Design-bid-build (DBB), B14 new stair/life safety/power improvements portsmouth naval shipyard (PNSY), kittery, maine
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N4008524R2534
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Kittery, Maine, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Facilities Engineering Command is seeking a design-bid-build (DBB) construction contract for comprehensive renovation of the historic Building 14 at Portsmouth Naval Shipyard in Kittery, Maine. The solicitation (N4008524R2534) requires a total interior renovation of the four-story, 22,705 square foot building, addressing critical infrastructure and systems upgrades. Key project requirements include hazardous material abatement, structural modifications, addition of two code-compliant internal stairs, installation of an elevator, historic window and masonry restoration, and complete overhaul of mechanical, electrical, and fire protection systems. The contract will be awarded on a best value basis, evaluating factors including price, experience, management approach, safety, past performance, and small business utilization. Proposals are due by May 30, 2024, at 2:00 PM EDT, with a contract performance period of 582 calendar days.
The solicitation is an unrestricted, full and open competition with no specific set-aside designation, targeting the NAICS category 236220 for Commercial and Institutional Building Construction with a $45 million small business size standard. The estimated contract value falls between $10-25 million, with potential additional funding for optional line items such as furniture, electronic security systems, and structural improvements. The place of performance is Kittery, Maine, specifically at the Portsmouth Naval Shipyard. Contractors will be required to work within an active military installation, adhering to strict security and access protocols. The project includes site improvements like paving, walks, and utility relocations, and requires comprehensive documentation, quality control measures, and compliance with historical preservation standards. Wage rates will be determined by the most recent general wage determination for York County, Maine, which was updated in November 2024.
Notice text
2 versions
Update #2 · Latest ·
This contract is for Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project will include a total interior renovation of the four-story 22,705 square foot historic Building 14. The building is in dire need of utility upgrade repairs and egress / fire life safety /accessibility compliance upgrades. The project will also address the need for exterior envelope repairs, structural upgrades and removal of lead paint and asbestos materials from the interior finishes. Site improvements include all paving, walks, and utility pads. Utility repairs include electrical, fire, water, sanitary services, connections, and utility relocations. The project will consist of a total interior renovation including: hazardous material removal and remediation; modifying or removing and replacing the building?s floors and supporting structure; adding two code compliant internal stairs; adding a building addition to house an elevator, stair and utility support spaces; providing storm windows within original window openings; restoring historic windows; provide lightening protection system; repointing and repairing the historic masonry walls; repairing and repainting historic trim; repairs to historic granite block; repairs and modifications to historic timber framing; providing offices, a locker room, conference and break rooms, and toilet rooms; and completely overhauling the building?s mechanical, electrical, and fire protection systems.
Update #1 ·
This contract is for Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project will include a total interior renovation of the four-story 22,705 square foot historic Building 14. The building is in dire need of utility upgrade repairs and egress / fire life safety /accessibility compliance upgrades. The project will also address the need for exterior envelope repairs, structural upgrades and removal of lead paint and asbestos materials from the interior finishes. Site improvements include all paving, walks, and utility pads. Utility repairs include electrical, fire, water, sanitary services, connections, and utility relocations. The project will consist of a total interior renovation including: hazardous material removal and remediation; modifying or removing and replacing the building?s floors and supporting structure; adding two code compliant internal stairs; adding a building addition to house an elevator, stair and utility support spaces; providing storm windows within original window openings; restoring historic windows; provide lightening protection system; repointing and repairing the historic masonry walls; repairing and repainting historic trim; repairs to historic granite block; repairs and modifications to historic timber framing; providing offices, a locker room, conference and break rooms, and toilet rooms; and completely overhauling the building?s mechanical, electrical, and fire protection systems.
Files
Show all 31
Notice history
| Notice | Type | Posted |
|---|---|---|
| Design-bid-build (DBB), B14 new stair/life safety/power improvements portsmouth naval shipyard (PNSY), kittery, maine | Award Notice | |
| This notice | Solicitation | |
| Building 14 New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard, Kittery, Maine | Pre-Solicitation | |
| Building 14 New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard, Kittery, Maine | Special Notice | |
| Building 14 New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard, Kittery, Maine | Special Notice | |
| Building 14 New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard, Kittery, Maine | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity