B14 Drawings - Volume 2_SBD_03-28-24.pdf
PDF 39 MB Posted
- Solicitation number
- N4008524R2534
About this file
This document appears to be drawings for a Design-Bid-Build (DBB) construction services contract for B14, New Stair/Life Safety/Power Improvements at the Portsmouth Naval Shipyard (PNSY) in Kittery, Maine. The project involves a complete interior renovation of the historic 22,705 square foot, four-story Building 14, including utility upgrades, egress/life safety/accessibility upgrades, exterior envelope repairs, structural upgrades, and hazardous materials abatement. Key scope elements include adding two internal code-compliant stairs, a building addition for an elevator and utility support spaces, restoring historic windows and masonry, overhauling mechanical/electrical/fire protection systems, and providing offices, lockers, conference rooms, and restrooms. The solicitation number is N4008524R2534, and the agency is the Department of the Navy Naval Facilities Engineering Command. No award date or pricing terms are provided in this document.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
KITTERY, ME
PORTSMOUTH NAVAL SHIPYARD
G-001B
SHEET NO. NAVFAC
DWG. NO.
PWD
DWG. NO. SHEET TITLE
GENERAL
CIVIL
STRUCTURAL
SHEET NO. NAVFAC
DWG. NO. SHEET TITLE
HAZARDOUS MATERIALS
ARCHITECTURAL
ARCHITECTURAL
PWD
DWG. NO.
LIST OF DRAWINGS - VOLUME 1
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
G-002C
PLUMBING
MECHANICAL
LIST OF DRAWINGS - VOLUME 2
SHEET NO. NAVFAC
DWG. NO.
PWD
DWG. NO. SHEET TITLE
FIRE PROTECTION
SHEET NO. NAVFAC
DWG. NO. SHEET TITLE
ELECTRICAL
PWD
DWG. NO.
GENERAL ELECTRICAL
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-002D
GENERAL CONSTRUCTION NOTESGENERAL HAZARDOUS MATERIALS NOTES GENERAL REMOVALS NOTES
DETAIL TITLE
BUILDING SECTION INDICATOR
GENERAL SYMBOLS LEGEND
B6
A1
A1
KEYNOTE INDICATORSWALL/PARTIAL BUILDING SECTION INDICATOR
INTERIOR ELEVATION INDICATOR
EXTERIOR ELEVATION INDICATOR ROOM IDENTIFIER
DETAIL INDICATOR
B6 B6
PLAN TITLE
B6
CONTRACT LINE ITEM NUMBERS (CLIN)
ABBREVIATIONS
GENERAL MASONRY
CLEANING/REPAIR/REPOINTING NOTES
OPTIONS
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-003B
PLUMBING LINE TYPE LEGEND
PLUMBING SYMBOLS LEGEND
GENERAL PLUMBING NOTES PLUMBING ABBREVIATIONS
P-001
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
PLUMBING REMOVALS PLAN
FIRST FLOOR UNDERSLAB
PLUMBING REMOVALS PLAN
FIRST FLOOR GRAPHIC SCALE
PD101
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
GENERAL NOTES
REMOVALS KEYNOTES
PLUMBING REMOVALS PLAN
SECOND FLOOR
PLUMBING REMOVALS PLAN
THIRD FLOOR
GRAPHIC SCALE
GENERAL NOTES
PD102
REMOVALS KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
UNDERSLAB PLUMBING PLAN
FIRST FLOOR
B3
A2
A2
GRAPHIC SCALE
GENERAL NOTES
P-101
DRAWING KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FIRST FLOOR PLUMBING PLAN
C3 C4
C2
C3
C2,C3
A5
GRAPHIC SCALE
GENERAL NOTES
P-102
DRAWING KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
A2
A3
A1
A4
D4D2
SECOND FLOOR PLUMBING PLAN
GRAPHIC SCALE
GENERAL NOTES
P-103
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
A2 A4
THIRD FLOOR PLUMBING PLAN
C4
GRAPHIC SCALE
GENERAL NOTES
P-104
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FOURTH FLOOR PLUMBING PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
GRAPHIC SCALE
GENERAL NOTES
P-105
KEYNOTES
ROOF PLUMBING PLAN
A4
A4
A3
A3
B1
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
GRAPHIC SCALE
P-106
PLUMBING PART PLAN 1
C2
FIRST FLOOR WATER SUPPLY
PLUMBING PART PLAN 2
C4
FIRST FLOOR WATER SUPPLY
SANITARY PLUMBING PART PLAN 2
C3
SECOND FLOOR WATER SUPPLY
PLUMBING PART PLAN 1
A1
SECOND FLOOR SANITARY
PLUMBING PART PLAN 1
A2
SECOND FLOOR WATER SUPPLY
PLUMBING PART PLAN 2A3
SECOND FLOOR SANITARY
PLUMBING PART PLAN 2
A4
FIRST FLOOR
B2
B5
D3
C4
GRAPHIC SCALE
GENERAL NOTES
P-401
DRAWING KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
A3,A4
A1,A2
C3,C4
KEYPLAN
PLUMBING PART PLAN 1
A4
THIRD FLOOR WATER SUPPLY
SANITARY PLUMBING PART PLAN 1
A2
THIRD FLOOR
SUPPLY PLUMBING PART PLAN
D4
SECOND FLOOR BREAK ROOM WATER
SANITARY PLUMBING PART PLAN
D2
SECOND FLOOR BREAK ROOM
C4
GRAPHIC SCALE
GENERAL NOTES
P-402
DRAWING KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
A2,A4
D2,D4
SANITARY PLUMBING PART PLAN 1
FIRST FLOOR
PLUMBING PART PLAN 2
C3
FIRST FLOOR WATER SUPPLY
GRAPHIC SCALE
GENERAL NOTES
P-403
DRAWING KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
C2,C3
PIPE HANGER ATTACHMENT DETAIL
D4
TMV-1 HI-LO MIXING VALVE
PIPING SCHEMATIC B2
PIPE SLEEVE THRU WALL A2
INLINE PUMP PIPING DETAIL D3PIPE HANGER ATTACHMENT DETAILSD2
PIPING SCHEMATIC B5
ELECTRIC WATER HEATER
B2
D3
ELEVATOR SUMP PUMP SP-1 DETAILB3
INSULATED PIPEBARE PIPE
PIPE SLEEVE THRU ELEVATED FLOORA3 SERVICE ENTRANCE DIAGRAM A5
INSULATED UNINSULATED
DOMESTIC WATER
B2
B5
P-501
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
INDIRECT WASTE PIPING DETAIL B2
DOWNSPOUT NOZZLE DETAIL C3
THRU-WALL
CONCRETE SLAB DETAIL C1
PRIMER ASSEMBLY SCHEMATIC C4
TRAP PRIMER TUBING THROUGH
TYPICAL ELECTRONIC TRAP
C1
P-502
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
PLUMBING FIXTURE ROUGH-IN SCHEDULE
BACKFLOW PREVENTER SCHEDULE
ELECTRIC WATER HEATER SCHEDULE
MIXING VALVE SCHEDULE
PUMP SCHEDULE
EXPANSION TANK SCHEDULE
TRAP PRIMER ASSEMBLY SCHEDULE
DRAIN SCHEDULE
P-601
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
SANITARY & VENT RISER DIAGRAMA3
P-701
DRAWING KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
MECHANICAL SYMBOLS LEGEND
MECHANICAL LINE TYPE LEGEND
MECHANICAL ABBREVIATIONS
M-001
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
THIRD FLOOR
MECHANICAL DUCTWORK REMOVALS PLAN
SECOND FLOOR
MECHANICAL DUCTWORK REMOVALS PLANDUCTWORK REMOVALS PART PLAN
C2
FIRST FLOOR MECHANICAL
DUCTWORK REMOVALS PART PLAN
A2
FIRST FLOOR MECHANICAL
GRAPHIC SCALE
MD101
REMOVALS KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
DUCTWORK REMOVALS PLAN
FOURTH FLOOR MECHANICAL
DUCTWORK REMOVALS PART PLAN
C5
FOURTH FLOOR MECHANICAL
C5
MECHANICAL ATTIC MECHANICAL
DUCTWORK REMOVALS PLAN
GRAPHIC SCALES
GENERAL NOTES
MD102
REMOVALS KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
MECHANICAL PIPING REMOVALS PLAN
MECHANICAL PIPING REMOVALS PLAN
GRAPHIC SCALE
MD103
REMOVALS KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FOURTH FLOOR
MECHANICAL PIPING REMOVALS PLAN
MECHANICAL PIPING REMOVALS PLAN
GRAPHIC SCALE
MD104
REMOVALS KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EXISTING KEYNOTES
GRAPHIC SCALE
MD105
REMOVALS KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
BLDG 14
SH
O
P
EXTERIOR MECHANICAL STEAM
