Attachment B - Construction Experience Project data sheet.docx

DOCX document 40 KB Posted

Attached to
DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE
Solicitation number
N4008524R2534
Issued by

About this file

The provided document is an Attachment B - Construction Experience Project Data Sheet, which is a form that contractors must complete to provide details on their relevant construction or design experience for a federal contract opportunity. The form requires information such as the firm's name and contact details, the type of work performed (e.g., prime contractor, subcontractor), contract details (number, award/completion dates, value), and a description of the project's scope and the contractor's self-performed work. The related federal contract opportunity is for Design-Bid-Build (DBB) construction services for Building 14 at the Portsmouth Naval Shipyard in Kittery, Maine, which includes a total interior renovation, utility upgrades, and exterior envelope repairs.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 006 - attachment 2- J and A Toilet Accessories .pdf PDF
Amendment 0006 - B14.pdf PDF
Amendment 006 - attachment 1 - J and A Interior Finishes.pdf PDF
Amendment 0005 - Attachment 1 - M503.pdf PDF
Amendment 0005 B14.pdf PDF
Amendment 0004 Attachment 1 M-502 for PPI 153.pdf PDF
Amendment 0004 B14.pdf PDF
Amendment 0004 attachment 2 Amendment Dwgs.pdf PDF
Amendment 0003 - Enclosure (2) for PPI 17.xlsx XLSX spreadsheet
Amendment 0003 B14.pdf PDF
Amendment 0003 - Enclosure (3) for PPI 101.pdf PDF
Amendment 0002 B14.pdf PDF
Amendment 0001 B14.pdf PDF
Amendment 0001 - Attachment 1 - Revised Drawings Specs .pdf PDF
Amendment 0001 - Attachment G- Price Proposal Form REV .docx DOCX document
Amendment 0001 - Attachment 2 - Site Visit Sign-in Sheet.pdf PDF
B14 Drawings - Volume 2_SBD_03-28-24.pdf PDF
N4008524R2534 B14.pdf PDF
Attachment E-Small Business Participation Commitment Document.docx DOCX document
B14 Specifications_SBD_03-22-24.pdf PDF
Attachment H - PIEE Vendor Access Instructions.pdf PDF
Attachment F - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
Attachment D- Historical Small Business Utilization.docx DOCX document
B14 Drawings - Volume 1_SBD_03-28-24.pdf PDF
Attachment G - Price Proposal Form .docx DOCX document
Attachment K - SF 5512 site visit .pdf PDF
Attachment A - Pre-proposal Inquiry Form.xls XLS spreadsheet
Attachment C - Past Performance Questionnaire (Form PPQ).docx DOCX document
Attachment J - DBIDS Access Request Form.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs

|_| Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or Third Party sustainable certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information:

Attachment B (April 2022)
Page 2 of 2

File details come from the government source that posted it. Updated .