B14 Specifications_SBD_03-22-24.pdf

PDF 23 MB Posted

Attached to
DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE
Solicitation number
N4008524R2534
Issued by

About this file

This document is the B14 Specifications for the Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project includes a total interior renovation of the 22,705 square foot historic Building 14, which requires utility upgrades, egress/fire life safety/accessibility compliance upgrades, exterior envelope repairs, structural upgrades, and hazardous material removal. The scope of work includes modifying or replacing the building's floors, adding two code-compliant internal stairs, adding a building addition for an elevator, restoring historic windows, repointing and repairing masonry, repairing historic timber framing, and overhauling the building's mechanical, electrical, and fire protection systems. The solicitation number is N4008524R2534, and the contract will be awarded by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 006 - attachment 2- J and A Toilet Accessories .pdf PDF
Amendment 0006 - B14.pdf PDF
Amendment 006 - attachment 1 - J and A Interior Finishes.pdf PDF
Amendment 0005 - Attachment 1 - M503.pdf PDF
Amendment 0005 B14.pdf PDF
Amendment 0004 Attachment 1 M-502 for PPI 153.pdf PDF
Amendment 0004 B14.pdf PDF
Amendment 0004 attachment 2 Amendment Dwgs.pdf PDF
Amendment 0003 - Enclosure (2) for PPI 17.xlsx XLSX spreadsheet
Amendment 0003 B14.pdf PDF
Amendment 0003 - Enclosure (3) for PPI 101.pdf PDF
Amendment 0002 B14.pdf PDF
Amendment 0001 B14.pdf PDF
Amendment 0001 - Attachment 1 - Revised Drawings Specs .pdf PDF
Amendment 0001 - Attachment G- Price Proposal Form REV .docx DOCX document
Amendment 0001 - Attachment 2 - Site Visit Sign-in Sheet.pdf PDF
B14 Drawings - Volume 2_SBD_03-28-24.pdf PDF
N4008524R2534 B14.pdf PDF
Attachment E-Small Business Participation Commitment Document.docx DOCX document
Attachment H - PIEE Vendor Access Instructions.pdf PDF
Attachment F - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
Attachment D- Historical Small Business Utilization.docx DOCX document
B14 Drawings - Volume 1_SBD_03-28-24.pdf PDF
Attachment G - Price Proposal Form .docx DOCX document
Attachment K - SF 5512 site visit .pdf PDF
Attachment A - Pre-proposal Inquiry Form.xls XLS spreadsheet
Attachment B - Construction Experience Project data sheet.docx DOCX document
Attachment C - Past Performance Questionnaire (Form PPQ).docx DOCX document
Attachment J - DBIDS Access Request Form.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION STATEMENT F. Further dissemination only as directed by Portsmouth Naval Shipyard, NAVFAC (December 3, 2018) or higher DoD authority.

NAVFAC MIDLANT, Public Works Department, Maine eProjects Work Order No.: 1737894

SPECIFICATIONS

B14 New Stair/Life Safety/Power Improvements

At the

Portsmouth Naval Shipyard, Kittery, Maine

PREPARED BY:

NAVFAC Midlant PWD ME Building 59

Portsmouth Naval Shipyard Kittery, Maine 03801-2032

REQUEST FOR PROPOSAL PREPARED BY:

Architectural: Peter MacGovern, R.A. Electrical: Dale Lincoln, P.E.

Civil: Steve Sargent, P.E. Fire Protection: Laura Clebak, P.E.

Structural: David N. Martin, P.E., S.E. Environmental: N/A Mechanical: Andrew Kitchen, P.E. Estimating: Oak Point Associates

Submitted By: Scott Hughes, R.A. Signature Date: November 27, 2023

Approved By PME Signature Date: (Submittal Date) (Printed Name of CIBL/PMEB Head)

Design Manager: Signature Date: (Submittal Date) (Printed Name of NAVFAC DM) chelsea.mercer Typewritten Text 03/25/2024 chelsea.mercer Typewritten Text Chelsea Mercer jeffrey.f.hoyt Typewritten Text Jeff Hoyt, P.E.

jeffrey.f.hoyt Typewritten Text 3/25/24

B14 NEW STAI R/ LI FE SAFETY/ POWER I MPROVEMENTS 1737894

PORTSMOUTH NAVAL SHI PYARD, KI TTERY, ME

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00. 00 22 SUMMARY OF WORK ( PWD ME)

01 14 00. 00 22 WORK RESTRI CTI ONS ( PWD ME)

01 20 00. 00 22 PRI CE AND PAYMENT PROCEDURES ( PWD ME)

01 30 00. 00 22 ADMI NI STRATI VE REQUI REMENTS ( PWD ME)

01 30 10. 00 22 COORDI NATI ON PROCEDURES AND COORDI NATI ON DRAWI NGS ( PWD ME)

01 31 23. 13 20 ELECTRONI C CONSTRUCTI ON AND FACI LI TY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17. 00 20 NETWORK ANALYSI S SCHEDULES ( NAS)

01 33 00 SUBMI TTAL PROCEDURES

01 35 26. 00 22 GOVERNMENTAL SAFETY REQUI REMENTS ( PWD ME)

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 44 00. 00 22 ARCHAEOLOGI CAL MONI TORI NG ( PWD ME)

01 45 00. 00 22 QUALI TY CONTROL ( PWD ME)

01 45 35 SPECI AL I NSPECTI ONS

01 50 00. 00 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS ( PWD ME)

01 57 19. 00 22 TEMPORARY ENVI RONMENTAL CONTROLS - PORTSMOUTH NAVAL

SHI PYARD ( PWD ME)

01 58 00 PROJECT I DENTI FI CATI ON

01 74 19 CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL

01 78 00. 00 22 CLOSEOUT SUBMI TTALS ( PWD ME)

01 78 23 OPERATI ON AND MAI NTENANCE DATA

01 78 24. 00 20 FACI LI TY ELECTRONI C OPERATI ON AND MAI NTENANCE SUPPORT

I NFORMATI ON ( eOMSI )

01 91 00. 15 BUI LDI NG COMMI SSI ONI NG

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLI TI ON AND DECONSTRUCTI ON

02 42 91 REMOVAL AND SALVAGE OF HI STORI C CONSTRUCTI ON MATERI ALS

02 82 00. 00 22 ASBESTOS REMEDI ATI ON ( PNS PROJECTS)

02 83 00. 00 22 MANAGEMENT OF LEAD, CADMI UM, AND CHROMI UM ( VI ) DURI NG

RENOVATI ON, DEMOLI TI ON, CONSTRUCTI ON, REMOVAL AND

ABATEMENT ( PNS PROJECTS)

02 84 16 HANDLI NG OF LI GHTI NG BALLASTS AND LAMPS CONTAI NI NG PCBs

AND MERCURY

02 84 33 REMOVAL AND DI SPOSAL OF POLYCHLORI NATED BI PHENYLS ( PCBs)

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

03 45 33 PRECAST STRUCTURAL CONCRETE

DI VI SI ON 04 - MASONRY

04 01 00. 91 RESTORATI ON AND CLEANI NG OF MASONRY I N HI STORI C STRUCTURES

04 03 00 CONSERVATI ON TREATMENT FOR PERI OD MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

PROJECT TABLE OF CONTENTS Page 1

05 30 00 STEEL DECKS

05 40 00 COLD- FORMED METAL FRAMI NG

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

05 51 00 METAL STAI RS

05 51 33 METAL LADDERS

05 52 00 METAL RAI LI NGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 20 00 FI NI SH CARPENTRY

06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS

06 61 16 SOLI D SURFACI NG FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 11 13 BI TUMI NOUS DAMPPROOFI NG

07 13 53 ELASTOMERI C SHEET WATERPROOFI NG

07 21 13 BOARD AND BLOCK I NSULATI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 21 23 LOOSE FI LL THERMAL I NSULATI ON

07 22 00 ROOF AND DECK I NSULATI ON

07 27 19. 02 SELF- ADHERI NG AI R BARRI ERS AND AI R AND VAPOR CONTROL LAYERS

07 31 26 SLATE SHI NGLES

07 41 13 METAL ROOF PANELS

07 42 63 FABRI CATED WALL PANEL ASSEMBLI ES

07 52 00 MODI FI ED BI TUMI NOUS MEMBRANE ROOFI NG

07 57 14 SPRAYED POLYURETHANE FOAM ( SPF) I NSULATI ON

07 60 00 FLASHI NG AND SHEET METAL

07 62 13 COPPER SHEET METAL FLASHI NG AND TRI M

07 84 00 FI RESTOPPI NG

07 92 00 JOI NT SEALANTS

07 95 00 EXPANSI ON CONTROL

DI VI SI ON 08 - OPENI NGS

08 01 52 OPERATI ON AND MAI NTENANCE OF WOOD WI NDOWS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMI NUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 44 00 CURTAI N WALL AND GLAZED ASSEMBLI ES

08 51 13 ALUMI NUM WI NDOWS

08 51 69. 10 ALUMI NUM STORM WI NDOWS

08 56 63 DETENTI ON AND SECURI TY WI NDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZI NG

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 01 90. 50 PREPARATI ON OF HI STORI C WOOD AND METAL SURFACES FOR

PAI NTI NG

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMI C TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 68 00 CARPETI NG

PROJECT TABLE OF CONTENTS Page 2

09 72 00 WALLCOVERI NGS ( FRP)

09 90 00 PAI NTS AND COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00. 20 I NTERI OR SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHER CABI NETS

10 51 13 METAL LOCKERS

10 55 00 POSTAL SPECI ALTI ES

DI VI SI ON 12 - FURNI SHI NGS

12 00 01. 00 20 FURNI TURE, FI XTURES AND EQUI PMENT ( FF&E) PACKAGE

12 24 13 ROLLER WI NDOW SHADES

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 24 23 HYDRAULI C PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 12 00 STANDPI PE SYSTEMS

21 13 13 WET PI PE SPRI NKLER SYSTEMS, FI RE PROTECTI ON

21 13 16 DRY PI PE SPRI NKLER SYSTEMS, FI RE PROTECTI ON

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS

23 05 48. 00 40 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND

EQUI PMENT

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 08 00 COMMI SSI ONI NG OF MECHANI CAL AND PLUMBI NG SYSTEMS

23 09 00. 00 22 I NSTRUMENTATI ON AND CONTROL FOR HVAC ( PWD- MAI NE) ( J&A)

23 09 13. 00 22 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC

23 09 23. 02 22 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG

CONTROL SYSTEMS ( PWD- MAI NE)

23 21 13. 00 20 LOW TEMPERATURE WATER ( LTW) HEATI NG SYSTEM

23 22 26. 00 20 STEAM SYSTEM AND TERMI NAL UNI TS

23 30 00 HVAC AI R DI STRI BUTI ON

23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE

23 64 26 CHI LLED AND HOT WATER PI PI NG SYSTEMS

23 81 00 DECENTRALI ZED UNI TARY HVAC EQUI PMENT

23 82 00. 00 20 TERMI NAL HEATI NG UNI TS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 CYBERSECURI TY FOR FACI LI TY- RELATED CONTROL SYSTEMS

25 08 10 UTI LI TY MONI TORI NG AND CONTROL SYSTEM TESTI NG

25 10 10. 00 22 UTI LI TY MONI TORI NG AND CONTROL SYSTEM ( UMCS) FRONT END AND

I NTEGRATI ON ( PWD- MAI NE)

DI VI SI ON 26 - ELECTRI CAL

PROJECT TABLE OF CONTENTS Page 3

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 27 14. 00 20 ELECTRI CI TY METERI NG

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 51 00 I NTERI OR LI GHTI NG

26 56 00 EXTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

27 32 50 ELEVATOR LANDI NG TWO- WAY COMMUNI CATI ON SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE TESTI NG

28 10 05 ELECTRONI C SECURI TY SYSTEMS ( ESS)

28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM,

ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 23 00. 00 22 EXCAVATI ON AND FI LL

31 32 11 SOI L SURFACE EROSI ON CONTROL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19. 61 SEALI NG OF JOI NTS I N RI GI D PAVEMENT

32 12 17 HOT MI X BI TUMI NOUS PAVEMENT

32 17 23 PAVEMENT MARKI NGS

32 31 13. 53 HI GH- SECURI TY FENCES ( CHAI N LI NK)

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 30 00 SANI TARY SEWERAGE

33 40 00 STORMWATER UTI LI TI ES

33 46 13 FOUNDATI ON DRAI NAGE

33 63 13. 19 CONCRETE TRENCH HYDRONI C AND STEAM ENERGY DI STRI BUTI ON

33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

DI VI SI ON 34 - TRANSPORTATI ON

34 11 00 RAI LROAD TRACK AND ACCESSORI ES

DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS

40 17 26. 00 20 WELDI NG PRESSURE PI PI NG

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/ 11, CHG 1: 08/ 14

PART 1 GENERAL

1. 1 SUMMARY

Thi s Sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o Cont r act Cl ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

G- 002A LI ST OF - DRAWI NGS VOLUME 1

G- 002B LI ST OF DRAWI NGS - VOLUME 2

G- 003A ABBREVI ATI ONS, LEGEND, AND GENERAL PROJECT NOTES

G- 004 CONSTRUCTI ON SEQUENCE STRATEGY

G- 005 SI TE CONSTRANTS AND REQUI REMENTS PLAN - PHASE 1

G- 006 SI TE CONSTRANTS AND REQUI REMENTS PLAN - PHASE 2

G- 007 UTI LI TI ES OUTAGE PLAN - WATER AND STEAM

G- 008 CONSTRUCTI ON BARRI ER DETAI LS

G- 009 OUTAGE SCHEDULE

G- 101 CODE COMPLI ANCE SI TE PLAN

G- 102 CODE COMPLI ANCE SUMMARY SHEET 1

G- 103 CODE COMPLI ANCE SUMMARY SHEET 2

G- 104 FI RST FLOOR LI FE SAFETY PLAN

G- 105 SECOND FLOOR LI FE SAFETY PLAN

G- 106 THI RD FLOOR LI FE SAFETY PLAN

G- 107 FOURTH FLOOR LI FE SAFETY PLAN

G- 108 ATTI C LI FE SAFETY PLAN

G- 901 FI RST FLOOR LI FE SAFETY PLAN [ OPTI ON 3]

HM101 FI RST AND SECOND FLOOR HAZARDOUS REMOVALS PLANS

DOCUMENT 00 01 15 Page 1

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

HM102 THI RD AND FOURTH FLOOR HAZARDOUS REMOVALS PLANS

HM103 ROOF HAZARDOUS REMOVALS PLAN

C- 001 CI VI L NOTES

C- 002 CI VI L LEGEND AND ABBREVI ATI ONS

CX101 SI TE EXI STI NG CONDI TI ONS PLAN

CX501 SI TE EXI STI NG UTI LI TY STRUCTURE DETAI LS 1

CX502 SI TE EXI STI NG UTI LI TY STRUCTURE DETAI LS 2

CR101 SI TE REMOVALS PLAN

CS101 SI TE AND UTI LI TI ES PLAN

CG101 GRADI NG, DRAI NAGE AND EROSI ON CONTROL PLAN

C- 201 STORM DRAI N PROFI LES

C- 202 WATER LI NE PROFI LES

C- 501 SI TE DETAI LS 1

C- 502 SI TE DETAI LS 2

C- 503 SI TE DETAI LS 3

C- 504 SI TE DETAI LS 4

C- 505 SI TE DETAI LS 5

C- 506 SI TE DETAI LS 6

C- 507 SI TE DETAI LS 7

B- 001 BORI NG LOGS 1

B- 002 ENVI RONMENTAL TEST RESULTS

S- 001 STRUCTURAL NOTES

S- 002 STRUCTURAL GENERAL NOTES AND ABBREVI ATI ONS

S- 003 DESI GN LOADS

SD101 FOUNDATI ON REMOVALS PLAN

SD102 SLAB REMOVALS PLAN

SD103 SECOND FLOOR FRAMI NG REMOVALS PLAN

SD104 THI RD FLOOR FRAMI NG REMOVALS PLAN

DOCUMENT 00 01 15 Page 2

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

SD105 FOURTH FLOOR FRAMI NG REMOVALS PLAN

SD106 ROOF FRAMI NG REMOVALS PLAN

SB101 FOUNDATI ON PLAN

SB102 SLAB PLAN

SB501 FOUNDATI ON DETAI LS 1

SB502 FOUNDATI ON DETAI LS 2

SB901 FOUNDATI ON PLAN [ OPTI ON 3]

SB902 SLAB PLAN [ OPTI ON 3]

SF101 SECOND FLOOR FRAMI NG PLAN

SF102 THI RD FLOOR REI NFORCI NG PLAN

SF103 THI RD FLOOR FRAMI NG PLAN

SF104 FOURTH FLOOR FRAMI NG PLAN

SF105 ROOF FRAMI NG PLAN

SF201 SECOND FLOOR REI NFORCEMENT SECTI ON

SF202 THI RD FLOOR REI NFORCEMENT SECTI ONS

SF203 FOURTH FLOOR REI NFORCEMENT SECTI ON

SF204 MASONRY WALL ELEVATI ONS 1

SF205 MASONRY WALL ELEVATI ONS 2

SF206 MASONRY WALL ELEVATI ONS 3

SF207 MASONRY WALL ELEVATI ONS 4

SF501 STRUCTURAL DETAI LS 1

SF502 STRUCTURAL DETAI LS 2

SF503 STRUCTURAL DETAI LS 3

SF504 STRUCTURAL DETAI LS 4

SF601 COLUMN SCHEDULE

AD001 GENERAL REMOVALS NOTES, EXI STI NG KEYNOTES, AND

REMOVALS KEYNOTES

AD101 FI RST AND SECOND FLOOR REMOVALS PLANS

AD102 THI RD AND FOURTH FLOOR REMOVALS PLANS

DOCUMENT 00 01 15 Page 3

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

AD103 ATTI C AND ROOF REMOVALS PLANS

AD201 EXTERI OR ELEVATI ON REMOVALS

AD202 EXTERI OR ELEVATI ON REMOVALS DETAI LS

AD520 ROOF REMOVALS DETAI LS 1

AD521 ROOF REMOVALS DETAI LS 2

AE001 WALL TYPES

AE002 FI RESTOPPI NG DETAI LS AND STANDARD MOUNTI NG HEI GHTS

AE101 FI RST FLOOR PLAN

AE102 SECOND FLOOR PLAN

AE103 THI RD FLOOR PLAN

AE104 FOURTH FLOOR PLAN

AE105 ATTI C FLOOR PLAN

AE120 ROOF PLAN

AE131 FI RST AND SECOUND FLOOR SI GNAGE PLANS

AE132 THI RD AND FOURTH FLOOR PLANS

AE201 EXTERI OR ELEVATI ONS 1

AE202 EXTERI OR ELEVATI ONS 2

AE221 BUI LDI NG SECTI ONS

AE301 WALL SECTI ONS 1

AE302 WALL SECTI ONS 2

AE401 ENLARGED TOI LET ROOM PLANS AND I NTERI OR ELEVATI ONS 1

AE402 ENLARGED TOI LET ROOM PLANS AND I NTERI OR ELEVATI ONS 2

AE441 ENLARGED STAI R 001 PLANS MI SCELLANEOUS DETAI LS

AE442 ENLARGED ELEVATOR, STAI R 004, AND RAMP PLANS

AE443 ELEVATOR AND STAI R 004 SECTI ONS

AE444 STAI R 001 SECTI ON

AE445 STAI R DETAI LS

AE446 ELEVATOR AND RAMP DETAI LS

DOCUMENT 00 01 15 Page 4

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

AE501 PLAN DETAI LS 1

AE502 PLAN DETAI LS 2

AE511 I NSULATI ON DETAI LS 1

AE512 I NSULATI ON DETAI LS 2

AE513 I NSULATI ON DETAI LS 3

AE514 I SOLATI ON JOI NT DETAI LS

AE515 METAL PANEL DETAI LS

AE516 WALL DETAI LS

AE520 DORMER DETAI LS 1

AE521 DORMER DETAI LS 2

AE522 ROOF DETAI LS 1

AE523 ROOF DETAI LS 2

AE524 ROOF DETAI LS 3

AE525 ROOF DETAI LS 4

AE531 SI GN TYPES

AE532 SI GNAGE SCHEDULE AND DETAI LS

AE541 CASEWORK DETAI LS

AE601 DOOR SCHEDULE

AE602 DOOR DETAI LS 1

AE603 DOOR DETAI LS 2

AE621 WI NDOW REPAI R AND RESTORATOI N NOTES AND SCHEDULES

AE622 WI NDOW REPAI R AND RESOTRATI ON WI NDOW TYPES, STORM

WI NDOW AND METAL SCREEN DETAI LS

AE625 WI NDOW TYPES

AE626 WI NDOW DETAI LS 1

AE627 WI NDOW DETAI LS 2

AE628 WI NDOW DETAI LS 3

AE641 ROOM FI NI SH SCHEUDLE AND COLOR KEY/ MANUFACTURER GUI DE

AE701 FI RST FLOOR REFLECTED CEI LI NG PLAN

DOCUMENT 00 01 15 Page 5

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

AE702 SECOND FLOOR REFLECTED CEI LI NG PLAN

AE703 THI RD FLOOR REFLECTED CEI LI NG PLAN

AE704 FOURTH FLOOR REFLECTED CEI LI NG PLAN

AE721 CEI LI NG DETAI LS

AE740 I NTERI OR ELEVATI ONS 1

AE741 I NTERI OR ELEVATI ONS 2

AE742 I NTERI OR ELEVATI ONS 3

AE801 FI RST FLOOR FF&E PLAN AND SCHEDULE [ OPTI ON 1]

AE802 SECOND FLOOR FF&E PLAN AND SCHEDULE [ OPTI ON 1]

AE803 THI RD FLOOR FF&E PLAN AND SCHEDULE [ OPTI ON 1]

AE804 FOURTH FLOOR FF&E PLAN AND SCHEDULE [ OPTI ON 1]

AE810 FLOORI NG PATTERN PLANS AND DETAI LS

AE901 FI RST FLOOR PLANS [ OPTI ON 3]

AE961 DOOR AND ROOM FI NI SH SCHEDULE [ OPTI ON 3]

AE971 SECOND FLOOR REFLECTED CEI LI NG PLAN [ OPTI ON 6]

AE972 THI RD FLOOR REFLECTED CEI LI NG PLAN [ OPTI ON 6]

G- 001B COVER SHEET - VOLUME 2

G- 002C LI ST OF DRAWI NGS - VOLUME 1

G- 002D LI ST OF DRAWI NGS - VOLUME 2

G- 003B ABBREVI ATI ONS, LEGEND, AND GENERAL PROJECT NOTES

P- 001 PLUMBI NG GENERAL NOTES, LEGENDS AND ABBREVI ATI ONS

PD101 UNDERSLAB AND FI RST FLOOR FLOOR PLUMBI NG REMOVALS

PLANS

PD102 SECOND AND THI RD FLOOR PLUMBI NG REMOVALS PLANS

P- 101 UNDERSLAB PLUMBI NG PLAN

P- 102 FI RST FLOOR FLOOR PLUMBI NG PLAN

P- 103 SECOND FLOOR PLUMBI NG PLAN

P- 104 THI RD FLOOR PLUMBI NG PLAN

P- 105 FOURTH FLOOR PLUMBI NG PLAN

DOCUMENT 00 01 15 Page 6

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

P- 106 ROOF PLUMBI NG PLAN

P- 401 ENLARGED PLUMBI NG PART PLANS 1

P- 402 ENLARGED PLUMBI NG PART PLANS 2

P- 403 ENLARGED PLUMBI NG PART PLANS 3

P- 501 PLUMBI NG DETAI LS 1

P- 502 PLUMBI NG DETAI LS 2

P- 601 PLUMBI NG SCHEDULES 1

P- 701 PLUMBI NG RI SER DI AGRAMS

M- 001 MECHANI CAL LEGENDS AND ABBREVI ATI ONS

MD101 FI RST, SECOND, AND THI RD FLOOR MECHANI CAL DUCTWORK

REMOVAL PLANS

MD102 FOURTH FLOOR AND ATTI C MECHANI CAL DUCTWORK REMOVAL

PLANS

MD103 FI RST AND SECOND FLOOR MECHANI CAL PI PI NG REMOVALS

PLANS

MD104 THI RD AND FOURTH FLOOR MECHANI CAL PI PI NG REMOVALS

PLANS

MD105 EXTERI OR MECHANI CAL STEAM AND CONDENSATE REMOVALS

PLAN

MH101 FI RST FLOOR MECHANI CAL DUCTWORK PLAN

MH102 SECOND FLOOR MECHANI CAL DUCTWORK PLAN

MH103 THI RD FLOOR MECHANI CAL DUCTWORK PLAN

MH104 FOURTH FLOOR MECHANI CAL DUCTWORK PLAN

MH105 ATTI C MECHANI CAL DUCTWORK PLANS

MP101 FI RST FLOOR MECHANI CAL PI PI NG PLAN

MP102 SECOND FLOOR MECHANI CAL PI PI NG PLANS

MP103 THI RD FLOOR MECHANI CAL PI PI NG PLANS

MP104 FOURTH FLOOR MECHANI CAL PI PI NG PLANS

MP105 EXTERI OR MECHANI CAL STEAM AND CONDENSATE PLANS

M- 501 MECHANI CAL DETAI LS 1

M- 502 MECHANI CAL DETAI LS 2

M- 503 MECHANI CAL DETAI LS 3

M- 504 EXTERI OR MECHANI CAL DETAI LS

DOCUMENT 00 01 15 Page 7

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

M- 601 MECHANI CAL SCHEDULES 1

M- 602 MECHANI CAL SCHEDULES 2

M- 701 CONTROL DI AGRAMS 1

M- 702 CONTROL DI AGRAMS 2

M- 703 CONTROL DI AGRAMS 3

M- 704 CONTROL DI AGRAMS 4

FX001 FI RE SUPPRESSI ON NOTES, LEGENDS, AND ABBREVI ATI ONS

FX101 FI RST FLOOR FI RE SUPPRESSI ON PLAN

FX102 SECOND FLOOR FI RESUPPRESSI ON PLAN

FX103 THI RD FLOOR FI RE SUPPRESSI ON PLAN

FX104 FOURTH FLOOR FI RE SUPPRESSI ON PLAN

FX105 ATTI C FI RE SUPPRESSI ON PLAN

FX401 FI RE SUPPRESSI ON PARTI AL PLANS AND ELEVATI ONS

FX402 FI RE SUPPRESSI ON STANDPI PES STAI R PLANS

FX403 STAI R 001 STANDPI PE SECTI ONS

FX404 STAI R 004 STANDPI PE SECTI ONS

FX501 FI RE SUPPRESSI ON DETAI LS

FX901 FI RST FLOOR FI RE SUPPRESSI ON PLAN [ OPTI ON 3]

FA001 GENERAL FI RE ALARM AND MASS NOTI FI CATI ON NOTES,

LEGENDS, AND ABBREVI ATI ONS

FD101 FI RST AND SECOND FLOOR FI RE ALARM REMOVALS PLANS

FD102 THI RD AND FOURTH FLOOR FI RE ALARM REMOVALS PLANS

FD103 ATTI C FI RE ALARM REMOVALS PLAN

FA101 FI RST FLOOR FI RE ALARM AND MASS NOTI FI CATI ON PLAN

FA102 SECOND FLOOR FI RE ALARM AND MASS NOTI FI CATI ON PLAN

FA103 THI RD FLOOR FI RE ALARM AND MASS NOTI FI CATI ON PLAN

FA104 FOURTH FLOOR FI RE ALARM AND MASS NOTI FI CATI ON PLAN

FA105 ATTI C FI RE ALARM AND MASS NOTI FI CATI ON PLAN

FA501 FI RE ALARM AND MASS NOTI FI CATI ON RI SER AND MATRI X

DOCUMENT 00 01 15 Page 8

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

FA901 FI RST FLOOR FI RE ALARM PLAN [ OPTI ON 3]

E- 001 ELECTRI CAL SYMBOLS, ABBREVI ATI ONS, AND GENERAL NOTES

ED101 FI RST AND SECOND FLOOR ELECTRI CAL REMOVALS PLANS

ED102 THI RD AND FOURTH FLOOR ELECTRI CAL REMOVALS PLANS

ED103 ATTI C AND ROOF ELECTRI CAL REMOVALS PLAN

ED501 ONE- LI NE DI AGRAM - REMOVALS

ES101 ELECTRI CAL SI TE PLAN

ES102 TELECOMMUNI CATI ONS SI TE PLAN

EP101 FI RST FLOOR POWER PLAN

EP102 SECOND FLOOR POWER PLAN

EP103 THI RD FLOOR POWER PLAN

EP104 FOURTH FLOOR POWER PLAN

EP105 ATTI C AND ROOF ELECTRI CAL PLANS

EP501 ONE- LI NE DI AGRAM

EP502 POWER DETAI LS

EP503 EQUI PMENT WI RI NG SCHEDULE

EP601 PANELBOARD SCHEDULES - 1

EP602 PANELBOARD SCHEDULES - 2

EP603 PANELBOARD SCHEDULES - 3

EP604 PANELBOARD SCHEDULES - 4

EL101 FI RST FLOOR LI GHTI NG PLAN

EL102 SECOND FLOOR LI GHTI NG PLAN

EL103 THI RD FLOOR LI GHTI NG PLAN

EL104 FOURTH FLOOR LI GHTI NG PLAN

EL701 LI GHTI NG FI XTURE SCHEDULE AND DETAI LS

EL702 LI GHI TNG FI XTURE DETAI LS

EL703 LI GHTI NG CONTROL DI AGRAMS

ET101 FI RST FLOOR TECHNOLOGY PLAN

DOCUMENT 00 01 15 Page 9

DWG. NO NAVFAC

DWG NO

PWD

ME

DWG

NO.

TI TLE

G- 001A COVER SHEET - VOLUME 1

ET102 SECOND FLOOR TECHNOLOGY PLAN

ET103 THI RD FLOOR TECHNOLOGY PLAN

ET104 FOURTH FLOOR TECHNOLOGY PLAN

ET501 BUI LDI NG 86 TECHNOLOGY PART PLANS AND TECHNOLOGY

DETAI LS 1

ET502 BUI LDI NG 13 TECHNOLOGY PART PLANS AND TECHNOLOGY

DETAI LS 2

ET503 TECHNOLOGY DETAI LS 3

ET504 TECHNOLOGY DETAI LS 4

EY101 FI RST FLOOR SECURI TY PLAN

EY102 SECOND FLOOR SECURI TY PLAN

EY103 THI RD FLOOR SECURI TY PLAN

EY104 FOURTH FLOOR SECURI TY PLAN

EY501 SECURI TY ONE- LI NE DI AGRAM AND DETAI LS

EY502 ACCESS CONTROL SYSTEM, SCHEDULE, NOTES AND DETAI L

1. 3 SUPPLEMENTARY DRAWI NGS

These suppl ement ar y dr awi ngs may not be a par t of t he Cont r act but ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on.

1. 3. 1 Bor i ng Logs

The Gover nment does not guar ant ee t hat bor i ngs i ndi cat e act ual condi t i ons, except f or t he exact l ocat i ons and t he t i me t hat t hey wer e made.

Subsur f ace dat a, not speci f i ed or i ndi cat ed, have been obt ai ned by t he Gover nment at t hi s st at i on. The dat a ar e avai l abl e f or exami nat i on by pr ospect i ve bi dder s i n t he of f i ce of t he Cont r act i ng Of f i cer .

- - End of Document - -

DOCUMENT 00 01 15 Page 10

SECTI ON 01 11 00. 00 22

SUMMARY OF WORK ( PWD ME)

05/ 21

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Cr oss Di sci pl i nar y Coor di nat i on Dr awi ngs; G

Wor k Sequenci ng and Pr epar at i on Pl an; G

Sal vage Pl an; G

SD- 11 Cl oseout Submi t t al s

NRZ Checkl i st ; G

1. 2 PERI OD OF PERFORMANCE

a. Base Bi d: 582 cal endar days af t er Cont r act Awar d wi t h an est i mat ed on si t e dur at i on of 450 Cal endar Days.

b. Opt i on 1: 365 cal endar days af t er Awar d of Opt i on 1 wi t h an est i mat ed on si t e dur at i on of 90 cal endar days.

c. Opt i on 2: 365 cal endar days af t er Awar d of Opt i on 2 wi t h an est i mat ed on si t e dur at i on of 90 cal endar days.

d. Opt i on 3: 365 cal endar days af t er Awar d of Opt i on 3 wi t h an est i mat ed on si t e dur at i on of 180 cal endar days.

e. Opt i on 4: 365 cal endar days af t er Awar d of Opt i on 4 wi t h an est i mat ed on si t e dur at i on of 30 cal endar days.

f . Opt i on 5: 365 cal endar days af t er Awar d of Opt i on 5 wi t h an est i mat ed on si t e dur at i on of 90 cal endar days.

g. Opt i on 6: 365 cal endar days af t er Awar d of Opt i on 6 wi t h an est i mat ed on si t e dur at i on of 30 cal endar days.

1. 2. 1 Cont r act or Mobi l i zat i on af t er Cont r act Awar d

The Cont r act or must mobi l i ze and commence wor k as soon as r easonabl y f easi bl e f r om t he dat e of Cont r act Awar d but not bef or e t he r equi r ed cust omer r el ocat i on per i od, per t he Const r uct i on Sequence St r at egy dr awi ngs, or not l at er t han 10 weeks af t er Awar d.

SECTI ON 01 11 00. 00 22 Page 1

1. 3 WORK COVERED BY CONTRACT DOCUMENTS

1. 3. 1 Pr oj ect Descr i pt i on

The pr oj ect i ncl udes i ncl udes upgr adi ng l i f e saf et y, egr ess, and accessi bi l i t y component s i n t he bui l di ng t o meet cur r ent code r equi r ement s. The pr oj ect i ncl udes i nst al l i ng an el evat or , i nst al l i ng code compl i ant st ai r ways, and addi ng bui l di ng wi de spr i nkl er and f i r e al ar m syst ems. The pr oj ect scope i ncl udes hazar dous mat er i al s abat ement , power di st r i but i on and syst em upgr ades, bui l di ng envel ope r epai r s, i nt er i or space r enovat i ons, and ut i l i t y upgr ades. Phasi ng and coor di nat i on wi t h Shi pyar d oper at i ons i s par amount and mi ssi on cr i t i cal el ement s need t o r emai n f ul l y oper at i onal t hr oughout t he dur at i on of t he pr oj ect .

Pr oj ect Opt i ons I ncl ude:

Opt i on 1: Fur ni t ur e, f i x t ur es, and equi pment ( FF&E)

Opt i on 2: El ect r oni c secur i t y syst ems ( ESS)

Opt i on 3: St r uct ur al I mpr ovement Repai r s

Opt i on 4: St or m dr ai nage i mpr ovement s

Opt i on 5: Hi st or i c wi ndow r est or at i on

Opt i on 6: Cei l i ng c l ouds

1. 4 PROJECT SEQUENCI NG REQUI REMENTS

Pr ovi de Wor k Sequenci ng and Pr epar at i on Pl an i ndi cat i ng how t he wor k i s t o be accompl i shed and i ncor por at i ng Gover nment di r ect i ves. The i nt ent of t hi s Pl an i s t o show t he Gover nment t hat a compl et e under st andi ng of t he pr oj ect r equi r ement s ar e under st ood i ncl udi ng subcont r act or s. The Pl an must be car ef ul l y pr epar ed and must i ncl ude ever y aspect of t he pr oj ect i ncl udi ng an out age pl an coor di nat ed wi t h t he const r uct i on schedul e t hat wi l l be r equi r ed t o suppor t t he const r uct i on and how i t i s t o be accompl i shed wi t h an absol ut e mi ni mum of di sr upt i on t o Gover nment oper at i ons. No wor k may begi n on t he pr oj ect unt i l t hi s pl an i s r evi ewed and appr oved by t he Cont r act i ng Of f i cer . The f ol l owi ng i s t he pr oposed sequenci ng f or i mpl ement at i on of t he pr oj ect ' s const r uct i on:

a. Const r uct i on sequenci ng pl ans have been devel oped i n coor di nat i on wi t h t he Gover nment . Devel op an i ndependent const r uct i on wor k sequenci ng and pr epar at i on pl an, and out age pl an, coor di nat ed wi t h t he pr epar ed const r uct i on schedul e and out age i n coor di nat i on wi t h t he Cont r act i ng Of f i cer .

b. Dur i ng t he wor k of t hi s pr oj ect , access cont r ol el ement s ar e connect ed t o Bui l di ng 14 and must r emai n f ul l y oper at i onal i ncl udi ng, but not l i mi t ed t o, t he f ol l owi ng ut i l i t i es: el ect r i cal power , communi cat i ons syst ems, and secur i t y syst ems associ at ed wi t h t he guar d shack and t wo set s of t ur nst i l es. Any r equi r ed shut down r equi r es an out age f or each syst em appr oved by t he Cont r act i ng Of f i cer .

c. Bui l di ng 14 i s an hi st or i c f aci l i t y and r equi r es speci al coor di nat i on t o have l i mi t ed i mpact on t he hi st or i c f abr i c and char act er def i ni ng f eat ur es of t he st r uct ur e. Wor k must compl y wi t h t he SECRETARY OF THE

SECTI ON 01 11 00. 00 22 Page 2

I NTERI OR' S STANDARDS FOR THE TREATMENT OF HI STORI C PROPERTI ES. Cr oss di sci pl i nar y coor di nat i on dr awi ngs ar e r equi r ed f or r evi ew and appr oval by t he Cont r act i ng Of f i cer and t he PWD- ME Cul t ur al Resour ces Manager pr i or t o commencement of wor k. Ref er t o Sect i on 01 30 10. 00 22

COORDI NATI ON PROCEDURES AND COORDI NATI ON DRAWI NGS.

1. 4. 1 Locat i on

The wor k i s l ocat ed at t he Por t smout h Naval Shi pyar d, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

Not e t he " Pr oj ect Si t e" i s t he speci f i c ar ea of const r uct i on wi t hi n t he l i mi t s of wor k as def i ned by t he cont r act document s.

1. 5 PROJECT ENVI RONMENTAL GOALS

Di st r i but e copi es of t he Envi r onment al Goal s t o each subcont r act or and t he Cont r act i ng Of f i cer . The over al l goal f or desi gn, const r uct i on, and oper at i on i s t o pr oduce a pr oj ect t hat meet s t he f unct i onal pr ogr am needs and i ncor por at es sust ai nabi l i t y pr i nci pl es. Speci f i cal l y:

a. Avoi d s i t e degr adat i on and er osi on. Mi ni mi ze of f s i t e envi r onment al i mpact .

b. Use t he mi ni mum amount of ener gy, wat er , and mat er i al s f easi bl e t o meet t he desi gn i nt ent . Sel ect ener gy and wat er ef f i c i ent equi pment and st r at egi es.

c. Use envi r onment al l y pr ef er abl e pr oduct s and decr ease t oxi c i t y l evel of mat er i al s used.

d. Opt i mi ze oper at i onal per f or mance ( t hr ough commi ssi oni ng ef f or t s) i n or der t o ensur e ener gy ef f i c i ent equi pment oper at es as i nt ended.

Consi der t he dur abi l i t y , mai nt ai nabi l i t y , and f l exi bi l i t y of bui l di ng syst ems.

e. Manage const r uct i on s i t e and st or age of mat er i al s t o ensur e no negat i ve i mpact on t he i ndoor envi r onment al qual i t y of t he bui l di ng.

f . Reduce const r uct i on wast e t hr ough r euse, r ecycl i ng, and suppl i er t ake- back.

1. 6 OCCUPANCY OF PREMI SES

Bui l di ng wi l l be vacat ed dur i ng per f or mance of wor k under t hi s Cont r act .

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways. Whi l e t he bui l di ng i s occupi ed, l i f e saf et y measur es and access t o egr ess component s must be mai nt ai ned. Pr ovi de t empor ar y egr ess l i ght i ng, emer gency l i ght i ng, f i r e al ar m, and f i r e pr ot ect i on syst ems al ong pat hs of egr ess.

Par ki ng i s a cr i t i cal component of wor k on t he Por t smout h Naval Shi pyar d and par ki ng and r oad out ages must be submi t t ed t o t he Cont r act i ng Of f i cer f or appr oval as out l i ned i n t he Cont r act Document s.

1. 7 EXI STI NG WORK

I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, SECTI ON 01 11 00. 00 22 Page 3

St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 8 LOCATI ON OF UNDERGROUND UTI LI TI ES

Ver i f y l ocat i on of under gr ound ut i l i t i es i n accor dance wi t h Sect i on

01 35 26. 00 22 GOVERNMENTAL SAFETY REQUI REMENTS ( PWD ME) .

1. 8. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east t wo ( 2) wor ki ng days pr i or t o st ar t i ng excavat i on wor k. Ref er t o Sect i on 01 35 26. 00 22 GOVERNMENTAL SAFETY REQUI REMENTS ( PWD ME) At t achment B f or Di g Saf e r equi r ement s.

1. 9 SECURE NETWORK PROVI DERS ( NETWORK N, NETWORK C, NETWORK P, AND

NETWORK S)

1. 9. 1 Secur e Net wor k Pr ovi der s Cont r act or Access

The Secur e Net wor k Pr ovi der s Cont r act or ( s) must be al l owed access t o t he f aci l i t y t hr oughout t he pr oj ect const r uct i on phases t o mai nt ai n exi st i ng equi pment t hat i s t o r emai n, as wel l as t owar ds t he end of const r uct i on ( f i ni shes 90% compl et e, r ough- i n 100% compl et e, I nsi de Pl ant ( I SP) / Out si de Pl ant ( OSP) i nf r ast r uct ur e i n pl ace) t o pr ovi de equi pment i n t he t el ecommuni cat i ons r oom and spaces and t o make f i nal connect i ons.

Coor di nat e and f aci l i t at e j oi nt use of bui l di ng spaces wi t h t he Secur e Net wor k Pr ovi der s Cont r act or ( s) dur i ng t he f i nal st ages of each phase of const r uct i on. Af t er t he Cont r act i ng Of f i cer has f aci l i t at ed coor di nat i on meet i ngs bet ween t he Cont r act or s, wi t hi n one week, i ncor por at e t he ef f or t of addi t i onal coor di nat i on i nt o t he const r uct i on schedul e t o demonst r at e mai nt ai ni ng t he Cont r act dur at i on.

1. 10 SALVAGE MATERI AL AND EQUI PMENT

I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver , and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed on t he Por t smout h Naval Shi pyar d.

Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Use a syst em of pr oper t y cont r ol t hat i s appr oved by t he Cont r act i ng Of f i cer . St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .

1. 11 BENEFI CI AL OCCUPANCY REQUI REMENTS

Al l wor k el ement s i dent i f i ed as " Requi r ed f or Faci l i t y Del i ver y ( BOD) " i ncl uded i n Sect i on 01 30 00. 00 22 Appendi x A NRZ Checkl i st must be compl et ed and accept ed by t he Cont r act or ' s QC Manager pr i or t o submi t t i ng t he f or m t o t he NAVFAC PWD ME Const r uct i on Manager f or NAVFAC PWD ME

SECTI ON 01 11 00. 00 22 Page 4 si gnat ur es.

The Cont r act or must submi t t he compl et ed NRZ Checkl i st wi t h t he r equi r ed document at i on no l at er t han t en ( 10) wor ki ng days pr i or t o r equest i ng t he Gover nment t ake Benef i c i al Occupancy.

Fai l ur e of t he Cont r act or t o ver i f y al l wor k and pr ovi de t he r equi r ed document at i on wi l l del ay t he pr ocessi ng of accept ance of Benef i c i al Occupancy.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00. 00 22 Page 5

SECTI ON 01 14 00. 00 22

WORK RESTRI CTI ONS ( PWD ME)

10/ 23

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 241 ( 2022) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2024) Saf et y and Heal t h Requi r ement s Manual

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Cont act Per sonnel ; G

Out age Pl an; G

1. 3 SPECI AL SCHEDULI NG REQUI REMENTS ( PNSY)

a. Wor k r equi r i ng i nt er r upt i on ( out age) of any Por t smout h Naval Shi pyar d r oads, cr ane r ai l , r ai l r oads, and/ or ut i l i t y ser vi ces must be coor di nat ed/ al i gned wi t h st akehol der s pr i or t o submi ssi on of t he Out age package f or f i nal 15 cal endar day appr oval . See Par agr aph her ei n ent i t l ed FACI LI TY/ UTI LI TY/ SERVI CE OUTAGE & I NTERRUPTI ONS PROCESS f or Out age t i mi ng and i nst r uct i ons.

b. Per mi ssi on t o i nt er r upt any Por t smout h Naval Shi pyar d r oads, cr ane r ai l , r ai l r oads, and/ or ut i l i t i es or ser vi ces must be submi t t ed t o t he Cont r act i ng Of f i cer i n wr i t i ng a mi ni mum of 30 cal endar days ( 20 wor ki ng days) pr i or t o t he desi r ed dat e of i nt er r upt i on. See Par agr aph her ei n ent i t l ed FACI LI TY/ UTI LI TY/ SERVI CE OUTAGE & I NTERRUPTI ONS

PROCESS.

c. When t he pr oj ect i s l ocat ed i n and adj acent t o r est r i ct ed ar ea. The Cont r act or i s not al l owed i n t hese ar eas wi t hout cont i nuous Gover nment escor t s. See t he Scope of Wor k t o det er mi ne i f t he pr oj ect l i mi t s i ncl ude any secur i t y I s l and i n or adj acent t o t he wor k ar ea.

SECTI ON 01 14 00. 00 22 Page 1

d. Coor di nat e t he wor k wi t h t he sequenci ng/ phasi ng r equi r ement s out l i ned i n t he Scope of Wor k Memo and as out l i ne i n t he Const r uct i on Dr awi ngs.

1. 4 ACCESS AND USE OF PREMI SES ( PNSY)

1. 4. 1 Por t smout h Naval Shi pyar d Regul at i ons

Not i f y t he Cont r act i ng Of f i cer 30 cal endar days i n advance f or any wi de l oads. Cont act t he Cont r act i ng Of f i cer t o det er mi ne i f t her e ar e ot her access l i mi t at i ons at t he Por t smout h Naval Shi pyar d.

Ensur e t hat per sonnel empl oyed on t he Por t smout h Naval Shi pyar d become f ami l i ar wi t h and obey Por t smout h Naval Shi pyar d r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c , and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) . Do not ent er r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y.

Al l equi pment must be conspi cuousl y mar ked wi t h company si gnage f or i dent i f i cat i on.

1. 4. 1. 1 Subcont r act or s and Per sonnel Cont act s

Pr ovi de a l i s t of cont act per sonnel t o i ncl ude Subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

1. 4. 1. 2 I dent i f i cat i on Badges and I nst al l at i on Access

a. Appl i cat i on f or and use of badges wi l l be as di r ect ed. Obt ai n access t o t he Por t smout h Naval Shi pyar d by submi t t i ng t he SECNAV For m 5512- NSNPT Jul 2019 ( At t achment C) a mi ni mum of 15 wor ki ng days i n advance f or vet t i ng and appr oval , or by obt ai ni ng passes each day f r om t he Por t smout h Naval Shi pyar d' s Pass and I dent i f i cat i on/ Secur i t y Of f i ce. One- day passes, i ssued t hr ough t he Por t smout h Naval Shi pyar d' s Pass and I dent i f i cat i on Of f i ce, wi l l be f ur ni shed wi t hout char ge. Repor t any i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer i mmedi at el y.