AND CONDENSATE REMOVALS PLAN
MECHANICAL DUCTWORK PLAN
GRAPHIC SCALE
MH101
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
GRAPHIC SCALE
MH102
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
B5
MECHANICAL ROOM PART PLAN B5
ENLARGED
A2
MECHANICAL SECTION
A2
GRAPHIC SCALES
GENERAL NOTES
MH103
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FOURTH FLOOR
MECHANICAL DUCTWORK PART PLAN
C5
FOURTH FLOOR
C5
GRAPHIC SCALES
MH104
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
MECHANICAL ATTIC
GRAPHIC SCALE
MH105
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
MECHANICAL PIPING PLAN
A2
MECHANICAL ROOM PART PLAN
A2
C2
GRAPHIC SCALES
MP101
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
B5
UTILITY ROOM PART PLAN B5
SECOND FLOOR
GRAPHIC SCALE
MP102
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
KEYNOTES GENERAL NOTES
B5
MECHANICAL ROOM PART PLAN B5
ENLARGED THIRD FLOOR
MP103
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
GRAPHIC SCALES
GENERAL NOTES KEYNOTES
FOURTH FLOOR MECHANICAL PIPING PART PLANC5
FOURTH FLOOR
C5
GRAPHIC SCALES
MP104
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
MP105
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
BLDG 14
SH
O
P
EXTERIOR MECHANICAL STEAM
AND CONDENSATE PLAN
ENLARGED MECHANICAL STEAM
STEAM PIPING ISOMETRIC
A4
AND CONDENSATE PART PLAN
DUCT SUPPORT ATTACHMENTS DETAIL
C5
DUCT TRANSITIONS
TO AVOID OBSTRUCTIONS
A4
DIVERGING TEE
ECCENTRIC TRANSITION
CONNECTIONS TO RECTANGULAR MAIN
B2
TYPICAL ROUND BRANCH DUCT
ROUND DUCT HANGER DETAIL B3
RECTANGULAR DUCT TRANSITIONS DETAIL
C4
CONVERGING TEE
CONCENTRIC TRANSITION
DIFFUSER AND REGISTER RUNOUT DETAIL
C3
TYPICAL ROUND DUCT FITTINGS DETAIL
C2
FIRE DAMPER DETAIL
A2
LOUVER CONNECTION DETAIL
B4
M-501
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
PIPE HANGER ATTACHMENT DETAILS
C4
ATTACHMENT DETAIL
C5
PIPE HANGER SUSPENDED UNIT
DUCTLESS SPLIT SYSTEM ELEVATIONA5
INLINE PUMP PIPING DETAIL
B2
CONDENSATE TRAP DETAIL A3
A4
AIR CONTROL PIPING DIAGRAM
A2
CHILLED WATER SYSTEM
A4
NEGATIVE PRESSURE
FEEDER PIPING SCHEMATIC
A4
BYPASS CHEMICAL
PIPE SLEEVE THRU WALL
B4
B3
HEATER PIPING DETAIL
C3
EXCHANGER PIPING DETAIL
C2
STEAM TO HOT WATER HEAT
A4
AIR CONTROL PIPING DIAGRAM B3
A4
M-502
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
ELEVATION PLAN VIEW
MECHANICAL EQUIPMENT
C2
ATFP BRACING DETAIL FOR SUSPENDED
AIR COOLED CHILLER PIPING DETAIL
C5
DETAIL (TYP) A3
ASSEMBLY DETAIL
C4
ATFP CABLE BRACING
FAN/BLOWER COIL UNIT PIPING
M-503
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
SECTION
CONDENSATE IN UTILITY DUCT C5WITH CONDENSATE RETURN C2
PIPE ANCHOR DETAIL
A2 ROLLER SUPPORT DETAIL A3 SLIDE SUPPORT DETAIL A5
STEAM ANDTRAP ASSEMBLY DETAIL
M-504
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
GENERAL SHEET NOTE
LOUVER SCHEDULE
DUCTWORK CONSTRUCTION AND LEAKAGE TESTING SCHEDULE
SPLIT SYSTEM AC UNIT SCHEDULE
AIR COOLED CHILLER SCHEDULE PUMP SCHEDULE
EXHAUST FAN SCHEDULE
AIR COOLED CONDENSING UNIT SCHEDULE
DEDICATED OUTSIDE AIR UNIT WITH ENERGY RECOVERY SCHEDULE
STEAM-TO-WATER HEAT EXCHANGER SCHEDULE
PRESSURE REDUCING VALVE SCHEDULE
CONDENSATE RECEIVER SCHEDULE
M-601
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
HOT WATER UNIT HEATER SCHEDULE
FAN COIL UNIT SCHEDULE
DIFFUSER / REGISTER SCHEDULE
