B14 Drawings - Volume 1_SBD_03-28-24.pdf

PDF 41 MB Posted

Attached to
DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE
Solicitation number
N4008524R2534
Issued by

About this file

The provided document is a set of drawings, titled "B14 Drawings - Volume 1_SBD_03-28-24.pdf," related to a federal contract opportunity for the Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements at the Portsmouth Naval Shipyard (PNSY) in Kittery, Maine.

The project involves a total interior renovation of the four-story, 22,705 square foot historic Building 14, which is in need of utility upgrades, egress/fire life safety/accessibility compliance upgrades, exterior envelope repairs, structural upgrades, and the removal of lead paint and asbestos materials. The scope of work includes hazardous material removal and remediation, modifications to the building's floors and supporting structure, the addition of two code-compliant internal stairs and a building addition to house an elevator, stair, and utility support spaces, the restoration of historic windows and masonry, the provision of a lightning protection system, and a complete overhaul of the building's mechanical, electrical, and fire protection systems.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 006 - attachment 2- J and A Toilet Accessories .pdf PDF
Amendment 0006 - B14.pdf PDF
Amendment 006 - attachment 1 - J and A Interior Finishes.pdf PDF
Amendment 0005 - Attachment 1 - M503.pdf PDF
Amendment 0005 B14.pdf PDF
Amendment 0004 Attachment 1 M-502 for PPI 153.pdf PDF
Amendment 0004 B14.pdf PDF
Amendment 0004 attachment 2 Amendment Dwgs.pdf PDF
Amendment 0003 - Enclosure (2) for PPI 17.xlsx XLSX spreadsheet
Amendment 0003 B14.pdf PDF
Amendment 0003 - Enclosure (3) for PPI 101.pdf PDF
Amendment 0002 B14.pdf PDF
Amendment 0001 B14.pdf PDF
Amendment 0001 - Attachment 1 - Revised Drawings Specs .pdf PDF
Amendment 0001 - Attachment G- Price Proposal Form REV .docx DOCX document
Amendment 0001 - Attachment 2 - Site Visit Sign-in Sheet.pdf PDF
B14 Drawings - Volume 2_SBD_03-28-24.pdf PDF
N4008524R2534 B14.pdf PDF
Attachment E-Small Business Participation Commitment Document.docx DOCX document
B14 Specifications_SBD_03-22-24.pdf PDF
Attachment H - PIEE Vendor Access Instructions.pdf PDF
Attachment F - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
Attachment D- Historical Small Business Utilization.docx DOCX document
Attachment G - Price Proposal Form .docx DOCX document
Attachment K - SF 5512 site visit .pdf PDF
Attachment A - Pre-proposal Inquiry Form.xls XLS spreadsheet
Attachment B - Construction Experience Project data sheet.docx DOCX document
Attachment C - Past Performance Questionnaire (Form PPQ).docx DOCX document
Attachment J - DBIDS Access Request Form.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

KITTERY, ME

PORTSMOUTH NAVAL SHIPYARD

G-001A

SHEET NO. NAVFAC

DWG. NO.

PWD

DWG. NO. SHEET TITLE

GENERAL

CIVIL

STRUCTURAL

SHEET NO. NAVFAC

DWG. NO. SHEET TITLE

HAZARDOUS MATERIALS

ARCHITECTURAL

ARCHITECTURAL

PWD

DWG. NO.

LIST OF DRAWINGS - VOLUME 1

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

G-002A

PLUMBING

MECHANICAL

LIST OF DRAWINGS - VOLUME 2

SHEET NO. NAVFAC

DWG. NO.

PWD

DWG. NO. SHEET TITLE

FIRE PROTECTION

SHEET NO. NAVFAC

DWG. NO. SHEET TITLE

ELECTRICAL

PWD

DWG. NO.

GENERAL ELECTRICAL

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-002B

GENERAL CONSTRUCTION NOTESGENERAL HAZARDOUS MATERIALS NOTES GENERAL REMOVALS NOTES

DETAIL TITLE

BUILDING SECTION INDICATOR

GENERAL SYMBOLS LEGEND

B6

A1

A1

KEYNOTE INDICATORSWALL/PARTIAL BUILDING SECTION INDICATOR

INTERIOR ELEVATION INDICATOR

EXTERIOR ELEVATION INDICATOR ROOM IDENTIFIER

DETAIL INDICATOR

B6 B6

PLAN TITLE

B6

CONTRACT LINE ITEM NUMBERS (CLIN)