Pr i me cont r act or i s r esponsi bl e f or r ecover i ng any badges t hat ar e no l onger r equi r ed, i ncl udi ng f r om wor ker s who ar e no l onger empl oyed by pr i me or subs, and i mmedi at el y t ur ni ng badges i nt o t he Pass/ I D Of f i ce.

Fai l ur e t o mai nt ai n account abi l i t y of i ssued badges coul d cause del ays i n f ut ur e badge r equest s. Cont r act s ar e war ned t hat badges ar e checked f or cur r ency and any badge not used wi t hi n 30 days wi l l be di sabl ed.

b. Al l Cont r act or s who possess a Commer ci al Access Cont r ol ( CAC) Syst em Car d ar e al so r equi r ed t o submi t an access r equest ( 5512) t o suppor t a val i d pur pose t o be on t he Por t smout h Naval Shi pyar d. A second f or m of val i d I D may al so be r equi r ed, i f r equest ed, upon ar r i val at t he Por t smout h Naval Shi pyar d' s Ent r ance Gat e. Al l per sonnel wi t hout CAC car ds wi l l need t wo ( 2) f or ms of appr oved i dent i f i cat i on f or access t o t he Por t smout h Naval Shi pyar d.

c. One- Day Passes: Par t i c i pat i on i n t he vet t i ng pr ocess i s mandat or y, unl ess a val i d emer gency exi st s. Then i t i s possi bl e t o ut i l i ze an escor t f r om t he depar t ment ef f ect ed. I f t he Cont r act or chooses t o not par t i c i pat e i n t he vet t i ng pr ocess, t hey wi l l not be al l owed on t he

SECTI ON 01 14 00. 00 22 Page 2

Por t smout h Naval Shi pyar d. The Gover nment wi l l not be r esponsi bl e f or any cost or l ost t i me associ at ed wi t h obt ai ni ng dai l y passes or added vehi c l e i nspect i ons.

d. PNS has an onl i ne appoi nt ment syst em. Appoi nt ment s may be made usi ng ht t ps: / / k i osk. na4. ql ess. com/ ki osk/ app/ home/ 191.

1. 5 PORTSMOUTH NAVAL SHI PYARD ( PNS) REGULATI ONS

1. 5. 1 Radi ol ogi cal

1. 5. 1. 1 Radi ol ogi cal I ndoct r i nat i on ( PNSY)

Al l per sonnel wor ki ng at t he Por t smout h Naval Shi pyar d ar e r equi r ed t o v i ew a 15 mi nut e v i deo br i ef i ng on r adi ol ogi cal post i ngs and cont r ol s i n use at t he Por t smout h Naval Shi pyar d. The br i ef i ng wi l l be gi ven at t he Pass Of f i ce pr i or t o i ssue of secur i t y badges and vehi c l e passes.

Any empl oyee who di sr egar ds, al t er s, moves, or ot her wi se t amper s wi t h a r adi ol ogi cal post i ng, or who di sobeys a r adi ol ogi cal i nst r uct i on, may be r emoved f r om t he Por t smout h Naval Shi pyar d and deni ed f ut ur e access.

1. 5. 1. 2 Yel l ow Mat er i al s ( PNSY)

Do not use yel l ow or or ange- yel l ow col or ed mat er i al s at t he Por t smout h Naval Shi pyar d f or t he f ol l owi ng pur poses: Pr ot ect i ve c l ot hi ng, hoods, sheet i ng, t ar paul i ns, pol yet hyl ene bot t l es or ot her cont ai ner s, t apes, bags, bandi ng, i dent i f i cat i on mar ks on t ool s, boundar y mar ker s, r i bbons, vent duct s, t empor ar y er osi on cont r ol devi ces, sur vey r i bbon, et c.

Cont act t he Cont r act i ng Of f i cer f or a l i s t of yel l ow i t ems t hat have been appr oved f or use on t he Por t smout h Naval Shi pyar d. Di spose of gener at ed yel l ow col or ed wast e of f of t he Por t smout h Naval Shi pyar d. Por t smout h Naval Shi pyar d r ef use cont ai ner s must not be used f or di sposal of yel l ow col or ed wast e mat er i al s. Yel l ow col or ed i t ems such as descr i bed above ar e of speci al s i gni f i cance wi t hi n t he Por t smout h Naval Shi pyar d and ar e subj ect t o st r i ct cont r ol s. Yel l ow col or ed Cont r act gener at ed debr i s must be bagged i n non- t r ansl ucent cont ai ner s, and pr ompt l y r emoved f r om t he Por t smout h Naval Shi pyar d.

1. 5. 1. 3 Smoke Det ect or s ( PNSY)

I oni zat i on t ype smoke det ect or s and duct smoke det ect or s cont ai n r adi oact i ve mat er i al and ar e pr ohi bi t ed f r om use on t he Por t smout h Naval Shi pyar d. Phot oel ect r i c smoke det ect or s ar e t he onl y t ype aut hor i zed f or use on t he Por t smout h Naval Shi pyar d.

1. 5. 1. 4 Radi oact i ve Sour ces ( PNSY)

Al l Cont r act s i nvol v i ng r adi at i on gener at i ng devi ces must conf or m t o t he r equi r ement s l i s t ed i n Sect i on 01 35 26. 00 22 GOVERNMENTAL SAFETY REQUI REMENTS ( PWD ME) and U. S. Ar my Cor ps of Engi neer s Saf et y Manual EM 385- 1- 1. Al l r equi r ement s ar e t o be submi t t ed t o t he Cont r act i ng Of f i cer at l east 14 days pr i or t o commencement of oper at i ons i nvol v i ng r adi at i on gener at i ng devi ces. A r equi r ement s checkl i st wi l l be pr ovi ded by NAVFAC ( COTs) Cont r act or Over si ght Techni c i an.

1. 5. 2 Laser Cont r ol

Compl y wi t h l aser saf et y r equi r ement s under 21 CFR 1040 and ANSI

SECTI ON 01 14 00. 00 22 Page 3

2136. 1- 1986 f or any wor k under t hi s Cont r act ut i l i z i ng l aser s.

1. 5. 3 Ener gy Conser vat i on

I n cooper at i on wi t h Gover nment r epr esent at i ves, par t i c i pat e i n an act i ve pr ogr am di r ect ed t owar d t he ef f i c i ent use of ener gy.

1. 5. 4 Fi r e Pr event i on ( PNSY)

Requi r e empl oyees t o become f ami l i ar wi t h f i r e pr event i on r egul at i ons wi t hi n t he Por t smout h Naval Shi pyar d t o i ncl ude t he pr oper met hod of t ur ni ng i n a f i r e al ar m, st or age of f l ammabl e and combust i bl e mat er i al s, and cont r ol of combust i bl e wast e and t r ash. Any HOT WORK ( wel di ng, bur ni ng, gr i ndi ng, cut t i ng, et c. ) r equi r es a HOT WORK PERMI T pr i or t o commenci ng such wor k. Thi s per mi t i s obt ai ned f r om t he Por t smout h Naval Shi pyar d' s Fi r e Depar t ment v i a t he Cont r act i ng Of f i cer and must be submi t t ed at l east t hr ee( 3) wor ki ng days pr i or t o commenci ng any Hot Wor k.

1. 5. 5 I dent i f i cat i on and Cont r ol of Seamed ( Wel ded) Pi pe and Tubi ng ( PNSY)

Submar i ne Saf et y r egul at i ons pr ohi bi t t he use of seamed ( wel ded) pi pe or t ubi ng wi t hi n t he Por t smout h Naval Shi pyar d, unl ess such pi pe or t ubi ng i s i dent i f i ed and cont r ol l ed so as t o pr event i t s i nadver t ent subst i t ut i on f or seaml ess pi pe or t ubi ng. The f ol l owi ng r equi r ement s appl y and wi l l be st r i ct l y enf or ced:

Any seamed ( wel ded) copper - ni ckel , car bon st eel , car bon- mol y st eel , st ai nl ess st eel , ni ckel - chr omi um- i r on al l oy, or ni ckel - copper pi pe or t ubi ng i nt ended f or use on t he Por t smout h Naval Shi pyar d must be i dent i f i ed i n t he f ol l owi ng manner PRI OR TO DELI VERY TO THE PORTSMOUTH

NAVAL SHI PYARD:

Use a l ead- f r ee whi t e pai nt , t o mar k a 24- i nch l ong st r i pe and t he wor d " wel ded" al t er nat el y al ong t he ent i r e l engt h of t he pi pe or t ubi ng. Appl y a one- hal f i nch wi de st r i pe unl ess t he s i ze of t he pi pe or t ubi ng r equi r es use of a nar r ower st r i pe.

Mai nt ai n posi t i ve cont r ol over seamed pi pe or t ubi ng unt i l wor ked i nt o pl ace or r emoved f r om t he Por t smout h Naval Shi pyar d.

Seaml ess pi pe or t ubi ng may be subst i t ut ed f or any seamed ( wel ded) pi pe or t ubi ng speci f i ed i n t he t echni cal speci f i cat i ons.

The above r equi r ement s do not appl y t o squar e or r ect angul ar t ubi ng, copper or br ass pi pe or t ubi ng, or t o pi pi ng or t ubi ng whi ch has been i ncor por at ed i nt o equi pment or f i x t ur es pr i or t o del i ver y t o t he Por t smout h Naval Shi pyar d.

1. 5. 6 Pest i c i de and Her bi c i de Cont r ol

Do not appl y pest i c i des nor her bi c i des unl ess speci f i cal l y r equi r ed by t hi s Cont r act . Wher e appl i cat i on of pest i c i des or her bi c i des i s r equi r ed, pr ovi de t he submi t t al s r equi r ed by t he speci f i cat i on and obt ai n wr i t t en appr oval pr i or t o any appl i cat i on. The Cont r act i ng Of f i cer wi l l be r equi r ed t o r evi ew and appr ove pest i c i des or her bi c i des submi t t al s.

1. 5. 7 Smoki ng Pol i cy

I n accor dance wi t h NAVFAC pol i cy, smoki ng i s pr ohi bi t ed i nsi de al l

SECTI ON 01 14 00. 00 22 Page 4 bui l di ngs and ot her f aci l i t i es except t hose ar eas speci f i cal l y i dent i f i ed as smoki ng ar eas ( e. g. , smoki ng shel t er s) . Smoki ng i s not per mi t t ed wi t hi n 20 f eet of ai r i nt akes, door ways, or wi ndows.

1. 5. 8 Por t al Cr ane Cl ear ance Zone ( PNSY)

Ensur e t her e i s no const r uct i on debr i s or mat er i al s wi t hi n t he Cr ane Cl ear ance Zone ( i . e. , bet ween t he pai nt ed yel l ow l i nes on each si de of t he r ai l ) unl ess a r ai l out age/ secur ement has been appr oved.

1. 6 WORKI NG HOURS ( PNSY)

Regul ar wor ki ng hour s must consi st of a per i od est abl i shed by t he Cont r act i ng Of f i cer bet ween 7 AM and 3: 30 PM, Monday t hr ough Fr i day, excl udi ng Gover nment hol i days. The r egul ar wor ki ng hour s must be conf i r med wi t h t he Cont r act i ng Of f i cer .

1. 6. 1 Wor k Out si de Regul ar Hour s ( PNSY)

Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Pr ovi de wr i t t en r equest s f i f t een ( 15) Cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess and t o al l ow schedul i ng of f ul l t i me escor t s i n t he bui l di ng( s) i f r equi r ed. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer .

As par t of t he r equest s, pr ovi de t he speci f i c dat es, hour s, l ocat i on( s) , t ype( s) of wor k t o be per f or med, Cont r act number , and pr oj ect t i t l e.

Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s.

Wor ki ng on Weekends/ Hol i days: Any r equest t o wor k on a weekend must be submi t t ed t o t he Cont r act i ng Of f i cer no l at er t han t wo ( 2) wor ki ng days pr i or t o t he r equest ed wor k weekend/ Hol i day.

1. 7 WORK I N OCCUPI ED AND EXI STI NG BUI LDI NG( S)

Wor k under t hi s Cont r act may be l ocat ed i n an occupi ed bui l di ng. Move unf i xed f ur ni t ur e away f r om wor ki ng ar ea( s) as r equi r ed t o per f or m t he wor k; pr ot ect ; and r epl ace i n or i gi nal l ocat i ons upon compl et i on of t he wor k. Leave f i xed equi pment i n pl ace and pr ot ect agai nst damage or t empor ar i l y di sconnect , r el ocat e, pr ot ect , and r ei nst al l at compl et i on of wor k. I f det er mi ned necessar y by t he Cont r act i ng Of f i cer , t he Gover nment wi l l r emove and r el ocat e ot her Gover nment pr oper t y i n t he ar eas of t he bui l di ngs schedul ed t o r ecei ve wor k. Af t er pr ovi di ng wr i t t en not i f i cat i on, al l ow 15 cal endar days f or t he Gover nment t o r el ocat e Gover nment pr oper t y.

1. 8 FACI LI TY/ UTI LI TY/ SERVI CE OUTAGE & I NTERRUPTI ONS PROCESS

1. 8. 1 Faci l i t y / Ut i l i t y / Ser vi ce I nt er r upt i ons

Make ut i l i t y / ser vi ce cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days as appr oved by t he Cont r act i ng Of f i cer . Conf or m t o pr ocedur es r equi r ed i n t he par agr aph her ei n ent i t l ed WORK OUTSI DE REGULAR HOURS ( PNSY) her ei n. Ant i c i pat ed cost s must be i ncl uded i n t he bi d.

Ensur e t hat new ut i l i t i es/ ser vi ces ar e compl et e, except f or t he

SECTI ON 01 14 00. 00 22 Page 5 connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ces.

I nt er r upt i on t o Wat er , Sani t ar y Sewer , St or m Sewer , Tel ecommuni cat i on Ser vi ces( Tel ephone, i nt er net , r adi o) , El ect r i c Ser vi ce, Ai r Condi t i oni ng, Heat i ng, Fi r e Al ar m, Compr essed Ai r , and ot her ser vi ces must be consi der ed ser vi ce i nt er r upt i ons pur suant t o t he par agr aph her ei n ent i t l ed WORK OUTSI DE REGULAR HOURS ( PNSY) her ei n. Thi s t i me l i mi t i ncl udes t i me f or deact i vat i on and r eact i vat i on. Al so, see par agr aph her ei n ent i t l ed TEMPORARY OUTAGE PROCESS f or Out age Requi r ement s.

Oper at i on of Por t smout h Naval Shi pyar d Ut i l i t y / Ser vi ce: Do not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he Por t smout h Naval Shi pyar d' s ut i l i t i es/ ser vi ce syst ems, i ncl udi ng wat er , sewer , el ect r i cal , ai r and st eam ser vi ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k.

1. 8. 2 Tempor ar y Out age Pr ocess

a. Out age Requi r ement s

The Out age pr ocess i ncl udes devel opment of a pl an and out age package, vet t i ng and al i gni ng t he Out age Pl an and associ at ed i mpact s wi t h st akehol der s, and f i nal out age submi t t al and Gover nment appr oval .

Tempor ar y out ages ar e r equi r ed when nor mal syst em oper at i on i s or coul d be i mpact ed f or ut i l i t y , f aci l i t y , f i r e l ane, r oad, and gr ound l evel t r ack. Thi s s i t uat i on can occur when i nspect i ng, r epai r i ng, or upgr adi ng, ut i l i t y syst ems and equi pment , bui l di ngs and st r uct ur es ( f aci l i t i es) , and ar eas…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .