Results - Demolish Bulk Fuel Facility Cutler
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- N4008524B2507
- Agency
- Naval Facilities Engineering Command Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237120 Oil and Gas Pipeline and Related Structures Construction
- Place of performance
- Cutler, Maine 04626, United States
- Points of contact
-
- Matt Thomsen matthew.j.thomsen2.civ@us.navy.mil (207) 438-4620
- Jonathan Erickson jonathan.p.erickson3.civ@us.navy.mil (207) 438-4608
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy, Naval Facilities Engineering Command is seeking proposals for the demolition of three existing bulk fuel tanks and four transient fuel tanks, and the installation of four new 50,000-gallon bulk tanks and four new 20,000-gallon transient tanks at the Naval Support Activity Cutler in Cutler, Maine. The work also includes 11 bid options for additional related tasks such as demolition of ancillary equipment, concrete repairs, painting, roadway improvements, and fuel oil delivery and storage. The contract will be awarded as a firm-fixed-price contract, with bids due by July 19, 2024. The government estimate for this project is over $14 million.
This solicitation is set aside for small businesses under NAICS code 237120 - Oil and Gas Pipeline and Related Structures Construction. The period of performance is 500 calendar days for the base period, with optional extension periods of 0 to 365 additional days. The place of performance is the Naval Support Activity Cutler facility in Cutler, Maine.
Notice text
The work includes all labor, material, equipment, transportation, supervision, and incidental related work to demolish three existing bulk tanks and associated piping in the bulk tank area at NSA Cutler in Cutler, Maine. It also includes the demo of the four transient fuel tanks and their corresponding dog houses covering the utility pits. A total of four new 50,000 gal tanks will be installed in the existing bulk tank area and four 20,000 gal tanks will be installed in the transient fuel area. There are 11 bid options. Bid option 1: Includes the demo of the bulk tank berm oil water separator. Bid option 2: Includes providing a 6 inch concrete slab on abandoned bulk tank foundation. Bid option 3: Includes the demo of cantilevered concrete pan at transient tank dog house. Bid option 4: Includes providing a reinforced membrane waterproofing system to building. Bid option 5: Includes providing concrete repairs inside transient utility tunnel - Crack Injection. Bid option 6: Includes providing concrete repairs inside transient utility tunnel - Type B Spall. Bid option 7: Includes painting the bulk fuel tank support pipes. Bid option 8: Includes mill and overlay of roadways around project area. Bid option 9: Includes Fuel oil delivery and tank filling upon completion of Phase 2. Bid option 10: Includes on site temporary fuel storage for fuel oil removed as part of Phase 2. Bid option 11: provides for the installation of bollards for transient tank parking lot.
Attachments
Show all 31
Notice history
| Notice | Type | Posted |
|---|---|---|
| Results - Demolish Bulk Fuel Facility Cutler | Award Notice | |
| Demolish Bulk Fuel Facility Cutler - Amendment 01 | Solicitation | |
| Results - Demolish Bulk Fuel Facility Cutler | Solicitation | |
| Demolish Bulk Fuel Facility Cutler | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity