About this file

This document is an Amendment to Solicitation (Standard Form 30) for the National Multiple Award Construction Contract III (NMACC III) Pool One project at USCG Base Seattle. The amendment provides answers to two Pre-Proposal Inquiries (PPIs) related to vessel circulation routes and pile driving requirements.

PPI #229 clarifies that three icebreakers are currently assigned to USCG Base Seattle, with no specific berthing requirements due to two additional berths at Terminal 46. PPI #230 addresses pile driving specifications, indicating that a bubble curtain must be used for impact pile driving of 36-inch steel pipe piles, with daily driving blows limited by thresholds outlined in the Biological Assessment. The amendment maintains flexibility for the contractor regarding vessel movements and provides technical guidance on environmental mitigation during construction activities.

View the file

Other files

File Type Posted
Amendment 09_Drawing CN101-CN102 Markups_Revised Dredge Placement Areas.pdf PDF
Amendment 09_General Wage Decision WA20250125 14Mar2025.pdf PDF
Amendment 09 5.2.25.pdf PDF
Amendment 09_Drawing AB200 Markup_for PPI 110.pdf PDF
Amendment 09_Debris Survey Technical Memo_PPI 197.pdf PDF
70Z05025R43000001_Amendment 08 4.25.25.pdf PDF
70Z05025R43000001_Amendment 07 4.17.25.pdf PDF
70Z05025R43000001_06_ 06 4.14.25.pdf PDF
NMACC Site Visit_27Feb2025 (Final).pdf PDF
FPAS Rated Order Letter to Contractors_Amendment 04.pdf PDF
Amendment 03FPAS-SILC-NMACC III Electrical Equipment 2025_03_11_sign.pdf PDF
Amendment 03Base Seattle Boat Haulout - As Builts.pdf PDF
2025.02_BA_USCG_BaseSeattle.pdf PDF
SF 30 4.2.2025 Amendment 04.pdf PDF
Continuation Sheets_Amendment 4.pdf PDF
Amendment 03 Seattle PH1A Continuation Sheets 03.pdf PDF
Amendment 2 13Mar25.pdf PDF
TOA CERCLA Price Form Amendment 04.pdf PDF
USCG Base Seattle IDP Flow Chart.pdf PDF
Amendment 2 Continuation Pages.pdf PDF
Amendment 03SF 30 3.26.25.pdf PDF
FPAS-Electrical Equipment 2025_03_11_sign Amendment 04.pdf PDF
Amendment 2 Cover Page.pdf PDF
Amendment 05 4.4.25.pdf PDF
Base Seattle CERCLA PSC Homeport PH1A - Pre Proposal Site Visit - Attendees.pdf PDF
Amendment 01 3.5.25.pdf PDF
TOA CERCLA 2.27.25.pdf PDF
FAR Class Deviation 25-02 Waiver of PLA Requirements.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

1. CONTRACT ID CODE

I

PA

E OF PAGES

I 2

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER

5. PROJECT NUMBER (If applicable)

10 05/06/2025 20312361

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE I

USCG SILC FD&CC Det Seattle

915 - 2nd Ave., Room 2664

Seattle, WA 98174

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

70Z05025R43000001

9B. DATED (SEE ITEM 11)

02/27/2025

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended. � is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor D is not D is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide answers to two remaining PPls. There are no outstanding PPls. See the

Continuation Page.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

R

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

70Z05025R43000001

SOLICITATION NO. 70Z05025R43000001 IS AMENDED AS FOLLOWS:

Enclosed documents:

n/a

Task Order Announcement

NA

RFP, Drawings

REMOVE: NA

INSERT: NA

Specifications

REMOVE: NA

INSERT: NA

THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPONSE TO THE

SOLICITATION:

PPI # 229: Specification 01 14 00 Work Restrictions reference "waterborne vessel circulation routes." Please provide vessel circulation routes for the larger Cutters and Ice Breakers. What are the berthing requirements for these vessels during the dredging and pier modification work?

What restriction does the contractor have to not impact the larger waterborne vessels?

Answer: There currently are three icebreakers assigned to USCG Base Seattle. There are no specific berthing requirements at this time because of the two additional berths at the temporary berthing / Terminal 46 lease from the Port of Seattle. The larger cutters and ice breakers have a long lead time as to when they arrive and depart USCG Base Seattle. The contractor will be made aware of this advance planning and can plan accordingly. There are no known restrictions on the contractor caused by these cutters. The government reserves the right to change this answer in the future due to operational requirements and/or unforeseen changes to the Terminal 46 lease with the Port of Seattle.

PPI # 230: Section 31 62 16.13 Paragraph 2.2.1.2 Vibratory hammers states "The use of vibratory hammers is dependent upon satisfactory driving and pile dynamic testing. Final Approval of the proposed hammer and other driving equipment is subject to the satisfactory completion and approval of the piles tests." The technical specification indicates that impact driving is required but the BA states that vibratory driving is recommended (and preferred) for pile installation. Please confirm that bidders can assume a vibratory hammer will be allowed for initial installation of both test and production piles.

Answer: Bubble curtain to be used with all impact pile driving and proofing of 36-inch steel pipe piles, and when daily blows for other piles exceed the thresholds for blows/day on Table 3 of the Biological Assessment. Daily blows in Table 3 are based on expected production rate. See inserted Paragraph 3.11 to Spec 01 57 19 in this amendment for full detail.