HOT WATER CABINET UNIT HEATER SCHEDULE
EXPANSION TANK SCHEDULE
AIR SEPARATOR SCHEDULE
GLYCOL FEED UNIT SCHEDULE
GLYCOL SCHEDULE
CONVECTOR SCHEDULE
M-602
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
CONTROL SYSTEM GENERAL NOTES
LIFT HERE
SHUTDOWN
NORMAL
R
G
DIRECT DIGITAL CONTROL SYSTEM ARCHITECTUREB2
ATFP FORCE PROTECTION SHUTDOWN BUTTON DETAILA4
FORCE PROTECTION POINTS LIST
FORCE PROTECTION CONTROL DIAGRAMA5
A4
POINTS LIST
HRV-E1 CONTROL DIAGRAM
A2
M-701
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
CHILLED WATER SYSTEM POINTS LIST
CHILLED WATER SYSTEM CONTROL DIAGRAM
A4
TYPICAL CLEAN AGENT EXHAUST
SYSTEM POINTS LIST
SPRINKLER ROOM EXHAUST
FAN CONTROL DIAGRAM
A2
M-702
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
TYPICAL 2 - PIPE FAN AND
BLOWER COIL CONTROL DIAGRAMA5
FAN AND BLOWER COIL POINTS LIST
TYPICAL ENERGY RECOVERY VENTILATOR
CONTROL DIAGRAM
A2
ENERGY RECOVERY VENTILATOR UNIT POINTS LIST
M-703
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
TYPICAL UNIT HEATER POINTS LIST
TYPICAL UNIT HEATER CONTROL DIAGRAMC4 UNIT CONTROL DIAGRAM C5
TYPICAL DUCTLESS AIR CONDITIONING
CONDITIONING UNIT POINTS LIST
TYPICAL DUCTLESS AIR
DOMESTIC WATER HEATER POINTS LIST
DOMESTIC WATER HEATER
CONTROL DIAGRAM A5
BUILDING GLOBAL
POINTS CONTROL DIAGRAM
A4
GLOBAL BUILDING POINTS LIST
HEATING SYSTEM POINTS LIST
HEATING SYSTEM CONTROL DIAGRAM
A2
M-704
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
B14
B45B76B92
B178
SHOP 99
B13
HYDRANT #38
(FLOW)
HYDRANT #7
(RESIDUAL)
HYDRANT #6
(FLOW)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
FX001
GRAPHIC SCALE
GENERAL FIRE SUPPRESSION NOTES
HYDRANT LOCATION PLAN
APPLICABLE CODES AND STANDARDS
FIRE SUPPRESSION LINE TYPE LEGEND
HYDRANT FLOW TEST DATA
FIRE SUPPRESSION ABBREVIATIONS
FIRE SUPPRESSION SYMBOLS LEGEND
GENERAL FIRE SUPPRESSION NOTES
FIRST FLOOR FIRE SUPPRESSION PLAN
GENERAL NOTES
KEYNOTES
C1
B2
A1
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX101
SECOND FLOOR FIRE SUPPRESSION PLAN
GENERAL NOTES
KEYNOTES
C2
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX102
THIRD FLOOR FIRE SUPPRESSION PLAN
GENERAL NOTES
KEYNOTES
C3
A3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX103
FOURTH FLOOR FIRE SUPPRESSION PLAN
GENERAL NOTES
KEYNOTES
C4
A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX104
ATTIC FIRE SUPPRESSION PLAN
GENERAL NOTES
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX105
ENLARGED SPRINKLER ENTRANCE B2
GENERAL NOTES
KEYPLAN
KEYNOTES
SPRINKLER ENTRANCE 132 ELEVATIONC4
SPRINKLER ENTRANCE 132 ELEVATIONA4
B2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX401
FIRST FLOOR STANDPIPE PLANC1 SECOND FLOOR STANDPIPE PLANC2 THIRD FLOOR STANDPIPE PLANC3 FOURTH FLOOR STANDPIPE PLAN C4
A1 A2
A3 A4
C1 C2 C3 C4
KEYNOTES
STAIR 001 STAIR 001 STAIR 001 STAIR 001
GENERAL NOTES
A2
A4
A4
A4 A4
A2 A2 A2
A1 A2 A3 A4FIRST FLOOR STANDPIPE PLAN SECOND FLOOR STANDPIPE PLAN THIRD FLOOR STANDPIPE PLAN FOURTH FLOOR STANDPIPE PLAN
STAIR 004 STAIR 004 STAIR 004 STAIR 004
A4 A4 A4 A4
A2 A2 A2 A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX402
GRAPHIC SCALESTAIR 001 STANDPIPE SECTION A2
GENERAL NOTES
STAIR 001 STANDPIPE SECTION A4
A2
A4
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX403
GENERAL NOTES
STAIR 004 STANDPIPE SECTION A2
A2
STAIR 004 STANDPIPE SECTION A4
A4
KEYNOTE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX404
VALVE TEST ASSEMBLY
CONNECTION DETAIL
A2
FIRE DEPARTMENT
TYP WET SYSTEM ZONE
KEYNOTE
GENERAL NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX501
KEYPLAN
B4
FIRST FLOOR FIRE SUPPRESSION PLAN [OPTION 3]B4
LEGEND
KEYNOTE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FX901
GENERAL FIRE ALARM AND
APPLICABLE CODES AND STANDARDS
FIRE ALARM AND MASS
NOTIFICATION ABBREVIATIONS
GENERAL FIRE ALARM AND
NOTIFICATION SYMBOLS LEGEND
FIRE ALARM AND MASS
FIRE ALARM AND MASS
MASS NOTIFICATION NOTES NOTIFICATION LINETYPE LEGENDMASS NOTIFICATION NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FA001
FIRST FLOOR FIRE ALARM REMOVALS PLANA2
SECOND FLOOR FIRE ALARM REMOVALS PLANC2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FD101
THIRD FLOOR FIRE ALARM REMOVALS PLANA2
FOURTH FLOOR FIRE ALARM REMOVALS PLANC2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FD102
ATTIC FIRE ALARM REMOVALS PLAN
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FD103
FIRST FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN
GENERAL NOTES
KEYNOTES
LEGEND
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FA101
SECOND FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN
GENERAL NOTE
KEYNOTES
LEGEND
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FA102
THIRD FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN
GENERAL NOTE
KEYNOTES
LEGEND
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FA103
FOURTH FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN
GENERAL NOTE
KEYNOTES
LEGEND
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FA104
ATTIC FIRE ALARM AND MASS NOTIFICATION PLAN
GENERAL NOTE
LEGEND
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FA105
CONSOLIDATED FIRE ALARM AND MASS NOTIFICATION RISER DIAGRAMC3
SYSTEM INPUTS
SYSTEM OUTPUTS GENERAL SHEET NOTES
INPUT/OUTPUT MATRIX A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FA501
GENERAL NOTE
KEYPLAN
B4
FIRST FLOOR FIRE ALARM PLAN [OPTION 3]B4
LEGEND
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FA901
RECEPTACLESLIGHTING
ELECTRICAL SYMBOLS
TELEPHONE AND DATA
ONE-LINE DIAGRAM
GENERAL
LINE TYPE LEGEND
SECURITY
ELECTRICAL ABBREVIATIONS ELECTRICAL GENERAL NOTES
SWITCH LINE TYPE LEGEND
MISC ELECTRICAL DEVICES SCHEDULE
ELEVATOR LANDING
TWO-WAY COMMUNICATION SYSTEM
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
E-001
FIRST FLOOR ELECTRICAL REMOVALS PLAN
SECOND FLOOR ELECTRICAL REMOVALS PLAN
ELECTRICAL REMOVALS POWER PLANC4
FIRST FLOOR ELECTRICAL ROOM PARTIAL
C4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ED101
GRAPHIC SCALES
GENERAL SHEET NOTE
THIRD FLOOR ELECTRICAL REMOVALS PLAN
FOURTH FLOOR ELECTRICAL REMOVALS PLAN
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ED102
GRAPHIC SCALE
GENERAL SHEET NOTE
ATTIC ELECTRICAL REMOVALS PLAN
ROOF ELECTRICAL REMOVALS PLAN
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ED103
GRAPHIC SCALE
GENERAL SHEET NOTES
ONE-LINE DIAGRAM - REMOVALS
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ED501
REMOVALS KEYNOTES
GENERAL NOTE
EXISTING KEYNOTE
NO PARKING
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ES101
ELECTRICAL SITE PLAN
GRAPHIC SCALE
BLDG 14
GENERAL SHEET NOTES
PHASING NOTES
BLDG 45BLDG 76S
MACDONOUGH AVE
SHOP 99
LEGEND
FIRE LANE
NO PARKING
NO PARKING
NO PARKING
FIRE LANE
FIR
E LA
NE
FIR
E LA
NE
NO
PA
RK
ING
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ES102
TELECOMMUNICATIONS SITE PLAN
GRAPHIC SCALE
BLDG 14
BLDG 178
GENERAL NOTES
BLDG 45BLDG 76
BLDG 13
REMEY ST
MACDONOUGH AVE
SHOP 99
R-178
BLDG 20 BLDG 22
BLDG 86
BLDG 86A
REMOVAL NOTESKEYNOTE
FIRST FLOOR POWER PLAN
NETWORK ROOM 105 DETAILA2
A2
OPTION 3 FIRST FLOOR POWER PLANA4
A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP101
GRAPHIC SCALES
SECOND FLOOR POWER PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP102
GRAPHIC SCALE
THIRD FLOOR POWER PLAN
BREAK ROOM 305 DETAIL A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP103
GRAPHIC SCALES
FOURTH FLOOR POWER PLAN
NETWORK 412 POWER PLAN A2
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP104
GRAPHIC SCALES
ROOF ELECTRICAL PLAN
ATTIC ELECTRICAL PLAN
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP105
GRAPHIC SCALE
GENERAL NOTES
KEYNOTE
EXISTING KEYNOTE
WIRING SCHEDULE
ONE-LINE DIAGRAMA2
TRANSFORMER GROUNDING DETAILC5
GROUNDING ELECTRODE SYSTEM DETAILC3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP501
GENERAL SHEET NOTES
POWER CONNECTION DETAIL ( )C2
SYSTEMS FURNITURE FLOOR BOX
POWER CONNECTION DETAIL ( )C4
SYSTEMS FURNITURE WALL BOX
SYSTEMS FURNITURE WIRING DETAIL (8-WIRE)B2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
EP502
MECHANICAL AND PLUMBING EQUIPMENT WIRING SCHEDULE
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP503
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP601
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP602
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP603
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EP604
KEYNOTE
FIRST FLOOR LIGHTING PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EL101
GRAPHIC SCALE
SECOND FLOOR LIGHTING PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EL102
GRAPHIC SCALE
THIRD FLOOR LIGHTING PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EL103
GRAPHIC SCALE
FOURTH FLOOR LIGHTING PLAN
ATTIC LIGHTING PLAN N
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EL104
GRAPHIC SCALE
LIGHTING FIXTURE SCHEDULE
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EL701
GENERAL SHEET NOTESLIGHTING FIXTURE SCHEDULE NOTES
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
EL702
B2CONFERENCE ROOM LIGHTING CONTROL DIAGRAM
TYPICAL INDIVIDUAL OFFICE AND
LIGHTING BYPASS RELAY CONTROL DIAGRAMA2
B5TYPICAL OPEN OFFICE LIGHTING CONTROL PANELS DIAGRAM
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
EL703
FIRST FLOOR TECHNOLOGY PLAN
NETWORK 105 TECHNOLOGY PLANA2
A2
OPTION 3 FIRST FLOOR TECHNOLOGY PLANA4
A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ET101
SECOND FLOOR TECHNOLOGY PLAN
FLOOR BOX SCHEDULE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ET102
THIRD FLOOR TECHNOLOGY PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ET103
GRAPHIC SCALE
GENERAL NOTE
FOURTH FLOOR TECHNOLOGY PLAN
NETWORK 412 TECHNOLOGY PLANA2
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
ET104
GRAPHIC SCALES
NETWORK N RISER DIAGRAMA4
NETWORK P RISER DIAGRAMA2
KEYNOTES
BUILDING 86 - NETWORK N SECOND FLOOR TECHNOLOGY PLANB4
BUILDING 86 - NETWORK N BASEMENT TECHNOLOGY PLANC2
GRAPHIC SCALE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
ET501
TELEPHONE RISER DIAGRAM A2
NETWORK C RISER DIAGRAMA3
B13 FIRST FLOOR TECHNOLOGY PART PLANC4B13 BASEMENT TECHNLOGY PART PLANC2
KEYPLAN
GRAPHIC SCALE
KEYPLAN
C2 C4
BUILDING 13
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
ET502
CAT 6CAT 6
CAT 6
CAT 6
CAT 6
00014-0105-002
138-1-3F
FIBER
TELEPHONE OUTLET FACEPLATE ( )A5NETWORK P OUTLET FACEPLATE ( )A3NETWORK N COMMUNICATIONS OUTLET FACEPLATE ( )A2
COMMUNICATIONS OUTLET LABELINGC3 NETWORK C OUTLET FACEPLATE ( )C5
TELECOMMUNICATIONS PATHWAY DETAILB2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
ET503
SECTION
TYPICAL FLOOR BOX INSTALLATION DETAIL B3
DATA CABINET PATCH PANEL DETAILB5
TV MONITOR AND HDMI STATION INSTALLATION DETAILA5ELEVATOR LANDING TWO-WAY COMUNICATIONS SYSTEM RISER DIAGRAMA4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
ET504
FIRST FLOOR SECURITY PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EY101
GRAPHIC SCALE
SECOND FLOOR SECURITY PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EY102
THIRD FLOOR SECURITY PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EY103
FOURTH FLOOR SECURITY PLAN
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
EY104
ESS ONE-LINE DIAGRAM B4
SYSTEM (AACS) AND INTRUSION DETECTION SYSTEM (IDS)A2
TYPICAL DOOR AUTOMATED ACCESS CONTROL N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
M
ID
-A
TL
A
N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
EY501
DOOR CONTACT SWITCH INSTALLATION DETAIL
C4
INTRUSION DETECTION AND ACCESS CONTROL
SYSTEM EQUIPMENT SCHEDULE
KEYNOTE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
EY502
| 06_GENERAL |
| G-001B COVER SHEET - VOLUME 2 |
| G-002C LIST OF DRAWINGS - VOLUME 1 |
| G-002D LIST OF DRAWINGS - VOLUME 2 |
| G-003B ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES |
| 07_PLUMBING |
| P001 PLUMBING GENERAL NOTES, LEGENDS AND ABBREVIATIONS |
| PD101 UNDERSLAB AND FIRST FLOOR PLUMBING REMOVALS PLANS |
| PD102 SECOND AND THIRD FLOOR PLUMBING REMOVALS PLANS |
| P-101 UNDERSLAB PLUMBING PLAN |
| P-102 FIRST FLOOR PLUMBING PLAN |
| P-103 SECOND FLOOR PLUMBING PLAN |
| P-104 THIRD FLOOR PLUMBING PLAN |
| P-105 FOURTH FLOOR PLUMBING PLAN |
| P-106 ROOF PLUMBING PLAN |
| P-401 ENLARGED PLUMBING PART PLANS 1 |
| P-402 ENLARGED PLUMBING PART PLANS 2 |
| P-403 ENLARGED PLUMBING PART PLANS 3 |
| P-501 PLUMBING DETAILS 1 |
| P-502 PLUMBING DETAILS 2 |
| P-601 PLUMBING SCHEDULES 1 |
| P-701 PLUMBING RISER DIAGRAM 1 |
| 08_MECHANICAL |
| M-001 MECHANICAL LEGENDS AND ABBREVIATIONS |
| MD101 FIRST, SECOND, AND THIRD FLOOR MECHANICAL DUCTWORK REMOVALS PLANS |
| MD102 FOURTH FLOOR AND ATTIC MECHANICAL DUCTWORK REMOVALS PLANS |
| MD103 FIRST AND SECOND FLOOR MECHANICAL PIPING REMOVALS PLANS |
| MD104 THIRD AND FOURTH FLOOR MECHANICAL REMOVALS PLANS |
| MD105 EXTERIOR MECHANICAL STEAM AND CONDENSATE REMOVALS PLAN |
| MH101 FIRST FLOOR MECHANICAL DUCTWORK PLAN |
| MH102 SECOND FLOOR MECHANICAL DUCTWORK PLAN |
| MH103 THIRD FLOOR MECHANICAL DUCTEWORK PLAN |
| MH104 FOURTH FLOOR MECHANICAL DUCTWORK PLAN |
| MH105 ATTIC MECHANICAL DUCTWORK PLANS |
| MP101 FIRST FLOOR MECHANICAL PIPING PLAN |
| MP102 SECOND FLOOR MECHANICAL PIPING PLAN |
| MP103 THIRD FLOOR MECHANICAL PIPING PLAN |
| MP104 FOURTH FLOOR MECHANICAL PIPING PLAN |
| MP105 EXTERIOR MECHANICAL STEAM AND CONDENSATE PLANS |
| M-501 MECHANICAL DETAILS 1 |
| M-502 MECHANICAL DETAILS 2 |
| M-503 MECHANICAL DETAILS 3 |
| M-504 EXTERIOR MECHANICAL DETAILS |
| M-601 MECHANICAL SCHEDULES 1 |
| M-602 MECHNICAL DETAILS 2 |
| M-701 CONTROL DIAGRAMS 1 |
| M-702 CONTROL DIAGRAMS 2 |
| M-703 CONTROL DIAGRAMS 3 |
| M-704 CONTROL DIAGRAMS |
| 09_FIRE PROTECTION |
| FX001 FIRE SUPPRESSION NOTES, LEGENDS, AND ABBREVIATIONS |
| FX101 FIRST FLOOR FIRE SUPPRESSION PLAN |
| FX102 SECOND FLOOR FIRE SUPPRESSION PLAN |
| FX103 THIRD FLOOR FIRE SUPPRESSION PLAN |
| FX104 FOURTH FLOOR FIRE SUPPRESSION PLAN |
| FX105 ATTIC FIRE SUPPRESSION PLAN |
| FX401 FIRE SUPPRESSION PARTIAL PLANS AND ELEVATIONS |
| FX402 FIRE SUPPRESSION STANDPIPES STAIR PLANS |
| FX403 STAIR 001 STANDPIPE SECTIONS |
| FX404 STAIR 004 STANDPIPE SECTIONS |
| FX501 FIRE SUPPRESSION DETAILS |
| FX901 FIRST FLOOR FIRE SUPPRESSION PLAN [OPTION 3] |
| FA001 GENERAL FIRE ALARM AND MASS NOTIFICATION NOTES, LEGENDS, AND ABBREVIATIONS |
| FD101 FIRST AND SECOND FLOOR FIRE ALARM REMOVALS PLANS |
| FD102 THIRD AND FOURTH FLOOR FIRE ALARM REMOVALS PLANS |
| FD103 ATTIC FIRE ALARM REMOVALS PLAN |
| FA101 FIRST FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN |
| FA102 SECOND FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN |
| FA103 THIRD FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN |
| FA104 FOURTH FLOOR FIRE ALARM AND MASS NOTIFICATION PLAN |
| FA105 ATTIC FIRE ALARM AND MASS NOTIFICATION PLAN |
| FA501 FIRE ALARM AND MASS NOTIFICATION PLAN |
| FA901 FIRST FLOOR FIRE ALARM PLAN [OPTION 3] |
| 10_ELECTRICAL |
| E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES |
| ED101 FIRST AND SECOND FLOOR ELECTRICAL REMOVALSPLANS |
| ED102 THIRD AND FOURTH FLOOR ELECTRICAL REMOVALS PLANS |
| ED103 ATTIC ELECTRICAL REMOVALS PLAN |
| ED501 ONE-LINE DIAGRAM-REMOVALS |
| ES101 ELECTRICAL SITE PLAN |
| ES102 TELECOMMINICATIONS SITE PLAN |
| EP101 FIRST FLOOR POWER PLAN |
| EP102 SECOND FLOOR POWER PLAN |
| EP103 THIRD FLOOR POWER PLAN |
| EP104 FOURTH FLOOR POWER |
| EP105 ATTIC AND ROOF ELECTRICAL PLANS |
| EP501 ONE-LINE DIAGRAM |
| EP502 POWER DETAILS |
| EP503 EQUIPMENT WIRING SCHEDULE |
| EP601 PANELBOARD SCHEDULE 1 |
| EP602 PANELBOARD SCHEDULE 2 |
| EP603 PANELBOARD SCHEDULES 3 |
| EP604 PANELBOARD SCHEDULES 4 |
| EL101 FIRST FLOOR LIGHTING PLAN |
| EL102 SECOND FLOOR LIGHTING PLAN |
| EL103 THIRD FLOOR LIGHTING PLAN |
| EL104 FOURTH FLOOR LIGHTING PLAN |
| EL701 LIGHTING FIXTURE SCHEDULE AND DETAILS |
| EL702 LIGHTING FIXTURE DETAILS |
| EL703 LIGHTING CONTROL DIAGRAMS |
| ET101 FIRST FLOOR TECHNOLOGY PLAN |
| ET102 SECOND FLOOR TECHNOLOGY PLAN |
| ET103 THIRD FLOOR TECHNOLOGY PLAN |
| ET104 FOURTH FLOOR TECHNOLOGY PLAN |
| ET501 BUILDING 86 TECHNOLOGY PART PLANS AND TECHNOLOGY DETAILS 1 |
| ET502 BUILDING 13 TECHNOLOGY PART PLANS AND TECHNOLOGY DETAILS 2 |
| ET503 TECHNOLOGY DETAILS 3 |
| ET504 TECHNOLOGY DETAILS 4 |
| EY101 FIRST FLOOR SECURITY PLAN |
| EY102 SECOND FLOOR SECURITY PLAN |
| EY103 THIRD FLOOR SECURITY PLAN |
| EY104 FOURTH FLOOR SECURITY PLAN |
| EY501 B14 SECURITY ONE-LINE DIAGRAM AND DETAILS |
| EY502 ACCESS CONTROL SYSTEM, SCHEDULE, NOTES, AND DETAIL |
| 2024-03-28T11:55:45-0400 | |
| MERCER.CHELSEA.ANN.1618149796 |
File details come from the government source that posted it. Updated .