infrastructure, material handling, and transportation) may be conducted outside of the in-water work windows. Table 1 summarizes the estimated duration for the in-water work activities and the in-water work windows.
Table 1 Summary of In-Water Activities
In-Water Activity In-Water Work Window Estimated Activity Duration
Pier 36A Demolition and Pile Removal
July 16 – February 15
3 – 6 months Pier 36B Demolition and Pile Removal (includes Building 3 demolition) 6 – 9 months
Pier 36A Pile Installation 4 – 6 months Pier 36B Pile Installation 4 – 6 months
Existing Pier Improvements Total duration to be determined based on design.
May occur in multiple work windows depending on location and type of improvement.
Open Water Dredging 3 – 7 months Under Pier Dredging 1 – 2 months Fill Placement 1 – 2 months
3.14 Construction Best Management Practices
The following construction BMPs will be implemented during the removal action activities to reduce the potential for take of listed fish and marine…