B14 Drawings - Volume 1_SBD_03-28-24.pdf
PDF 41 MB Posted
- Solicitation number
- N4008524R2534
About this file
The provided document is a set of drawings, titled "B14 Drawings - Volume 1_SBD_03-28-24.pdf," related to a federal contract opportunity for the Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements at the Portsmouth Naval Shipyard (PNSY) in Kittery, Maine.
The project involves a total interior renovation of the four-story, 22,705 square foot historic Building 14, which is in need of utility upgrades, egress/fire life safety/accessibility compliance upgrades, exterior envelope repairs, structural upgrades, and the removal of lead paint and asbestos materials. The scope of work includes hazardous material removal and remediation, modifications to the building's floors and supporting structure, the addition of two code-compliant internal stairs and a building addition to house an elevator, stair, and utility support spaces, the restoration of historic windows and masonry, the provision of a lightning protection system, and a complete overhaul of the building's mechanical, electrical, and fire protection systems.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
KITTERY, ME
PORTSMOUTH NAVAL SHIPYARD
G-001A
SHEET NO. NAVFAC
DWG. NO.
PWD
DWG. NO. SHEET TITLE
GENERAL
CIVIL
STRUCTURAL
SHEET NO. NAVFAC
DWG. NO. SHEET TITLE
HAZARDOUS MATERIALS
ARCHITECTURAL
ARCHITECTURAL
PWD
DWG. NO.
LIST OF DRAWINGS - VOLUME 1
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
G-002A
PLUMBING
MECHANICAL
LIST OF DRAWINGS - VOLUME 2
SHEET NO. NAVFAC
DWG. NO.
PWD
DWG. NO. SHEET TITLE
FIRE PROTECTION
SHEET NO. NAVFAC
DWG. NO. SHEET TITLE
ELECTRICAL
PWD
DWG. NO.
GENERAL ELECTRICAL
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-002B
GENERAL CONSTRUCTION NOTESGENERAL HAZARDOUS MATERIALS NOTES GENERAL REMOVALS NOTES
DETAIL TITLE
BUILDING SECTION INDICATOR
GENERAL SYMBOLS LEGEND
B6
A1
A1
KEYNOTE INDICATORSWALL/PARTIAL BUILDING SECTION INDICATOR
INTERIOR ELEVATION INDICATOR
EXTERIOR ELEVATION INDICATOR ROOM IDENTIFIER
DETAIL INDICATOR
B6 B6
PLAN TITLE
B6
CONTRACT LINE ITEM NUMBERS (CLIN)
ABBREVIATIONS
GENERAL MASONRY
CLEANING/REPAIR/REPOINTING NOTES
OPTIONS
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-003A
CONSTRUCTION SEQUENCE STRATEGY
GENERAL CONSTRUCTION SEQUENCE NOTES WATER SERVICE SEQUENCEELECTRICAL SERVICE SEQUENCEGENERAL CONSTRUCTION SEQUENCE
TELECOMMUNICATIONS SEQUENCE
RAILROAD IMPACT SEQUENCE
SITE PHASING SEQUENCE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-004
FIRE LANE
NO PARKING
NO PARKING
NO PARKING
FIRE LANE
FIR
E LA
NE
FIR
E LA
NE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
G-005
SITE CONSTRAINTS AND REQUIREMENTS PLAN - PHASE 1
GRAPHIC SCALE
BLDG 14
BLDG 178
GENERAL SHEET NOTES
BLDG 45BLDG 76
BLDG 13
SARATOGA
SQ
REMEY ST
MACDONOUGH AVE
SHOP 99
PORTSMOUTH
SQ
BLDG
R-178
BLDG 92
LEGEND
KEYNOTES GENERAL SHEET NOTES
NO PARKING
NO PARKING
FIRE LANE
FIR
E LA
NE
FIR
E LA
NE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
G-006
SITE CONSTRAINTS AND REQUIREMENTS PLAN - PHASE 2
GRAPHIC SCALE
BLDG 14
BLDG 178
GENERAL SHEET NOTES
BLDG 45BLDG 76
BLDG 13
SARATOGA
SQ
REMEY ST
MACDONOUGH AVE
SHOP 99
PORTSMOUTH
SQ
BLDG
R-178
BLDG 92
KEYNOTES
NO PARKING
NO PARKING
FIRE LANE
FIR
E LA
NE
FIR
E LA
NE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
G-007
UTILITIES OUTAGE PLAN - WATER AND STEAM
GRAPHIC SCALE
BLDG 14
BLDG 178
GENERAL SHEET NOTES
BLDG 45BLDG 76
BLDG 13
SARATOGA
SQ
REMEY ST
MACDONOUGH AVE
SHOP 99
PORTSMOUTH
SQ
BLDG
R-178
BLDG 92
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
TYPE 1 CONSTRUCTION BARRIER
TYPE 3 CONSTRUCTION BARRIER
TYPE 2 CONSTRUCTION BARRIER
CONSTRUCTION BARRIER SIGN
GENERAL CONSTRUCTION BARRIER NOTES
G-008
OUTAGE SCHEDULE GENERAL NOTE
OUTAGE SCHEDULE NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-009
CODE COMPLIANCE SITE PLAN
GENERAL FIRE PROTECTION CODE INFORMATION
KEYNOTES
FIRE LANE
NO PARKING
NO PARKING
NO PARKING
FIRE LANE
FIR
E LA
NE
FIR
E LA
NE
GENERAL NOTE
LEGEND
GRAPHIC SCALE
ABBREVIATIONS
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
G-101
BLDG 14
BLDG 178
BLDG 45BLDG 76
BLDG 13
SARATOGA
SQ
REMEY ST
MACDONOUGH AVE
SHOP 99
PORTSMOUTH
SQ
BLDG
R-178
BLDG 92
LIFE SAFETY AND BUILDING CODE SUMMARY (UFC 3-600-01, NFPA, AND IBC)
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-102
FIRST FLOOR CALCULATED OCCUPANT LOAD AND EGRESS CAPACITY
FOURTH FLOOR CALCULATED OCCUPANT LOAD AND EGRESS CAPACITY
THIRD FLOOR CALCULATED OCCUPANT LOAD AND EGRESS CAPACITY
SECOND FLOOR CALCULATED OCCUPANT LOAD AND EGRESS CAPACITY
GENERAL NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-103
FIRST FLOOR LIFE SAFETY PLAN
GRAPHIC SCALE
GENERAL NOTES
KEYNOTES
LIFE SAFETY SYMBOLS LEGEND
FIRE RATING LEGEND
FIRE RATING SYMBOLS LEGEND
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-104
SECOND FLOOR LIFE SAFETY PLAN
GENERAL NOTES
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-105
THIRD FLOOR LIFE SAFETY PLAN
GENERAL NOTES
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-106
FOURTH FLOOR LIFE SAFETY PLAN
GENERAL NOTES
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-107
ATTIC LIFE SAFETY PLAN
GENERAL NOTES
KEYNOTE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-108
GENERAL NOTES
KEYPLAN
B4
PARTIAL FIRST FLOOR LIFE SAFETY PLAN [OPTION 3]B4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
G-901
FIRST FLOOR HAZARDOUS MATERIALS REMOVALS PLANA2
SECOND FLOOR HAZARDOUS MATERIALS REMOVALS PLANC2
REMOVALS GENERAL NOTES
HAZARDOUS MATERIALS REMOVALS
LEGEND
GENERAL NOTES KEYNOTES
HAZARDOUS MATERIALS
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
HM101
GENERAL NOTE
THIRD FLOOR HAZARDOUS MATERIALS REMOVALS PLANA2
FOURTH FLOOR HAZARDOUS MATERIALS REMOVALS PLANC2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
HM102
ROOF HAZARDOUS MATERIALS REMOVALS PLAN
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
HM103
NO PARKING
NO PARKING
FIRE LANE
FIR
E LA
NE
FIR
E LA
NE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
CX101
SITE EXISTING CONDITIONS PLAN
GRAPHIC SCALE
BLDG 14
BLDG 178
GENERAL SHEET NOTES
EXISTING KEYNOTES
BLDG 45BLDG 76
BLDG 13
SARATOGA
SQ
REMEY ST
MACDONOUGH AVE
SHOP 99
PORTSMOUTH
SQ
BLDG
R-178
BLDG 92
EXIST SANITARY STRUCTURE SCHEDULE
EXIST DRAIN STRUCTURE SCHEDULE
NO PARKING
FIRE LANE
FIR
E LA
NE
FIR
E LA
NE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
CS101
GRAPHIC SCALE
BLDG 14
BLDG 178
GENERAL SHEET NOTES
SARATOGA
SQ
REMEY ST
MACDONOUGH AVE
PORTSMOUTH
SQ
R-178 BUILDING
ADDITION
KEYNOTES
SITE AND UTILITIES PLAN
SANITARY STRUCTURE SCHEDULEKEYNOTES
NO PARKING
FIRE LANE
FIR
E LA
NE
FIR
E LA
NE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
CG101
GRADING, DRAINAGE AND EROSION CONTROL PLAN
BLDG 14
BLDG 178
GENERAL SHEET NOTES
KEYNOTES
SARATOGA
SQ
REMEY ST
PORTSMOUTH
SQ
R-178 BUILDING
ADDITION
DRAIN STRUCTURE SCHEDULE
LEGEND
MACDONOUGH AVE
STRUCTURAL NOTES
CONCRETE
STRUCTURAL STEEL
STEEL DECK
GRATING
WOOD
REINFORCING STEEL LAP SPLICE SCHEDULE
POST INSTALLED ANCHORS
MASONRY
COLD-FORMED STEEL
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
S-001
EXISTING WOOD FRAMING JACKING NOTES
STRUCTURAL ABBREVIATIONS:
POUR STOP SCHEDULE
TEMPORARY SHORING NOTESSTRUCTURAL GENERAL NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
S-002
BUILDING DESIGN LOADS (EXISTING BUILDING) BUILDING DESIGN LOADS (STAIR TOWER)RAILROAD DESIGN LOADS
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
S-003
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SD101
GRAPHIC SCALE
GENERAL NOTES
FOUNDATION REMOVALS PLAN B3
EXISTING KEYNOTES
REMOVALS KEYNOTES
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SD102
GRAPHIC SCALE
GENERAL NOTES
SLAB REMOVALS PLAN B3
REMOVALS KEYNOTES
FLOOR ELEVATION
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SD103
GRAPHIC SCALE
GENERAL NOTES EXISTING KEYNOTES REMOVALS KEYNOTES
SECOND FLOOR FRAMING REMOVALS PLAN B3
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SD104
GRAPHIC SCALE
GENERAL NOTES EXISTING KEYNOTES REMOVALS KEYNOTES
THIRD FLOOR FRAMING REMOVALS PLAN B3
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SD105
GRAPHIC SCALE
GENERAL NOTES EXISTING KEYNOTES REMOVALS KEYNOTES
FOURTH FLOOR FRAMING REMOVALS PLAN B3
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SD106
GRAPHIC SCALE
GENERAL NOTE EXISTING KEYNOTES REMOVALS KEYNOTES
ROOF FRAMING REMOVALS PLAN B3
B2
A2
A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SB101
GRAPHIC SCALES
GENERAL NOTES
FOUNDATION PLAN A3
KEYNOTES
FOOTING SCHEDULE
STOOP/CANOPY FND PLAN A2
B3
C4
C3
C2 B3
C2 C5
C5
B5
A2
A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SB102
GRAPHIC SCALE
GENERAL NOTES
SLAB PLAN A3
TYP ADDITION 1'-2" FND WALL DETAIL C2 TYP ADDITION REINF CONC PIER DETAILC3
C5TYP ADDITION 8" FND WALL DETAIL
TYP CONTROL JOINT DETAIL B2
TYP SLAB-ON-GROUND DETAIL AT DOOR OPENINGB3
C5
TYP ELEVATOR SUMP PIT DETAIL B5
C2
TYP RADON PIT DETAIL A2
TYP CANOPY CONC PIER DETAIL A4
C3
C2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SB501
GRAPHIC SCALES
C2TYP ADDITION REINF CONC STOOP DETAIL
C4TYP INT REINF CONC FTG/PIER DETAIL
B2TYP INT STAIRWELL FND WALL DETAIL
TYP ELEVATOR PIT LADDER DETAILC5
B3TYP THICKENED SLAB EDGE DETAIL TYP STEP FOOTING DETAIL B5
A2TYP THICKENED SLAB AT ELEV MACHINE ROOM DETAIL TYP EQUIPMENT HOUSEKEEPING PAD DETAILA4 N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SB502
FOUNDATION REMOVALS PLAN [OPTION 3]B2
GENERAL NOTE
KEYNOTE
KEYPLAN
B4B2
FOUNDATION PLAN [OPTION 3] B4
LEGEND
REMOVALS KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
SB901
SLAB REMOVALS PLAN [OPTION 3] B2
GENERAL NOTE
KEYNOTES
KEYPLAN
B4B2
SLAB PLAN [OPTION 3] B4
LEGEND
REMOVALS KEYNOTE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
SB902
C5
B2
A3
D2 B5
A5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF101
GRAPHIC SCALES
GENERAL NOTES
EXISTING KEYNOTES
SECOND FLOOR FRAMING PLAN A3
KEYNOTES
FLOOR ELEVATIONS
CANOPY FRAMING PLAN A2
C2 B2
B2
B3
B5
A3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF102
THIRD FLOOR REINFORCING PLAN A3
GRAPHIC SCALE
GENERAL NOTES
EXISTING KEYNOTE
B5
A2 C2 B2
C5
C2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF103
THIRD FLOOR FRAMING PLAN A3
GRAPHIC SCALE
GENERAL NOTES
EXISTING KEYNOTES
KEYNOTES
INTERMEDIATE THIRD FLOOR FRAMING PLANA2
B5
C2
C2
C2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF104
FOURTH FLOOR FRAMING PLAN A3
GRAPHIC SCALE
GENERAL NOTES
EXISTING KEYNOTES
KEYNOTES
C3
C2
C4
C5
A2
B5
C4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF105
ROOF FRAMING PLAN A3
GRAPHIC SCALE
EXISTING KEYNOTES
KEYNOTES
CONNECTOR ROOF FRAMING PLANA2
SECOND FLOOR REINFORCEMENT SECTION D2
C5B2
12x14 TIMBER BEAM REINFORCEMENT DETAILC5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF201
THIRD FLOOR REINFORCEMENT SECTION 2 B2
THIRD FLOOR REINFORCEMENT SECTION 1 C2
C5 A2
A5
B2
B2
12x12 TIMBER BEAM REINFORCEMENT DETAILC5
W8x18 TO W10x30 CONN DETAIL A2 W16x26 TO W10x30 CONN DETAIL A5
TYP BEAM BEARING PLATE IN EXIST BRICK WALLA3 N
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF202
FOURTH FLOOR REINFORCEMENT SECTION C2
A2
A4 12x12 TIMBER BEAM REINFORCEMENT DETAILC5
3/4" DIA STL ROD TO EXIST 6x12± TIMBER BEAM CONN DETAILA2 3/4" DIA STL ROD TO EXIST 12x12± TIMBER BEAM CONN DETAILA4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF203
MASONRY WALL 1 ELEVATION - MW1A2 MASONRY WALL 2 ELEVATION - MW2A4 MASONRY WALL 3 ELEVATION - MW3A5
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF204
GRAPHIC SCALE
GENERAL NOTES KEYNOTES
KEY PLAN
A2 A4
A5
MASONRY WALL 4 ELEVATION - MW4A2 MASONRY WALL 5 ELEVATION - MW5A3 MASONRY WALL 6 ELEVATION - MW6A5
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF205
GRAPHIC SCALE
GENERAL NOTES KEYNOTES
KEY PLAN
A2
A5
GRAPHIC SCALE
KEY PLAN
A3
MASONRY WALL 7 ELEVATION - MW7A2 MASONRY WALL 8 ELEVATION - MW8A3 MASONRY WALL 9 ELEVATION - MW9A4 MASONRY WALL 10 ELEVATION - MW10A5
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF206
GRAPHIC SCALE
GENERAL NOTES KEYNOTES
KEY PLAN
A2
A3 A4
A5
ELEVATION - MW11 B3
MASONRY WALL 11
ELEVATION - MW12 B4
MASONRY WALL 12
ELEVATION - MW13 B5
MASONRY WALL 13
ELEVATIONS - MW14 AND MW15C2
MASONRY WALL 14 AND 15
ELEVATION - MW16 B2
MASONRY WALL 16
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF207
GRAPHIC SCALE
GENERAL NOTES KEYNOTES
KEY PLAN
B4
B3
B5
C2 C2
W8x18 BEAM SPLICE DETAILD1 W10x30 BEAM SPLICE DETAILD2 W16x26 BEAM SPLICE DETAILC3 W10x30 TO HSS 5x5x1/4 COL CAP PLATE DETAILC5
W10x30 TO W10x30 CONN DETAILB2
B5
EXIST 4x6± JOIST TO W8x18 CONN DETAILB3
B3
W8x18 TO W10x30 CONN DETAILB5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF501
TYP W8x10 TO CMU WALL CONN DETAILC2 TYP ROOF DECK SUPPORT DETAILC3
TYP BEAM TO BEAM CONN DETAILD4
TYP W8x24 TO HSS 4x4x3/8 CONN DETAILC5
TYP EXIST FLOOR DIAPHRAGM CONN DETAILB2
2x8 HEADER BEAM DETAIL AT EXIST 4x9±B3 TYP BUILDING ISOLATION JOINT DETAILB5
C5
B5
TYP FLOOR INFILL FRAMING DETAIL A3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF502
TYP REINF CONC WALL CAP DETAIL C2
B5
TYP C12x20.7 TO HSS 3x3x3/8 CONN DETAIL C4
C5
B5
C2 TYP (3) 2x6 HEADER JOIST CONN DETAILC5
PIPE SLIDE SUPPORT DETAIL AT MANHOLE 389B2
TYP CANOPY SECTION A5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF503
CONNECTOR FOURTH FLOOR TRANSITION CONN DETAILC2
CONNECTOR ROOF RAFTER CONN DETAILC4
HSS 5x5x1/4 COLUMN SPLICE DETAILB4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF504
COLUMN SCHEDULE BEAM BEARING PLATE SCHEDULE
C5
C5
C2
C5
B4
TYP BASE PLATE DETAIL A2
BP1 BP2
TYP BEAM BEARING PLATE DETAIL B5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
6)
SF601
GENERAL REMOVALS NOTES EXISTING KEYNOTES REMOVALS KEYNOTES
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AD001
FIRST FLOOR REMOVALS PLAN
SECOND FLOOR REMOVALS PLANC2
A2
A5C5
C2
A2
A5C5
C2
LEGEND
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AD101
THIRD FLOOR REMOVALS PLAN A2
FOURTH FLOOR REMOVALS PLANC2
A2
A5C5
C2
A2
A5C5
C2
C2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AD102
ATTIC REMOVALS PLAN A2
ROOF REMOVALS PLAN C2
A2
A5C5
C2
A2
A5C5
C2
A1-A A3-A C2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AD103
BLDG 14
NORTH ELEVATION REMOVALS C2 WEST ELEVATION REMOVALS C5
SOUTH ELEVATION REMOVALS A2 EAST ELEVATION REMOVALS A5
GENERAL NOTES
A2
A3
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AD201
SOUTH ELEVATION REMOVALS A2
GENERAL NOTES
WEST ELEVATION REMOVALS A3
C3
C2
LOUVER REMOVALS ELEVATION (TYP)
REMOVALS SECTION AT LOUVERC3
SECOND FLOOR WINDOW REMOVALA4
THIRD FLOOR WINDOW REMOVALC4
HANDRAIL REMOVALS AT STAIR 003B3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AD202
ROOF REMOVALS DETAIL - STEP 1A2 ROOF REMOVALS DETAIL - STEP 2A4
B4
A4 A4
B4
A4 A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AD520
ROOF REMOVALS DETAIL - STEP 3A2
B4
A4 A4
ROOF REMOVALS DETAIL - STEP 3B4
ROOF REMOVALS DETAIL - STEP 3A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AD521
B4-A B4-A
GENERAL WALL TYPE NOTES:
B4-A
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE001
TYP WALL PENETRATION FIRESTOPPING DETAILSD2
TYPICAL INTERIOR WALL DETAILSB4
TYPICAL GYP BD CONTROL JOINTA4
TYP SECURE WALL DETAIL D4
MANBAR BARRIER DETAILTYPICAL TOP OF WALL DETAIL C4
GENERAL SHEET NOTES
MOUNTING HEIGHTS NOTE
MOUNTING HEIGHTS LEGEND
GRAPHIC SCALE
STANDARD MOUNTING HEIGHTS A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE002
FIRST FLOOR PLAN
GENERAL NOTES
KEYNOTES
A2
C2
C2 A2
C1
C1
A2
D1
A4
C2
A2
C4
C4
LEGEND
A4
A4
C4
A2
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE101
SECOND FLOOR PLAN
GENERAL NOTES
KEYNOTES
A2
C2
C2 A2
C2
C2
A1
C2
A2C5
A4
C2C2
C4
C4
C5
A4
C4
C3
A2
A2
C3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE102
THIRD FLOOR PLAN
GENERAL NOTES
KEYNOTES
A2
C2
C2 A2
C3
C4
A3
C2
A2 C2
C3
C2
C4
C4
C4 A4
C2
A2
A5
C5
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE103
FOURTH FLOOR PLAN
GENERAL NOTES
KEYNOTES
A2
C2
C2 A2
C4
C3
C2
A2
A4
C4
C4
C4
C4
A2
A2
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE104
ATTIC FLOOR PLAN
GENERAL NOTES
KEYNOTES
C2 A2
C2 A2
C2
B1
A4 C4
A2
B1
B2
A2
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE105
ROOF PLAN A1
GENERAL NOTES
KEYNOTES
C2
C1 A1
A2
A2,A4
C2
A2
B1
A3
A4 C4
C1
C1 A1
A1
A2
C4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE120
FIRST FLOOR SIGNAGE PLANC1
SECOND FLOOR SIGNAGE PLANA3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE131
THIRD FLOOR SIGNAGE PLANB1
FOURTH FLOOR SIGNAGE PLANA3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE132
NORTH ELEVATION C2
SOUTH ELEVATION A2
GENERAL NOTES
KEYNOTES
A2
C2
KEYPLAN
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE201
KEYPLAN
WEST ELEVATION C2
EAST ELEVATION A2
GENERAL NOTES
KEYNOTES
B5
C2 A2
C2
C2
B5
C5
C5
PARTIAL SOUTH ELEVATION A4
TOWER NORTH ELEVATION C4
A2
A4 C4
A1C
A1D
A1D
A1A
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE202
BUILDING SECTION C2
A2
KEYPLAN
C2
B5
GRAPHIC SCALESGENERAL NOTESBUILDING SECTION A2
A3A1
A3
A5
C2
GRANITE DETAIL C5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE221
A4
C3
C2
A5
C2
C3
C2
A5
B1D
WALL SECTION A1 WALL SECTION A3
C3
A5
A2
C5
A3
A3
C5
C1
C1
GRAPHIC SCALES
WALL SECTION DETAIL A5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE301
KEYNOTES
WALL SECTION A2
C1
A2C
A3C
A3
WALL AT CORNICE DETAIL B4
B4
D5
DORMER ENLARGED FLOOR PLAN C4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE302
GENERAL NOTES
TOILET 106 ENLARGED FLOOR PLAND1
D1
ENLARGED FLOOR PLAN C1
MEN 209 ENLARGED FLOOR PLANA1 MEN 209 ELEVATION A3
C1 A1
KEYNOTES
TOILET ROOM ACCESSORY SCHEDULE
A4
A3
TOILET 106 ELEVATIOND2
TOILET 126 ELEVATION C3
TOILET 106 ELEVATIOND3
BREAKROOM 127 ELEVATIONC4TOILET 126 ELEVATIONC2
MEN 209 ELEVATION B3
B3
TYP PORCELAIN WALL TILE PATTERNB4
B1B3
TOILET 126/BREAK 127
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE401
GENERAL NOTES
C5
KEYNOTE
WOMEN 202 ENLARGED FLOOR PLANC5
WOMEN 306 ENLARGED FLOOR PLANC2 MEN 316 ENLARGED FLOOR PLANC3
WOMEN 306 ELEVATION B1
C2 C3
MEN 316 ELEVATION A1
WOMEN 306 ELEVATION B2 MEN 316 ELEVATION B3
WOMEN 202 ELEVATION A2 WOMEN 202 ELEVATION A3
B1
A3
A3 A3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE402
GENERAL NOTE
STAIR 001 FIRST FLOOR PLANC1 STAIR 001 SECOND FLOOR PLANC2 STAIR 001 THIRD FLOOR PLANC3 STAIR 001 FOURTH FLOOR PLANC4
C1 C2 C3 C4
C2
KEYNOTES
A2 A2 A2 A2
C1
EXISTING KEYNOTE
A1A3 B3
A3
RAILING DETIAL A1 FIRE BLANKET STAIR DETAIL A3 CONCRETE CAP DETAIL A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE441
ELEVATOR AND STAIR 004 SECOND FLOOR PLANC2
ELEVATTO AND STAIR 004 FIRST FLOOR PLANA2
ELEVATOR AND STAIR 004 FOURTH FLOOR PLANC3
ELEVATOR AND STAIR 004 THIRD FLOOR PLANA3
KEYPLAN
C2 C3
A2 A3
THIRD FLOOR RAMP PLAN C4
C2
C2
C3
KEYNOTE
A2
A2
A2 A2
C4
A2 A2
A2A2
B2
A4 A4
A4 A4
A2
B5
C3
A2A2
A2 A2
C3
C3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE442
GENERAL NOTES
STAIR 004 SECTION A4
KEYNOTE
B4
C1
C1
C1
B3
A1
C1
C1
A4
ELEVATOR SECTION A2
A2
A1
B3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE443
STAIR 001 SECTION A2
KEYPLAN
A2
GENERAL NOTES
KEYNOTE
C3
C1
C1
C1
C1
C1
A4
B3
LADDER DETAIL
A4
(TYP) LADDER SUPPORT DETAIL
C4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE444
TYPICAL TOP LANDING ELEVATIONB5RAILING DETAILS B4
B4A
B4A
B4C
B4C
INTERMEDIATE LANDING (TYP)C1
INTERMEDIATE LANDING (TYP)A1
FIRST FLOOR LANDING (TYP)A3
FIRST FLOOR LANDING (TYP)B3
SECOND FLOOR LANDING (TYP)C3
TREAD DETAIL D5
SAFETY GATE (TYP) A4
D5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE445
ELEVATOR DOOR DETAILS A4ELEVATOR DOOR DETAIL A2
KEYNOTES
RAMP SECTION C2
B4A B4B
A4A
A2
A4C
TYPICAL ELEVATOR DOOR ELEVATION D4
A4B
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE446
PLAN DETAIL C5
GENERAL NOTES
PLAN DETAIL C2PLAN DETAIL C1
PLAN DETAIL A1
PLAN DETAIL B1
PLAN DETAIL A3
PLAN DETAIL B3
PLAN DETAIL A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE501
PLAN DETAIL A3 PLAN DETAIL A4
PLAN DETAIL B3 PLAN DETAIL B5
C3CURTAIN WALL TO CMU WALL DETAIL
A2INSIDE / OUTSIDE STONE VENEER OVER CMU WALL PLAN DETAIL
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE502
KNEEWALL INSULATION DETAIL C1 ATTIC FLOOR INSULATION DETAILC3 ROOF INSULATION DETAIL C4
A5
DORMER INFIL/ INSULATION DETAILB5
DORMER INSULATION DETAIL A5
B5
C1
C4
BUILDING PART SECTION A2
C3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE511
SECTION AT DORMER SILL C2
ATTIC FLOOR INSULATION PLANB2
INSULATION AT FLOOR DETAIL C5TRIM INSULATION DETAIL C3
WINDOW ELEVATION
A4
INSULATION AT THIRD FLOOR
WINDOW ELEVATION
A3
INSULATION AT SECOND FLOOR
WINDOW ELEVATION
A2
INSULATION AT FIRST FLOOR
C2
C2 C2
A5
A2
C3
A4
C3 C3
INSULATION ELEVATION
A5
HISTORICAL STAIR
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE512
INSULATION AT WINDOW HEAD DETAILC2
INSULATION AT FIRST FLOOR WINDOW SILL DETAILA2 INSULATION AT SECOND FLOOR WINDOW SILL DETAILA4 INSULATION AT THIRD FLOOR WINDOW SILL DETAILA5
INSULATION AT WINDOW JAMB DETAILC3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE513
FLOOR ISOLATION JOINT DETAIL
A2
CEILING ISOLATION JOINT DETAIL
D2
ROOF ISOLATION JOINT DETAIL
A3
C2
CURTAIN WALL
ISOLATION JOINT DETAIL
A5
WALL ISOLATION JOINT DETAIL
B5
METAL PANEL WALL
ISOLATION JOINT DETAIL
D5
CURTAIN WALL TO METAL PANEL
WALL ISOLATION JOINT DETAIL
B2
FLOOR TO WALL
ISOLATION JOINT DETAIL
CEILING ISOLATION JOINT DETAIL
B3
SEALING ISOLATION SYSTEM
C3
TYP SELF EXPANDING FOAM
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE514
GRAPHIC SCALEMETAL PANEL DETAILS
A1
GENERAL NOTE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE515
WALL SECTION DETAIL A2 WALL SECTION DETAIL A3
WALL SECTION DETAIL A5
SECOND FLOOR OPENING ELEVATIONC1 OPENING JAMB DETAIL C3
GRAPHIC SCALES
WALL SECTION DETAIL C5
C3
A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE516
ROOF CONNECTION DETAIL - STEP 1A2 ROOF CONNECTION DETAIL - STEP 2A4
C1
C3 C3
D5
B5
A5
A1E
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE520
ROOF CONNECTION DETAIL - STEP 3A2 ROOF CONNECTION DETAIL - STEP 4A4
C3
A1
A3
C4
C3
C1
C1
B1
B3
A3
D5
B5
A5
A1D
A1E
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE521
EXIST DORMER RIDGE DETAIL C1 CONNECTOR RIDGE DETAIL C3
EXIST DORMER ROOF-TO-WALL DETAILA1 CONNECTOR ROOF-TO-WALL DETAILA3
EXIST DORMER VALLEY DETAIL C4
A1A
CANNOPY SECTION A5
CANNOPY SECTION DETAIL B5
A5
CANOPY PLAN C5
B5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE522
DORMER ROOF CONNECTION DETAILC1 ISOLATION JOINT DETAIL C3 ROOF-TO-WALL DETAIL C4
EAVE/ ROOF-TO-WALL DETAIL B1 ROOF-TO-WALL DETAIL B3
A3
B4
A1
A4
FLASHING DETAIL B4
STANDING SEAM HEADWALL DETAILA1 GUTTER DETAIL A3 ISOLATION JOINT DETAIL A4
C5
FLASHING TRANSITION DETAIL C5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE523
SBS MODIFIED BITUMEN ROOF SYSTEMC1
ROOF DRAIN DETAIL A4TYP PARAPET WALL DETAIL A1
ROOF HATCH DETAIL B4RADON VENT DETAIL B1
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE524
LIGHTNING TERMINAL DETAIL A3ELEVATOR SHAFT ROOF DETAIL A1
TYP FALL PROTECTION RAILING DETAILC1
VENT THRU ROOF (VTR) DETAIL A4
ROOF TO SIDING DETAIL B3
C1
TYP FALL PROTECTION RAILING ELEVATIONC3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE525
STAIR A
ELECTRICAL
STAIR B
FLOOR
NO ROOF ACCESS
FIRST FLOOR TO
FOURTH FLOOR
EXIT ON FIRST FLR
USER TEXT
USER TEXT
SIGN TYPES A1
ROOM
ACCESSIBLE EXIT AT
ELEVATOR STAIR TOWER
IN CASE OF FIRE
DO NOT USE ELEVATOR.
USE EXIT STAIR UNLESS
OTHERWISE INSTRUCTED.
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE531
GENERAL SIGNAGE NOTES
SIGNAGE SCHEDULE
SIGNAGE ELEVATION B4 SIGNAGE DETAIL B5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE532
TYP SECTION AT BASE CABINET B1
TYP SECTION AT SINK COUNTER A3
TYP SECTION AT SINK BASE CABINETB3
TYP SECTION AT SHELF A4SECTION AT COUNTER A1
SECTION AT OPEN SHELVING B4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE541
DOOR SCHEDULE
DOOR SCHEDULE NOTES
DOOR TYPES B4
FRAME TYPES A4
DOOR SCHEDULE
DOOR SCHEDULE GENERAL NOTES
SCHEDULE KEY
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE601
INTERIOR DOOR DETAILS C2
INTERIOR DOOR DETAILS AT CMU WALLA2
AT FURRED CMU WALL B4
EXTERIOR DOOR DETAILS A3
INTERIOR DOOR DETAILS
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE602
GRAPHIC SCALESDOOR E01 DETAILS
A1
FLASHING DETAIL
C4
SILL FLASHING DETAIL
A5
A5
GENERAL NOTES
A1-B
A1-C
A1-D
DOOR E01 EXTERIOR ELEVATION
C5
A1-A
A1-E
DOOR E01 INTERIOR ELEVATION
B5
C4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE603
WINDOW REPAIR AND RESTORATION SCHEDULE REMARKS
WINDOW REPAIR AND RESTORATION SCHEDULE
WINDOW REPAIR AND RESTORATION CLASS NOTES
CLASS I REPAIR AND RESTORATION
CLASS II REPAIR AND RESTORATION
WINDOW REPAIR AND RESTORATION GENERAL NOTES
WINDOW REPAIR AND RESTORATION SCHEDULE [OPTION 5]
WINDOW REPAIR AND RESTORATION SCHEDULE [OPTION 5]
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE621
WINDOW REPAIR AND RESTORATION TYPESC2 EXTERIOR METAL SCREENS C5
C2
C3
A4
B1B
A2 A5
A3
B1A
B1D
B1B
B1C
INTERIOR STORM WINDOWS A2
A5C
A5B
A5A
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE622
WINDOW TYPES D2
A2B
A2C
A2A
CURTAINWALL TYPES A2
GRAPHIC SCALEGENERAL NOTE
TYPICAL EXTERIOR GLAZING DETAILD4
DETAIL AT ROUGH OPENING (TYP)A5
MEMBRANE FLASHING SEQUENCE
A2B
A2C
A2A
A2B
A2C
A2A
A4
C5
A4
C5
C3C3
A3A
A3C
A3B
A4B A4B
LOUVER DETAIL C4
A2B
A2C
A2A
C3C3 A2B
A2C
A2A
C4
A5C
A5B
A5A
A4C A4C
A3A3
A3
A3
C3
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE625
DETAILS AT FOURTH FLOOR B3WOOD WINDOW DETAILSB1
SALVAGED INTERIOR STORM WINDOW
INTERIOR STORM WINDOW DETAILS AT STAIR 001A5
INTERIOR STORM WINDOW DETAILS AT OCULUS A3 WINDOW GUARDRAIL DETAIL AT STAIR 001A4
WINDOW GUARDRAIL DETAIL AT STAIR 004C4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE626
FIXED ALUMINUM WINDOW DETAILSA2
A3TYPICAL CURTAINWALL DETAILS AT DOOR CURTAINWALL DETAILS AT FOURTH FLOORA4
ALUMINUM DOOR DETAILSA5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE627
CURTAINWALL SILL DETAIL AT FIRST FLOORC4
CURTAINWALL SILL DETAIL AT FOURTH FLOORC5
SPANDREL CURTAINWALL DETAILA3 CURTAINWALL HEAD DETAIL AT THIRD FLOORA4CURTAINWALL DETAILS AT FOURTH FLOORA2
GENERAL NOTE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE628
ROOM FINISH SCHEDULE ROOM FINISH SCHEDULE
ROOM FINISH
SCHEDULE LEGEND
COLOR KEY / MANUFACTURER GUIDE
ROOM FINISH SCHEDULE NOTES ROOM FINISH GENERAL NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE641
FIRST FLOOR REFLECTED CEILING PLAN
KEYNOTES
CEILINGLEGEND
GRAPHIC SCALE N
A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE701
SECOND FLOOR REFLECTED CEILING PLAN
GENERAL NOTES
GRAPHIC SCALES
SOFFIT DETAIL A1
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE702
THIRD FLOOR REFLECTED CEILING PLAN GRAPHIC SCALE
KEYNOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE703
FOURTH FLOOR REFLECTED CEILING PLAN
GENERAL NOTE
KEYNOTES
C1
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE704
SOFFIT DETAIL C1
CEILING ENTRY ALCOVE DETAILC3
WALL DETAIL C5
SOFFIT DETAIL B5
THIRD FLOOR LIGHT WELL DETAILA3SECOND FLOOR LIGHT WELL DETAILA2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE721
BREAK ROOM 305 ELEVATIONB4 BREAK ROOM 305 ELEVATIONB5
OPEN OFFICE 207 ELEVATIONC1
B1
A4
B3
OPEN OFFICE 201 ELEVATIONA4
B1B4
OPEN OFFICE 207 ELEVATIOND1
BREAK ROOM 206 ELEVATIONB1
BREAK ROOM 206 ELEVATIONA2
KEYNOTE
A1
A1
C5
B1
B3
A4 A1
A1
AE740
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
EXPRESSING 312 ELEVATION B1
A3
OPEN OFFICE 108 ELEVATIONB2 OPEN OFFICE 402 ELEVATIONB3
CORRIDOR 112 ELEVATION A1
B1
A4
B3 A4 B3 B1
OPEN OFFICE 303 ELEVATIONC1
CORRIDOR 112 ELEVATION B4
STORAGE 118 ELEVATION A3
A1
A1
ATM LOBBY 119 ELEVATION A4
OPEN OFFICE 303 ELEVATIOND1
AE741
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
KEYNOTES
C2
C3
C2
OPEN OFFICE 402 ELEVATION D2 OPEN OFFICE 402 ELEVATION D3
A1
STORAGE 129 ELEVATION D4
AE742
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
FIRST FLOOR FF&E PLAN B1
GENERAL NOTES
FF&E SCHEDULE
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE801
SECOND FLOOR FF&E PLAN B1
FF&E SCHEDULE
GENERAL NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE802
THIRD FLOOR FF&E PLAN B1
FF&E SCHEDULE
GENERAL NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE803
FOURTH FLOOR FF&E PLAN B1
FF&E SCHEDULE
GENERAL NOTES
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE804
KEYPLAN
BREAK ROOM 206 FLOOR PATTERN PLANA2
FIRST FLOOR FLOORING PLAN C2 TYP PORCELAIN FLOOR TILE PATTERNC4
OPEN OFFICE FLOORING DETAILB4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE810
FIRST FLOOR REMOVALS PLAN [OPTION 3]
GENERAL NOTES
KEYPLAN
B4B2
FIRST FLOOR PLAN [OPTION 3] B4
LEGEND
B2
KEYNOTES
REMOVALS KEYNOTES
C1
A4
A2
PLAN DETAIL A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE901
DOOR SCHEDULE [OPTION 3]
DOOR SCHEDULE GENERAL NOTES DOOR SCHEDULE NOTES
ROOM FINISH SCHEDULE [OPTION 3]
ROOM FINISH SCHEDULE GENERAL NOTES ROOM FINISH SCHEDULE NOTES
LOBBY 121 ELEVATION [OPTION 3]C2
TELLERS 124 ELEVATION [OPTION 3]B2
TELLERS 124 COUNTER PLAN [OPTION 3]A2
TELLERS 124 ELEVATION [OPTION 3]C4
B1 B1 A5
A5
TYP TELLER COUNTER SECTION A5
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE961
SECOND FLOOR REFLECTED CEILING PLAN [OPTION 6]
KEYNOTES
GENERAL NOTE
B2
CEILING PANEL DETAIL [OPTION 6] A2 CEILING PANEL LAYOUTS [OPTION 6] A4
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE971
THIRD FLOOR REFLECTED CEILING PLAN [OPTION 6]B2
GENERAL NOTE
KEYNOTES
TYP CLOUD EDGE DETAIL [OPTION 6] A2
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
B
N E
W S
TA
IR
/L
IF
E S
A
FE
TY
/P
O W
E R
IM
P
R O
V E
M E
N
TS
R
M
-1
AE972
| 01_GENERAL |
| G-001A COVER SHEET - VOLUME 1 |
| G-002A LIST OF DRAWINGS - VOLUME 1 |
| G-002B LIST OF DRAWINGS - VOLUME 2 |
| G-003A ABBREVIATIOS, LEGEND, AND GENERAL PROJECT NOTES |
| G-004 CONSTRUCTION SEQUENCE STRATEGY |
| G-005 SITE CONSTRAINTS AND REQUIREMENTS PLAN - PHASE 1 |
| G-006 SITE CONSTRAINTS AND REQUIREMENTS PLAN - PHASE 2 |
| G-007 UTILTES OUTAGE PLAN - WATER AND STEAM |
| G-008 CONSTRUCTION BARRIER DETAILS |
| G-009 OUTAGE SCHEDULE |
| G-101 CODE COMPLIANCE SITE PLAN |
| G-102 CODE COMPLIANCE SUMMARY SHEET 1 |
| G-103 CODE COMPLIANCE SUMMARY SHEET 2 |
| G-104 FIRST FLOOR LIFE SAFETY PLAN |
| G-105 SECOND FLOOR LIFE SAFETY PLAN |
| G-106 THIRD FLOOR LIFE SAFETY PLAN |
| G-107 FOURTH FLOOR LIFE SAFETY PLAN |
| G-108 ATTIC LIFE SAFETY PLAN |
| G-901 FIRST FLOOR LIFE SAFETY PLAN [OPTION 3] |
| 02_HAZARDOUS MATERIALS |
| HM101 FIRST AND SECOND FLOOR HAZAEDOUS MATERIALS REMOVALS PLANS |
| HM102 THIRD AND FOURTH HAZARDOUS MATERIALS REMOVALS PLANS |
| HM103 ROOF HAZARDOUS MATERIALS REMOVALS PLAN |
| 03_CIVIL |
| C-001 CIVIL NOTES |
| C-002 CIVIL LEGEND AND ABBREVIATIONS |
| CX101 SITE EXISTING CONDITIONS PLAN |
| CX501 SITE EXISTING UTILITY STRUCTURE DETAILS 1 |
| CX502 SITE EXISTING UTILITY STRUCTURE DETAILS 2 |
| CR101 SITE REMOVALS PLAN |
| CS101 SITE AND UTILITIES PLAN |
| CG101 GRADING, DRAINAGE AND ERROSION CONTROL PLAN |
| C-201 STORM DRAIN PROFILES |
| C-202 WATER LINE PROFILES |
| C-501 SITE DETAILS 1 |
| C-502 SITE DETAILS 2 |
| C-503 SITE DETAILS 3 |
| C-504 SITE DETAILS 4 |
| C-505 SITE DETAILS 5 |
| C-506 SITE DETAILS 6 |
| C-507 SITE DETAILS 7 |
| B-001 BORING LOGS 1 |
| B-002 ENVIORMENTAL TEST RESULTS |
| 04_STRUCTURAL |
| S-001 STRUCTURAL NOTES |
| S-002 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS |
| S-003 DESIGN LOADS |
| SD101 FOUNDATION REMOVALS PLAN |
| SD102 SLAB REMOVALS PLAN |
| SD103 SECOND FLOOR FRAMING REMOVALS PLAN |
| SD104 THIRD FLOOR FRAMING REMOVALS PLAN |
| SD105 FOURTH FLOOR FRAMING REMOVALS PLAN |
| SD106 ROOF FRAMING REMOVALS PLAN |
| SB101 FOUNDATION PLAN |
| SB102 SLAB PLAN |
| SB501 FOUNDATION DETAILS 1 |
| SB502 FOUNDATION DETAILS 2 |
| SB901 FOUNDATION PLAN [OPTION 3] |
| SB902 SLAB PLAN [OPTION 3] |
| SF101 SECOND FLOOR FRAMING PLAN |
| SF102 THIRD FLOOR REINFORCING PLAN |
| SF103 THIRD FLOOR FRAMING PLAN |
| SF104 FOURTH FLOOR FRAMING PLAN |
| SF105 ROOF FRAMING PLAN |
| SF201 SECOND FLOOR REINFORCEMENT SECTION |
| SF202 THIRD FLOOR REINFORCEMENT SECTIONS |
| SF203 FOURTH FLOOR REINFORCEMENT SECTION |
| SF204 MASONRY WALL ELEVATIONS 1 |
| SF205 MASONRY WALL ELEVATIONS 2 |
| SF206 MASONRY WALL ELEVATIONS 3 |
| SF207 MASONRY WALL ELEVATIONS 4 |
| SF501 STRUCTURAL DETAILS 1 |
| SF502 STRUCTURAL DETAILS 2 |
| SF503 STRUCTURAL DETAILS 3 |
| SF504 STRUCTURAL DETAILS 4 |
| SF601 COLUMN SCHEDULE |
| 05_ARCHITECTURAL |
| AD001 GENERAL REMOVALS NOTES, EXISTING KEYNOTES, AND REMOVALS KEYNOTES |
| AD101 FIRST AND SECOND FLOOR REMOVALS PLANS |
| AD102 THIRD AND FOURTH FLOOR REMOVALS PLANS |
| AD103 ATTIC AND ROOF REMOVALS PLANS |
| AD201 EXTERIOR ELEVATION REMOVALS |
| AD202 EXTERIOR ELEVATION REMOVALS DETAILS |
| AD520 ROOF REMOVALS DETAILS 1 |
| AD521 ROOF REMOVALS DETAILS 2 |
| AE001 WALL TYPES |
| AE002 FIRESTOPPING DETAILS AND STANDARD MOUNTING HEIGHTS |
| AE101 FIRST FLOOR PLAN |
| AE102 SECOND FLOOR PLAN |
| AE103 THIRD FLOOR PLAN |
| AE104 FOURTH FLOOR PLAN |
| AE105 ATTIC FLOOR PLAN |
| AE120 ROOF PLAN |
| AE131 FIRST AND SECOND FLOOR SIGNAGE PLANS |
| AE132 THIRD AND FOURTH FLOOR PLANS |
| AE201 EXTERIOR ELEVATIONS 1 |
| AE202 EXTERIOR ELEVATIONS 2 |
| AE221 BUILDING SECTIONS |
| AE301 WALL SECTIONS 1 |
| AE302 WALL SECTIONS 2 |
| AE401 ENLARGED TOILET ROOM PLANS AND INTERIOR ELEVATIONS 1 |
| AE402 ENLARGED TOILET ROOM PLANS AND INTERIOR ELEVATIONS 2 |
| AE441 ENLARGED STAIR 001 PLANS AND MISCELLANEOUS DETAILS |
| AE442 ENLARGED ELEVATOR, STAIR 004, AND RAMP PLANS |
| AE443 ELEVATOR AND STAIR 004 SECTIONS |
| AE444 STAIR 001 SECTION |
| AE445 STAIR DETAILS |
| AE446 ELEVATOR AND RAMP DETAILS |
| AE501 PLAN DETAILS 1 |
| AE502 PLAN DETAILS 2 |
| AE511 INSULATION DETAILS 1 |
| AE512 INSULATION DETAILS 2 |
| AE513 INSULATION DETAILS 3 |
| AE514 ISOLATION JOINT DETAILS |
| AE515 METAL PANEL DETAILS |
| AE516 WALL DETAILS |
| AE520 DORMER DETAILS 1 |
| AE521 DORMER DETAILS 2 |
| AE522 ROOF DETAILS 1 |
| AE523 ROOF DETAILS 2 |
| AE524 ROOF DETAILS 3 |
| AE525 ROOF DETAILS 4 |
| AE531 SIGN TYPES |
| AE532 SIGNAGE SCHEDULE AND DETAILS |
| AE541 CASEWORK DETAILS |
| AE601 DOOR SCHEDULE |
| AE602 DOOR DETAILS 1 |
| AE603 DOOR DETAILS 2 |
| AE621 WINDOW REPAIR AND RESTORATION NOTES AND SCHEDULES |
| AE622 WINDOW REPAIR AND RESTORATION WINDOW TYPES, AND STORM WINDOW AND METAL SCREEN DETAILS |
| AE625 WINDOW TYPES |
| AE626 WINDOW DETAILS 1 |
| AE627 WINDOW DETAILS 2 |
| AE628 WINDOW DETAILS 3 |
| AE641 ROOM FINISH SCHEDULE AND COLOR KEY/MANUFACTURER GUIDE |
| AE701 FIRST FLOOR REFLECTED CEILING PLAN |
| AE702 SECOND FLOOR REFLECTED CEILING PLAN |
| AE703 THIRD FLOOR REFLECTED CEILING PLAN |
| AE704 FOURTH FLOOR REFLECTED CEILING PLAN |
| AE721 CEILING DETAILS |
| AE740 INTERIOR ELEVATIONS 1 |
| AE741 INTERIOR ELEVATIONS 2 |
| AE742 INTERIOR ELEVATIONS 3 |
| AE801 FIRST FLOOR FF&E PLAN AND SCHEDULE [OPTION 1] |
| AE802 SECOND FLOOR FF&E PLAN AND SCHEDULE [OPTION 1] |
| AE803 THIRD FLOOR FF&E PLAN AND SCHEDULE [OPTION 1] |
| AE804 FOURTH FLOOR FF&E PLAN AND SCHEDULE [OPTION 1] |
| AE810 FLOORING PATTERN PLANS AND DETAILS |
| AE901 FIRST FLOOR PLANS [OPTION 3] |
| AE961 DOOR AND ROOM FINISH SCHEDULE [OPTION 3] |
| AE971 SECOND FLOOR REFLECTED CEILING PLAN [OPTION 6] |
| AE972 THIRD FLOOR REFLECTED CEILING PLAN [OPTION 6] |
| 2024-03-28T11:51:55-0400 | |
| MERCER.CHELSEA.ANN.1618149796 |
File details come from the government source that posted it. Updated .