ABBREVIATIONS

GENERAL MASONRY

CLEANING/REPAIR/REPOINTING NOTES

OPTIONS

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-003A

CONSTRUCTION SEQUENCE STRATEGY

GENERAL CONSTRUCTION SEQUENCE NOTES WATER SERVICE SEQUENCEELECTRICAL SERVICE SEQUENCEGENERAL CONSTRUCTION SEQUENCE

TELECOMMUNICATIONS SEQUENCE

RAILROAD IMPACT SEQUENCE

SITE PHASING SEQUENCE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-004

FIRE LANE

NO PARKING

NO PARKING

NO PARKING

FIRE LANE

FIR

E LA

NE

FIR

E LA

NE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

G-005

SITE CONSTRAINTS AND REQUIREMENTS PLAN - PHASE 1

GRAPHIC SCALE

BLDG 14

BLDG 178

GENERAL SHEET NOTES

BLDG 45BLDG 76

BLDG 13

SARATOGA

SQ

REMEY ST

MACDONOUGH AVE

SHOP 99

PORTSMOUTH

SQ

BLDG

R-178

BLDG 92

LEGEND

KEYNOTES GENERAL SHEET NOTES

NO PARKING

NO PARKING

FIRE LANE

FIR

E LA

NE

FIR

E LA

NE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

G-006

SITE CONSTRAINTS AND REQUIREMENTS PLAN - PHASE 2

GRAPHIC SCALE

BLDG 14

BLDG 178

GENERAL SHEET NOTES

BLDG 45BLDG 76

BLDG 13

SARATOGA

SQ

REMEY ST

MACDONOUGH AVE

SHOP 99

PORTSMOUTH

SQ

BLDG

R-178

BLDG 92

KEYNOTES

NO PARKING

NO PARKING

FIRE LANE

FIR

E LA

NE

FIR

E LA

NE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

G-007

UTILITIES OUTAGE PLAN - WATER AND STEAM

GRAPHIC SCALE

BLDG 14

BLDG 178

GENERAL SHEET NOTES

BLDG 45BLDG 76

BLDG 13

SARATOGA

SQ

REMEY ST

MACDONOUGH AVE

SHOP 99

PORTSMOUTH

SQ

BLDG

R-178

BLDG 92

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

TYPE 1 CONSTRUCTION BARRIER

TYPE 3 CONSTRUCTION BARRIER

TYPE 2 CONSTRUCTION BARRIER

CONSTRUCTION BARRIER SIGN

GENERAL CONSTRUCTION BARRIER NOTES

G-008

OUTAGE SCHEDULE GENERAL NOTE

OUTAGE SCHEDULE NOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-009

CODE COMPLIANCE SITE PLAN

GENERAL FIRE PROTECTION CODE INFORMATION

KEYNOTES

FIRE LANE

NO PARKING

NO PARKING

NO PARKING

FIRE LANE

FIR

E LA

NE

FIR

E LA

NE

GENERAL NOTE

LEGEND

GRAPHIC SCALE

ABBREVIATIONS

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

G-101

BLDG 14

BLDG 178

BLDG 45BLDG 76

BLDG 13

SARATOGA

SQ

REMEY ST

MACDONOUGH AVE

SHOP 99

PORTSMOUTH

SQ

BLDG

R-178

BLDG 92

LIFE SAFETY AND BUILDING CODE SUMMARY (UFC 3-600-01, NFPA, AND IBC)

A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-102

FIRST FLOOR CALCULATED OCCUPANT LOAD AND EGRESS CAPACITY

FOURTH FLOOR CALCULATED OCCUPANT LOAD AND EGRESS CAPACITY

THIRD FLOOR CALCULATED OCCUPANT LOAD AND EGRESS CAPACITY

SECOND FLOOR CALCULATED OCCUPANT LOAD AND EGRESS CAPACITY

GENERAL NOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-103

FIRST FLOOR LIFE SAFETY PLAN

GRAPHIC SCALE

GENERAL NOTES

KEYNOTES

LIFE SAFETY SYMBOLS LEGEND

FIRE RATING LEGEND

FIRE RATING SYMBOLS LEGEND

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-104

SECOND FLOOR LIFE SAFETY PLAN

GENERAL NOTES

KEYNOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-105

THIRD FLOOR LIFE SAFETY PLAN

GENERAL NOTES

KEYNOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-106

FOURTH FLOOR LIFE SAFETY PLAN

GENERAL NOTES

KEYNOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-107

ATTIC LIFE SAFETY PLAN

GENERAL NOTES

KEYNOTE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-108

GENERAL NOTES

KEYPLAN

B4

PARTIAL FIRST FLOOR LIFE SAFETY PLAN [OPTION 3]B4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

G-901

FIRST FLOOR HAZARDOUS MATERIALS REMOVALS PLANA2

SECOND FLOOR HAZARDOUS MATERIALS REMOVALS PLANC2

REMOVALS GENERAL NOTES

HAZARDOUS MATERIALS REMOVALS

LEGEND

GENERAL NOTES KEYNOTES

HAZARDOUS MATERIALS

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

HM101

GENERAL NOTE

THIRD FLOOR HAZARDOUS MATERIALS REMOVALS PLANA2

FOURTH FLOOR HAZARDOUS MATERIALS REMOVALS PLANC2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

HM102

ROOF HAZARDOUS MATERIALS REMOVALS PLAN

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

HM103

NO PARKING

NO PARKING

FIRE LANE

FIR

E LA

NE

FIR

E LA

NE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

CX101

SITE EXISTING CONDITIONS PLAN

GRAPHIC SCALE

BLDG 14

BLDG 178

GENERAL SHEET NOTES

EXISTING KEYNOTES

BLDG 45BLDG 76

BLDG 13

SARATOGA

SQ

REMEY ST

MACDONOUGH AVE

SHOP 99

PORTSMOUTH

SQ

BLDG

R-178

BLDG 92

EXIST SANITARY STRUCTURE SCHEDULE

EXIST DRAIN STRUCTURE SCHEDULE

NO PARKING

FIRE LANE

FIR

E LA

NE

FIR

E LA

NE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

CS101

GRAPHIC SCALE

BLDG 14

BLDG 178

GENERAL SHEET NOTES

SARATOGA

SQ

REMEY ST

MACDONOUGH AVE

PORTSMOUTH

SQ

R-178 BUILDING

ADDITION

KEYNOTES

SITE AND UTILITIES PLAN

SANITARY STRUCTURE SCHEDULEKEYNOTES

NO PARKING

FIRE LANE

FIR

E LA

NE

FIR

E LA

NE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

CG101

GRADING, DRAINAGE AND EROSION CONTROL PLAN

BLDG 14

BLDG 178

GENERAL SHEET NOTES

KEYNOTES

SARATOGA

SQ

REMEY ST

PORTSMOUTH

SQ

R-178 BUILDING

ADDITION

DRAIN STRUCTURE SCHEDULE

LEGEND

MACDONOUGH AVE

STRUCTURAL NOTES

CONCRETE

STRUCTURAL STEEL

STEEL DECK

GRATING

WOOD

REINFORCING STEEL LAP SPLICE SCHEDULE

POST INSTALLED ANCHORS

MASONRY

COLD-FORMED STEEL

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

S-001

EXISTING WOOD FRAMING JACKING NOTES

STRUCTURAL ABBREVIATIONS:

POUR STOP SCHEDULE

TEMPORARY SHORING NOTESSTRUCTURAL GENERAL NOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

S-002

BUILDING DESIGN LOADS (EXISTING BUILDING) BUILDING DESIGN LOADS (STAIR TOWER)RAILROAD DESIGN LOADS

A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

S-003

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SD101

GRAPHIC SCALE

GENERAL NOTES

FOUNDATION REMOVALS PLAN B3

EXISTING KEYNOTES

REMOVALS KEYNOTES

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SD102

GRAPHIC SCALE

GENERAL NOTES

SLAB REMOVALS PLAN B3

REMOVALS KEYNOTES

FLOOR ELEVATION

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SD103

GRAPHIC SCALE

GENERAL NOTES EXISTING KEYNOTES REMOVALS KEYNOTES

SECOND FLOOR FRAMING REMOVALS PLAN B3

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SD104

GRAPHIC SCALE

GENERAL NOTES EXISTING KEYNOTES REMOVALS KEYNOTES

THIRD FLOOR FRAMING REMOVALS PLAN B3

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SD105

GRAPHIC SCALE

GENERAL NOTES EXISTING KEYNOTES REMOVALS KEYNOTES

FOURTH FLOOR FRAMING REMOVALS PLAN B3

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SD106

GRAPHIC SCALE

GENERAL NOTE EXISTING KEYNOTES REMOVALS KEYNOTES

ROOF FRAMING REMOVALS PLAN B3

B2

A2

A4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SB101

GRAPHIC SCALES

GENERAL NOTES

FOUNDATION PLAN A3

KEYNOTES

FOOTING SCHEDULE

STOOP/CANOPY FND PLAN A2

B3

C4

C3

C2 B3

C2 C5

C5

B5

A2

A4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SB102

GRAPHIC SCALE

GENERAL NOTES

SLAB PLAN A3

TYP ADDITION 1'-2" FND WALL DETAIL C2 TYP ADDITION REINF CONC PIER DETAILC3

C5TYP ADDITION 8" FND WALL DETAIL

TYP CONTROL JOINT DETAIL B2

TYP SLAB-ON-GROUND DETAIL AT DOOR OPENINGB3

C5

TYP ELEVATOR SUMP PIT DETAIL B5

C2

TYP RADON PIT DETAIL A2

TYP CANOPY CONC PIER DETAIL A4

C3

C2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SB501

GRAPHIC SCALES

C2TYP ADDITION REINF CONC STOOP DETAIL

C4TYP INT REINF CONC FTG/PIER DETAIL

B2TYP INT STAIRWELL FND WALL DETAIL

TYP ELEVATOR PIT LADDER DETAILC5

B3TYP THICKENED SLAB EDGE DETAIL TYP STEP FOOTING DETAIL B5

A2TYP THICKENED SLAB AT ELEV MACHINE ROOM DETAIL TYP EQUIPMENT HOUSEKEEPING PAD DETAILA4 N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SB502

FOUNDATION REMOVALS PLAN [OPTION 3]B2

GENERAL NOTE

KEYNOTE

KEYPLAN

B4B2

FOUNDATION PLAN [OPTION 3] B4

LEGEND

REMOVALS KEYNOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

SB901

SLAB REMOVALS PLAN [OPTION 3] B2

GENERAL NOTE

KEYNOTES

KEYPLAN

B4B2

SLAB PLAN [OPTION 3] B4

LEGEND

REMOVALS KEYNOTE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

SB902

C5

B2

A3

D2 B5

A5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF101

GRAPHIC SCALES

GENERAL NOTES

EXISTING KEYNOTES

SECOND FLOOR FRAMING PLAN A3

KEYNOTES

FLOOR ELEVATIONS

CANOPY FRAMING PLAN A2

C2 B2

B2

B3

B5

A3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF102

THIRD FLOOR REINFORCING PLAN A3

GRAPHIC SCALE

GENERAL NOTES

EXISTING KEYNOTE

B5

A2 C2 B2

C5

C2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF103

THIRD FLOOR FRAMING PLAN A3

GRAPHIC SCALE

GENERAL NOTES

EXISTING KEYNOTES

KEYNOTES

INTERMEDIATE THIRD FLOOR FRAMING PLANA2

B5

C2

C2

C2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF104

FOURTH FLOOR FRAMING PLAN A3

GRAPHIC SCALE

GENERAL NOTES

EXISTING KEYNOTES

KEYNOTES

C3

C2

C4

C5

A2

B5

C4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF105

ROOF FRAMING PLAN A3

GRAPHIC SCALE

EXISTING KEYNOTES

KEYNOTES

CONNECTOR ROOF FRAMING PLANA2

SECOND FLOOR REINFORCEMENT SECTION D2

C5B2

12x14 TIMBER BEAM REINFORCEMENT DETAILC5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF201

THIRD FLOOR REINFORCEMENT SECTION 2 B2

THIRD FLOOR REINFORCEMENT SECTION 1 C2

C5 A2

A5

B2

B2

12x12 TIMBER BEAM REINFORCEMENT DETAILC5

W8x18 TO W10x30 CONN DETAIL A2 W16x26 TO W10x30 CONN DETAIL A5

TYP BEAM BEARING PLATE IN EXIST BRICK WALLA3 N

A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF202

FOURTH FLOOR REINFORCEMENT SECTION C2

A2

A4 12x12 TIMBER BEAM REINFORCEMENT DETAILC5

3/4" DIA STL ROD TO EXIST 6x12± TIMBER BEAM CONN DETAILA2 3/4" DIA STL ROD TO EXIST 12x12± TIMBER BEAM CONN DETAILA4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF203

MASONRY WALL 1 ELEVATION - MW1A2 MASONRY WALL 2 ELEVATION - MW2A4 MASONRY WALL 3 ELEVATION - MW3A5

A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF204

GRAPHIC SCALE

GENERAL NOTES KEYNOTES

KEY PLAN

A2 A4

A5

MASONRY WALL 4 ELEVATION - MW4A2 MASONRY WALL 5 ELEVATION - MW5A3 MASONRY WALL 6 ELEVATION - MW6A5

A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF205

GRAPHIC SCALE

GENERAL NOTES KEYNOTES

KEY PLAN

A2

A5

GRAPHIC SCALE

KEY PLAN

A3

MASONRY WALL 7 ELEVATION - MW7A2 MASONRY WALL 8 ELEVATION - MW8A3 MASONRY WALL 9 ELEVATION - MW9A4 MASONRY WALL 10 ELEVATION - MW10A5

A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF206

GRAPHIC SCALE

GENERAL NOTES KEYNOTES

KEY PLAN

A2

A3 A4

A5

ELEVATION - MW11 B3

MASONRY WALL 11

ELEVATION - MW12 B4

MASONRY WALL 12

ELEVATION - MW13 B5

MASONRY WALL 13

ELEVATIONS - MW14 AND MW15C2

MASONRY WALL 14 AND 15

ELEVATION - MW16 B2

MASONRY WALL 16

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF207

GRAPHIC SCALE

GENERAL NOTES KEYNOTES

KEY PLAN

B4

B3

B5

C2 C2

W8x18 BEAM SPLICE DETAILD1 W10x30 BEAM SPLICE DETAILD2 W16x26 BEAM SPLICE DETAILC3 W10x30 TO HSS 5x5x1/4 COL CAP PLATE DETAILC5

W10x30 TO W10x30 CONN DETAILB2

B5

EXIST 4x6± JOIST TO W8x18 CONN DETAILB3

B3

W8x18 TO W10x30 CONN DETAILB5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF501

TYP W8x10 TO CMU WALL CONN DETAILC2 TYP ROOF DECK SUPPORT DETAILC3

TYP BEAM TO BEAM CONN DETAILD4

TYP W8x24 TO HSS 4x4x3/8 CONN DETAILC5

TYP EXIST FLOOR DIAPHRAGM CONN DETAILB2

2x8 HEADER BEAM DETAIL AT EXIST 4x9±B3 TYP BUILDING ISOLATION JOINT DETAILB5

C5

B5

TYP FLOOR INFILL FRAMING DETAIL A3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF502

TYP REINF CONC WALL CAP DETAIL C2

B5

TYP C12x20.7 TO HSS 3x3x3/8 CONN DETAIL C4

C5

B5

C2 TYP (3) 2x6 HEADER JOIST CONN DETAILC5

PIPE SLIDE SUPPORT DETAIL AT MANHOLE 389B2

TYP CANOPY SECTION A5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF503

CONNECTOR FOURTH FLOOR TRANSITION CONN DETAILC2

CONNECTOR ROOF RAFTER CONN DETAILC4

HSS 5x5x1/4 COLUMN SPLICE DETAILB4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF504

COLUMN SCHEDULE BEAM BEARING PLATE SCHEDULE

C5

C5

C2

C5

B4

TYP BASE PLATE DETAIL A2

BP1 BP2

TYP BEAM BEARING PLATE DETAIL B5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

6)

SF601

GENERAL REMOVALS NOTES EXISTING KEYNOTES REMOVALS KEYNOTES

A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AD001

FIRST FLOOR REMOVALS PLAN

SECOND FLOOR REMOVALS PLANC2

A2

A5C5

C2

A2

A5C5

C2

LEGEND

A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AD101

THIRD FLOOR REMOVALS PLAN A2

FOURTH FLOOR REMOVALS PLANC2

A2

A5C5

C2

A2

A5C5

C2

C2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AD102

ATTIC REMOVALS PLAN A2

ROOF REMOVALS PLAN C2

A2

A5C5

C2

A2

A5C5

C2

A1-A A3-A C2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AD103

BLDG 14

NORTH ELEVATION REMOVALS C2 WEST ELEVATION REMOVALS C5

SOUTH ELEVATION REMOVALS A2 EAST ELEVATION REMOVALS A5

GENERAL NOTES

A2

A3

A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AD201

SOUTH ELEVATION REMOVALS A2

GENERAL NOTES

WEST ELEVATION REMOVALS A3

C3

C2

LOUVER REMOVALS ELEVATION (TYP)

REMOVALS SECTION AT LOUVERC3

SECOND FLOOR WINDOW REMOVALA4

THIRD FLOOR WINDOW REMOVALC4

HANDRAIL REMOVALS AT STAIR 003B3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AD202

ROOF REMOVALS DETAIL - STEP 1A2 ROOF REMOVALS DETAIL - STEP 2A4

B4

A4 A4

B4

A4 A4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AD520

ROOF REMOVALS DETAIL - STEP 3A2

B4

A4 A4

ROOF REMOVALS DETAIL - STEP 3B4

ROOF REMOVALS DETAIL - STEP 3A4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AD521

B4-A B4-A

GENERAL WALL TYPE NOTES:

B4-A

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE001

TYP WALL PENETRATION FIRESTOPPING DETAILSD2

TYPICAL INTERIOR WALL DETAILSB4

TYPICAL GYP BD CONTROL JOINTA4

TYP SECURE WALL DETAIL D4

MANBAR BARRIER DETAILTYPICAL TOP OF WALL DETAIL C4

GENERAL SHEET NOTES

MOUNTING HEIGHTS NOTE

MOUNTING HEIGHTS LEGEND

GRAPHIC SCALE

STANDARD MOUNTING HEIGHTS A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE002

FIRST FLOOR PLAN

GENERAL NOTES

KEYNOTES

A2

C2

C2 A2

C1

C1

A2

D1

A4

C2

A2

C4

C4

LEGEND

A4

A4

C4

A2

A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE101

SECOND FLOOR PLAN

GENERAL NOTES

KEYNOTES

A2

C2

C2 A2

C2

C2

A1

C2

A2C5

A4

C2C2

C4

C4

C5

A4

C4

C3

A2

A2

C3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE102

THIRD FLOOR PLAN

GENERAL NOTES

KEYNOTES

A2

C2

C2 A2

C3

C4

A3

C2

A2 C2

C3

C2

C4

C4

C4 A4

C2

A2

A5

C5

A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE103

FOURTH FLOOR PLAN

GENERAL NOTES

KEYNOTES

A2

C2

C2 A2

C4

C3

C2

A2

A4

C4

C4

C4

C4

A2

A2

A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE104

ATTIC FLOOR PLAN

GENERAL NOTES

KEYNOTES

C2 A2

C2 A2

C2

B1

A4 C4

A2

B1

B2

A2

A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE105

ROOF PLAN A1

GENERAL NOTES

KEYNOTES

C2

C1 A1

A2

A2,A4

C2

A2

B1

A3

A4 C4

C1

C1 A1

A1

A2

C4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE120

FIRST FLOOR SIGNAGE PLANC1

SECOND FLOOR SIGNAGE PLANA3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE131

THIRD FLOOR SIGNAGE PLANB1

FOURTH FLOOR SIGNAGE PLANA3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE132

NORTH ELEVATION C2

SOUTH ELEVATION A2

GENERAL NOTES

KEYNOTES

A2

C2

KEYPLAN

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE201

KEYPLAN

WEST ELEVATION C2

EAST ELEVATION A2

GENERAL NOTES

KEYNOTES

B5

C2 A2

C2

C2

B5

C5

C5

PARTIAL SOUTH ELEVATION A4

TOWER NORTH ELEVATION C4

A2

A4 C4

A1C

A1D

A1D

A1A

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE202

BUILDING SECTION C2

A2

KEYPLAN

C2

B5

GRAPHIC SCALESGENERAL NOTESBUILDING SECTION A2

A3A1

A3

A5

C2

GRANITE DETAIL C5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE221

A4

C3

C2

A5

C2

C3

C2

A5

B1D

WALL SECTION A1 WALL SECTION A3

C3

A5

A2

C5

A3

A3

C5

C1

C1

GRAPHIC SCALES

WALL SECTION DETAIL A5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE301

KEYNOTES

WALL SECTION A2

C1

A2C

A3C

A3

WALL AT CORNICE DETAIL B4

B4

D5

DORMER ENLARGED FLOOR PLAN C4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE302

GENERAL NOTES

TOILET 106 ENLARGED FLOOR PLAND1

D1

ENLARGED FLOOR PLAN C1

MEN 209 ENLARGED FLOOR PLANA1 MEN 209 ELEVATION A3

C1 A1

KEYNOTES

TOILET ROOM ACCESSORY SCHEDULE

A4

A3

TOILET 106 ELEVATIOND2

TOILET 126 ELEVATION C3

TOILET 106 ELEVATIOND3

BREAKROOM 127 ELEVATIONC4TOILET 126 ELEVATIONC2

MEN 209 ELEVATION B3

B3

TYP PORCELAIN WALL TILE PATTERNB4

B1B3

TOILET 126/BREAK 127

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE401

GENERAL NOTES

C5

KEYNOTE

WOMEN 202 ENLARGED FLOOR PLANC5

WOMEN 306 ENLARGED FLOOR PLANC2 MEN 316 ENLARGED FLOOR PLANC3

WOMEN 306 ELEVATION B1

C2 C3

MEN 316 ELEVATION A1

WOMEN 306 ELEVATION B2 MEN 316 ELEVATION B3

WOMEN 202 ELEVATION A2 WOMEN 202 ELEVATION A3

B1

A3

A3 A3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE402

GENERAL NOTE

STAIR 001 FIRST FLOOR PLANC1 STAIR 001 SECOND FLOOR PLANC2 STAIR 001 THIRD FLOOR PLANC3 STAIR 001 FOURTH FLOOR PLANC4

C1 C2 C3 C4

C2

KEYNOTES

A2 A2 A2 A2

C1

EXISTING KEYNOTE

A1A3 B3

A3

RAILING DETIAL A1 FIRE BLANKET STAIR DETAIL A3 CONCRETE CAP DETAIL A4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE441

ELEVATOR AND STAIR 004 SECOND FLOOR PLANC2

ELEVATTO AND STAIR 004 FIRST FLOOR PLANA2

ELEVATOR AND STAIR 004 FOURTH FLOOR PLANC3

ELEVATOR AND STAIR 004 THIRD FLOOR PLANA3

KEYPLAN

C2 C3

A2 A3

THIRD FLOOR RAMP PLAN C4

C2

C2

C3

KEYNOTE

A2

A2

A2 A2

C4

A2 A2

A2A2

B2

A4 A4

A4 A4

A2

B5

C3

A2A2

A2 A2

C3

C3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE442

GENERAL NOTES

STAIR 004 SECTION A4

KEYNOTE

B4

C1

C1

C1

B3

A1

C1

C1

A4

ELEVATOR SECTION A2

A2

A1

B3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE443

STAIR 001 SECTION A2

KEYPLAN

A2

GENERAL NOTES

KEYNOTE

C3

C1

C1

C1

C1

C1

A4

B3

LADDER DETAIL

A4

(TYP) LADDER SUPPORT DETAIL

C4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE444

TYPICAL TOP LANDING ELEVATIONB5RAILING DETAILS B4

B4A

B4A

B4C

B4C

INTERMEDIATE LANDING (TYP)C1

INTERMEDIATE LANDING (TYP)A1

FIRST FLOOR LANDING (TYP)A3

FIRST FLOOR LANDING (TYP)B3

SECOND FLOOR LANDING (TYP)C3

TREAD DETAIL D5

SAFETY GATE (TYP) A4

D5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE445

ELEVATOR DOOR DETAILS A4ELEVATOR DOOR DETAIL A2

KEYNOTES

RAMP SECTION C2

B4A B4B

A4A

A2

A4C

TYPICAL ELEVATOR DOOR ELEVATION D4

A4B

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE446

PLAN DETAIL C5

GENERAL NOTES

PLAN DETAIL C2PLAN DETAIL C1

PLAN DETAIL A1

PLAN DETAIL B1

PLAN DETAIL A3

PLAN DETAIL B3

PLAN DETAIL A4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE501

PLAN DETAIL A3 PLAN DETAIL A4

PLAN DETAIL B3 PLAN DETAIL B5

C3CURTAIN WALL TO CMU WALL DETAIL

A2INSIDE / OUTSIDE STONE VENEER OVER CMU WALL PLAN DETAIL

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE502

KNEEWALL INSULATION DETAIL C1 ATTIC FLOOR INSULATION DETAILC3 ROOF INSULATION DETAIL C4

A5

DORMER INFIL/ INSULATION DETAILB5

DORMER INSULATION DETAIL A5

B5

C1

C4

BUILDING PART SECTION A2

C3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE511

SECTION AT DORMER SILL C2

ATTIC FLOOR INSULATION PLANB2

INSULATION AT FLOOR DETAIL C5TRIM INSULATION DETAIL C3

WINDOW ELEVATION

A4

INSULATION AT THIRD FLOOR

WINDOW ELEVATION

A3

INSULATION AT SECOND FLOOR

WINDOW ELEVATION

A2

INSULATION AT FIRST FLOOR

C2

C2 C2

A5

A2

C3

A4

C3 C3

INSULATION ELEVATION

A5

HISTORICAL STAIR

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE512

INSULATION AT WINDOW HEAD DETAILC2

INSULATION AT FIRST FLOOR WINDOW SILL DETAILA2 INSULATION AT SECOND FLOOR WINDOW SILL DETAILA4 INSULATION AT THIRD FLOOR WINDOW SILL DETAILA5

INSULATION AT WINDOW JAMB DETAILC3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE513

FLOOR ISOLATION JOINT DETAIL

A2

CEILING ISOLATION JOINT DETAIL

D2

ROOF ISOLATION JOINT DETAIL

A3

C2

CURTAIN WALL

ISOLATION JOINT DETAIL

A5

WALL ISOLATION JOINT DETAIL

B5

METAL PANEL WALL

ISOLATION JOINT DETAIL

D5

CURTAIN WALL TO METAL PANEL

WALL ISOLATION JOINT DETAIL

B2

FLOOR TO WALL

ISOLATION JOINT DETAIL

CEILING ISOLATION JOINT DETAIL

B3

SEALING ISOLATION SYSTEM

C3

TYP SELF EXPANDING FOAM

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE514

GRAPHIC SCALEMETAL PANEL DETAILS

A1

GENERAL NOTE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE515

WALL SECTION DETAIL A2 WALL SECTION DETAIL A3

WALL SECTION DETAIL A5

SECOND FLOOR OPENING ELEVATIONC1 OPENING JAMB DETAIL C3

GRAPHIC SCALES

WALL SECTION DETAIL C5

C3

A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE516

ROOF CONNECTION DETAIL - STEP 1A2 ROOF CONNECTION DETAIL - STEP 2A4

C1

C3 C3

D5

B5

A5

A1E

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE520

ROOF CONNECTION DETAIL - STEP 3A2 ROOF CONNECTION DETAIL - STEP 4A4

C3

A1

A3

C4

C3

C1

C1

B1

B3

A3

D5

B5

A5

A1D

A1E

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE521

EXIST DORMER RIDGE DETAIL C1 CONNECTOR RIDGE DETAIL C3

EXIST DORMER ROOF-TO-WALL DETAILA1 CONNECTOR ROOF-TO-WALL DETAILA3

EXIST DORMER VALLEY DETAIL C4

A1A

CANNOPY SECTION A5

CANNOPY SECTION DETAIL B5

A5

CANOPY PLAN C5

B5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE522

DORMER ROOF CONNECTION DETAILC1 ISOLATION JOINT DETAIL C3 ROOF-TO-WALL DETAIL C4

EAVE/ ROOF-TO-WALL DETAIL B1 ROOF-TO-WALL DETAIL B3

A3

B4

A1

A4

FLASHING DETAIL B4

STANDING SEAM HEADWALL DETAILA1 GUTTER DETAIL A3 ISOLATION JOINT DETAIL A4

C5

FLASHING TRANSITION DETAIL C5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE523

SBS MODIFIED BITUMEN ROOF SYSTEMC1

ROOF DRAIN DETAIL A4TYP PARAPET WALL DETAIL A1

ROOF HATCH DETAIL B4RADON VENT DETAIL B1

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE524

LIGHTNING TERMINAL DETAIL A3ELEVATOR SHAFT ROOF DETAIL A1

TYP FALL PROTECTION RAILING DETAILC1

VENT THRU ROOF (VTR) DETAIL A4

ROOF TO SIDING DETAIL B3

C1

TYP FALL PROTECTION RAILING ELEVATIONC3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE525

STAIR A

ELECTRICAL

STAIR B

FLOOR

NO ROOF ACCESS

FIRST FLOOR TO

FOURTH FLOOR

EXIT ON FIRST FLR

USER TEXT

USER TEXT

SIGN TYPES A1

ROOM

ACCESSIBLE EXIT AT

ELEVATOR STAIR TOWER

IN CASE OF FIRE

DO NOT USE ELEVATOR.

USE EXIT STAIR UNLESS

OTHERWISE INSTRUCTED.

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE531

GENERAL SIGNAGE NOTES

SIGNAGE SCHEDULE

SIGNAGE ELEVATION B4 SIGNAGE DETAIL B5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE532

TYP SECTION AT BASE CABINET B1

TYP SECTION AT SINK COUNTER A3

TYP SECTION AT SINK BASE CABINETB3

TYP SECTION AT SHELF A4SECTION AT COUNTER A1

SECTION AT OPEN SHELVING B4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE541

DOOR SCHEDULE

DOOR SCHEDULE NOTES

DOOR TYPES B4

FRAME TYPES A4

DOOR SCHEDULE

DOOR SCHEDULE GENERAL NOTES

SCHEDULE KEY

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE601

INTERIOR DOOR DETAILS C2

INTERIOR DOOR DETAILS AT CMU WALLA2

AT FURRED CMU WALL B4

EXTERIOR DOOR DETAILS A3

INTERIOR DOOR DETAILS

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE602

GRAPHIC SCALESDOOR E01 DETAILS

A1

FLASHING DETAIL

C4

SILL FLASHING DETAIL

A5

A5

GENERAL NOTES

A1-B

A1-C

A1-D

DOOR E01 EXTERIOR ELEVATION

C5

A1-A

A1-E

DOOR E01 INTERIOR ELEVATION

B5

C4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE603

WINDOW REPAIR AND RESTORATION SCHEDULE REMARKS

WINDOW REPAIR AND RESTORATION SCHEDULE

WINDOW REPAIR AND RESTORATION CLASS NOTES

CLASS I REPAIR AND RESTORATION

CLASS II REPAIR AND RESTORATION

WINDOW REPAIR AND RESTORATION GENERAL NOTES

WINDOW REPAIR AND RESTORATION SCHEDULE [OPTION 5]

WINDOW REPAIR AND RESTORATION SCHEDULE [OPTION 5]

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE621

WINDOW REPAIR AND RESTORATION TYPESC2 EXTERIOR METAL SCREENS C5

C2

C3

A4

B1B

A2 A5

A3

B1A

B1D

B1B

B1C

INTERIOR STORM WINDOWS A2

A5C

A5B

A5A

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE622

WINDOW TYPES D2

A2B

A2C

A2A

CURTAINWALL TYPES A2

GRAPHIC SCALEGENERAL NOTE

TYPICAL EXTERIOR GLAZING DETAILD4

DETAIL AT ROUGH OPENING (TYP)A5

MEMBRANE FLASHING SEQUENCE

A2B

A2C

A2A

A2B

A2C

A2A

A4

C5

A4

C5

C3C3

A3A

A3C

A3B

A4B A4B

LOUVER DETAIL C4

A2B

A2C

A2A

C3C3 A2B

A2C

A2A

C4

A5C

A5B

A5A

A4C A4C

A3A3

A3

A3

C3

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE625

DETAILS AT FOURTH FLOOR B3WOOD WINDOW DETAILSB1

SALVAGED INTERIOR STORM WINDOW

INTERIOR STORM WINDOW DETAILS AT STAIR 001A5

INTERIOR STORM WINDOW DETAILS AT OCULUS A3 WINDOW GUARDRAIL DETAIL AT STAIR 001A4

WINDOW GUARDRAIL DETAIL AT STAIR 004C4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE626

FIXED ALUMINUM WINDOW DETAILSA2

A3TYPICAL CURTAINWALL DETAILS AT DOOR CURTAINWALL DETAILS AT FOURTH FLOORA4

ALUMINUM DOOR DETAILSA5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE627

CURTAINWALL SILL DETAIL AT FIRST FLOORC4

CURTAINWALL SILL DETAIL AT FOURTH FLOORC5

SPANDREL CURTAINWALL DETAILA3 CURTAINWALL HEAD DETAIL AT THIRD FLOORA4CURTAINWALL DETAILS AT FOURTH FLOORA2

GENERAL NOTE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE628

ROOM FINISH SCHEDULE ROOM FINISH SCHEDULE

ROOM FINISH

SCHEDULE LEGEND

COLOR KEY / MANUFACTURER GUIDE

ROOM FINISH SCHEDULE NOTES ROOM FINISH GENERAL NOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE641

FIRST FLOOR REFLECTED CEILING PLAN

KEYNOTES

CEILINGLEGEND

GRAPHIC SCALE N

A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE701

SECOND FLOOR REFLECTED CEILING PLAN

GENERAL NOTES

GRAPHIC SCALES

SOFFIT DETAIL A1

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE702

THIRD FLOOR REFLECTED CEILING PLAN GRAPHIC SCALE

KEYNOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE703

FOURTH FLOOR REFLECTED CEILING PLAN

GENERAL NOTE

KEYNOTES

C1

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE704

SOFFIT DETAIL C1

CEILING ENTRY ALCOVE DETAILC3

WALL DETAIL C5

SOFFIT DETAIL B5

THIRD FLOOR LIGHT WELL DETAILA3SECOND FLOOR LIGHT WELL DETAILA2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE721

BREAK ROOM 305 ELEVATIONB4 BREAK ROOM 305 ELEVATIONB5

OPEN OFFICE 207 ELEVATIONC1

B1

A4

B3

OPEN OFFICE 201 ELEVATIONA4

B1B4

OPEN OFFICE 207 ELEVATIOND1

BREAK ROOM 206 ELEVATIONB1

BREAK ROOM 206 ELEVATIONA2

KEYNOTE

A1

A1

C5

B1

B3

A4 A1

A1

AE740

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

EXPRESSING 312 ELEVATION B1

A3

OPEN OFFICE 108 ELEVATIONB2 OPEN OFFICE 402 ELEVATIONB3

CORRIDOR 112 ELEVATION A1

B1

A4

B3 A4 B3 B1

OPEN OFFICE 303 ELEVATIONC1

CORRIDOR 112 ELEVATION B4

STORAGE 118 ELEVATION A3

A1

A1

ATM LOBBY 119 ELEVATION A4

OPEN OFFICE 303 ELEVATIOND1

AE741

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

KEYNOTES

C2

C3

C2

OPEN OFFICE 402 ELEVATION D2 OPEN OFFICE 402 ELEVATION D3

A1

STORAGE 129 ELEVATION D4

AE742

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

FIRST FLOOR FF&E PLAN B1

GENERAL NOTES

FF&E SCHEDULE

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE801

SECOND FLOOR FF&E PLAN B1

FF&E SCHEDULE

GENERAL NOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE802

THIRD FLOOR FF&E PLAN B1

FF&E SCHEDULE

GENERAL NOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE803

FOURTH FLOOR FF&E PLAN B1

FF&E SCHEDULE

GENERAL NOTES

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE804

KEYPLAN

BREAK ROOM 206 FLOOR PATTERN PLANA2

FIRST FLOOR FLOORING PLAN C2 TYP PORCELAIN FLOOR TILE PATTERNC4

OPEN OFFICE FLOORING DETAILB4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE810

FIRST FLOOR REMOVALS PLAN [OPTION 3]

GENERAL NOTES

KEYPLAN

B4B2

FIRST FLOOR PLAN [OPTION 3] B4

LEGEND

B2

KEYNOTES

REMOVALS KEYNOTES

C1

A4

A2

PLAN DETAIL A4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE901

DOOR SCHEDULE [OPTION 3]

DOOR SCHEDULE GENERAL NOTES DOOR SCHEDULE NOTES

ROOM FINISH SCHEDULE [OPTION 3]

ROOM FINISH SCHEDULE GENERAL NOTES ROOM FINISH SCHEDULE NOTES

LOBBY 121 ELEVATION [OPTION 3]C2

TELLERS 124 ELEVATION [OPTION 3]B2

TELLERS 124 COUNTER PLAN [OPTION 3]A2

TELLERS 124 ELEVATION [OPTION 3]C4

B1 B1 A5

A5

TYP TELLER COUNTER SECTION A5

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE961

SECOND FLOOR REFLECTED CEILING PLAN [OPTION 6]

KEYNOTES

GENERAL NOTE

B2

CEILING PANEL DETAIL [OPTION 6] A2 CEILING PANEL LAYOUTS [OPTION 6] A4

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE971

THIRD FLOOR REFLECTED CEILING PLAN [OPTION 6]B2

GENERAL NOTE

KEYNOTES

TYP CLOUD EDGE DETAIL [OPTION 6] A2

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

B

N E

W S

TA

IR

/L

IF

E S

A

FE

TY

/P

O W

E R

IM

P

R O

V E

M E

N

TS

R

M

-1

AE972

01_GENERAL
G-001A COVER SHEET - VOLUME 1
G-002A LIST OF DRAWINGS - VOLUME 1
G-002B LIST OF DRAWINGS - VOLUME 2
G-003A ABBREVIATIOS, LEGEND, AND GENERAL PROJECT NOTES
G-004 CONSTRUCTION SEQUENCE STRATEGY
G-005 SITE CONSTRAINTS AND REQUIREMENTS PLAN - PHASE 1
G-006 SITE CONSTRAINTS AND REQUIREMENTS PLAN - PHASE 2
G-007 UTILTES OUTAGE PLAN - WATER AND STEAM
G-008 CONSTRUCTION BARRIER DETAILS
G-009 OUTAGE SCHEDULE
G-101 CODE COMPLIANCE SITE PLAN
G-102 CODE COMPLIANCE SUMMARY SHEET 1
G-103 CODE COMPLIANCE SUMMARY SHEET 2
G-104 FIRST FLOOR LIFE SAFETY PLAN
G-105 SECOND FLOOR LIFE SAFETY PLAN
G-106 THIRD FLOOR LIFE SAFETY PLAN
G-107 FOURTH FLOOR LIFE SAFETY PLAN
G-108 ATTIC LIFE SAFETY PLAN
G-901 FIRST FLOOR LIFE SAFETY PLAN [OPTION 3]
02_HAZARDOUS MATERIALS
HM101 FIRST AND SECOND FLOOR HAZAEDOUS MATERIALS REMOVALS PLANS
HM102 THIRD AND FOURTH HAZARDOUS MATERIALS REMOVALS PLANS
HM103 ROOF HAZARDOUS MATERIALS REMOVALS PLAN
03_CIVIL
C-001 CIVIL NOTES
C-002 CIVIL LEGEND AND ABBREVIATIONS
CX101 SITE EXISTING CONDITIONS PLAN
CX501 SITE EXISTING UTILITY STRUCTURE DETAILS 1
CX502 SITE EXISTING UTILITY STRUCTURE DETAILS 2
CR101 SITE REMOVALS PLAN
CS101 SITE AND UTILITIES PLAN
CG101 GRADING, DRAINAGE AND ERROSION CONTROL PLAN
C-201 STORM DRAIN PROFILES
C-202 WATER LINE PROFILES
C-501 SITE DETAILS 1
C-502 SITE DETAILS 2
C-503 SITE DETAILS 3
C-504 SITE DETAILS 4
C-505 SITE DETAILS 5
C-506 SITE DETAILS 6
C-507 SITE DETAILS 7
B-001 BORING LOGS 1
B-002 ENVIORMENTAL TEST RESULTS
04_STRUCTURAL
S-001 STRUCTURAL NOTES
S-002 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS
S-003 DESIGN LOADS
SD101 FOUNDATION REMOVALS PLAN
SD102 SLAB REMOVALS PLAN
SD103 SECOND FLOOR FRAMING REMOVALS PLAN
SD104 THIRD FLOOR FRAMING REMOVALS PLAN
SD105 FOURTH FLOOR FRAMING REMOVALS PLAN
SD106 ROOF FRAMING REMOVALS PLAN
SB101 FOUNDATION PLAN
SB102 SLAB PLAN
SB501 FOUNDATION DETAILS 1
SB502 FOUNDATION DETAILS 2
SB901 FOUNDATION PLAN [OPTION 3]
SB902 SLAB PLAN [OPTION 3]
SF101 SECOND FLOOR FRAMING PLAN
SF102 THIRD FLOOR REINFORCING PLAN
SF103 THIRD FLOOR FRAMING PLAN
SF104 FOURTH FLOOR FRAMING PLAN
SF105 ROOF FRAMING PLAN
SF201 SECOND FLOOR REINFORCEMENT SECTION
SF202 THIRD FLOOR REINFORCEMENT SECTIONS
SF203 FOURTH FLOOR REINFORCEMENT SECTION
SF204 MASONRY WALL ELEVATIONS 1
SF205 MASONRY WALL ELEVATIONS 2
SF206 MASONRY WALL ELEVATIONS 3
SF207 MASONRY WALL ELEVATIONS 4
SF501 STRUCTURAL DETAILS 1
SF502 STRUCTURAL DETAILS 2
SF503 STRUCTURAL DETAILS 3
SF504 STRUCTURAL DETAILS 4
SF601 COLUMN SCHEDULE
05_ARCHITECTURAL
AD001 GENERAL REMOVALS NOTES, EXISTING KEYNOTES, AND REMOVALS KEYNOTES
AD101 FIRST AND SECOND FLOOR REMOVALS PLANS
AD102 THIRD AND FOURTH FLOOR REMOVALS PLANS
AD103 ATTIC AND ROOF REMOVALS PLANS
AD201 EXTERIOR ELEVATION REMOVALS
AD202 EXTERIOR ELEVATION REMOVALS DETAILS
AD520 ROOF REMOVALS DETAILS 1
AD521 ROOF REMOVALS DETAILS 2
AE001 WALL TYPES
AE002 FIRESTOPPING DETAILS AND STANDARD MOUNTING HEIGHTS
AE101 FIRST FLOOR PLAN
AE102 SECOND FLOOR PLAN
AE103 THIRD FLOOR PLAN
AE104 FOURTH FLOOR PLAN
AE105 ATTIC FLOOR PLAN
AE120 ROOF PLAN
AE131 FIRST AND SECOND FLOOR SIGNAGE PLANS
AE132 THIRD AND FOURTH FLOOR PLANS
AE201 EXTERIOR ELEVATIONS 1
AE202 EXTERIOR ELEVATIONS 2
AE221 BUILDING SECTIONS
AE301 WALL SECTIONS 1
AE302 WALL SECTIONS 2
AE401 ENLARGED TOILET ROOM PLANS AND INTERIOR ELEVATIONS 1
AE402 ENLARGED TOILET ROOM PLANS AND INTERIOR ELEVATIONS 2
AE441 ENLARGED STAIR 001 PLANS AND MISCELLANEOUS DETAILS
AE442 ENLARGED ELEVATOR, STAIR 004, AND RAMP PLANS
AE443 ELEVATOR AND STAIR 004 SECTIONS
AE444 STAIR 001 SECTION
AE445 STAIR DETAILS
AE446 ELEVATOR AND RAMP DETAILS
AE501 PLAN DETAILS 1
AE502 PLAN DETAILS 2
AE511 INSULATION DETAILS 1
AE512 INSULATION DETAILS 2
AE513 INSULATION DETAILS 3
AE514 ISOLATION JOINT DETAILS
AE515 METAL PANEL DETAILS
AE516 WALL DETAILS
AE520 DORMER DETAILS 1
AE521 DORMER DETAILS 2
AE522 ROOF DETAILS 1
AE523 ROOF DETAILS 2
AE524 ROOF DETAILS 3
AE525 ROOF DETAILS 4
AE531 SIGN TYPES
AE532 SIGNAGE SCHEDULE AND DETAILS
AE541 CASEWORK DETAILS
AE601 DOOR SCHEDULE
AE602 DOOR DETAILS 1
AE603 DOOR DETAILS 2
AE621 WINDOW REPAIR AND RESTORATION NOTES AND SCHEDULES
AE622 WINDOW REPAIR AND RESTORATION WINDOW TYPES, AND STORM WINDOW AND METAL SCREEN DETAILS
AE625 WINDOW TYPES
AE626 WINDOW DETAILS 1
AE627 WINDOW DETAILS 2
AE628 WINDOW DETAILS 3
AE641 ROOM FINISH SCHEDULE AND COLOR KEY/MANUFACTURER GUIDE
AE701 FIRST FLOOR REFLECTED CEILING PLAN
AE702 SECOND FLOOR REFLECTED CEILING PLAN
AE703 THIRD FLOOR REFLECTED CEILING PLAN
AE704 FOURTH FLOOR REFLECTED CEILING PLAN
AE721 CEILING DETAILS
AE740 INTERIOR ELEVATIONS 1
AE741 INTERIOR ELEVATIONS 2
AE742 INTERIOR ELEVATIONS 3
AE801 FIRST FLOOR FF&E PLAN AND SCHEDULE [OPTION 1]
AE802 SECOND FLOOR FF&E PLAN AND SCHEDULE [OPTION 1]
AE803 THIRD FLOOR FF&E PLAN AND SCHEDULE [OPTION 1]
AE804 FOURTH FLOOR FF&E PLAN AND SCHEDULE [OPTION 1]
AE810 FLOORING PATTERN PLANS AND DETAILS
AE901 FIRST FLOOR PLANS [OPTION 3]
AE961 DOOR AND ROOM FINISH SCHEDULE [OPTION 3]
AE971 SECOND FLOOR REFLECTED CEILING PLAN [OPTION 6]
AE972 THIRD FLOOR REFLECTED CEILING PLAN [OPTION 6]
2024-03-28T11:51:55-0400
MERCER.CHELSEA.ANN.1618149796

File details come from the government source that posted it. Updated .