This document is an amendment to a solicitation for the demolition of three existing bulk fuel tanks and four transient fuel tanks, as well as the installation of four new 50,000-gallon tanks in the bulk tank area and four new 20,000-gallon tanks in the transient fuel area at NSA Cutler in Cutler, Maine.
The solicitation includes 11 bid options, such as demolishing the bulk tank berm oil water separator, providing a concrete slab on the abandoned bulk tank foundation, demolishing the cantilevered concrete pan at the transient tank dog house, providing a reinforced membrane waterproofing system, performing concrete repairs in the transient utility tunnel, painting the bulk fuel tank support pipes, milling and overlaying roadways around the project area, fuel oil delivery and tank filling upon completion of Phase 2, providing on-site temporary fuel storage, and installing bollards for the transient tank parking lot. The work includes all labor, material, equipment, transportation, supervision, and incidental related work. The solicitation is being issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .