1419 - Abstract of Offers - Cutler Demo Fuel Facility.pdf

PDF 275 KB Posted

Attached to
Results - Demolish Bulk Fuel Facility Cutler
Solicitation number
N4008524B2507
Issued by

About this file

This document is an Abstract of Offers for a federal construction contract solicitation (Solicitation Number N4008524B2507) to demolish a bulk fuel facility at Naval Support Activity Cutler in Cutler, Maine. The contract includes a base bid for demolishing the bulk fuel facility, as well as 11 bid options for related work such as demolishing the oil water separator, concrete slab work, waterproofing, and fuel oil delivery.

The Government Estimate for this work is $14,372,311.11. Two offerors submitted bids - Goshawk, LLC with a bid of $11,898,741.50 and SpecPro Environmental Services LLC with a bid of $12,823,435.00. The contract is set aside for small businesses and requires 20% bid security. The solicitation was issued on 6/12/2024 and opened on 7/19/2024. The issuing office is NAVFAC Mid Atlantic in Portsmouth, New Hampshire.

View the file

Other files

File Type Posted
AMD 02 CU-103-AST-04.pdf PDF
AMD 02 CU-125-AST-01.pdf PDF
AMD 02 31 23 00.00 22.pdf PDF
AMD 02 CU-103-AST-01.pdf PDF
AMD 02 02 82 00.00 22.pdf PDF
AMD 02 CU-127-AST-01.pdf PDF
AMD 02 Procedures for Excavating in Areas of Grounding Grid-11Jan2023.pdf PDF
AMD 02 CU-103-AST-03.pdf PDF
AMD 02 CU-126-AST-01.pdf PDF
AMD 02 Gov Responses to Remaining PPIs - Demo Fuel Cutler - 24B2507.pdf PDF
AMD 02 Existing Transient Tank Foundation Drawing.pdf PDF
AMD 02 02 83 00.00 22.pdf PDF
AMD 02 CU-103-AST-02.pdf PDF
Amendment 02 N4008524B2507 Demo Bulk Fuel Facility.pdf PDF
AMD 01 Cutler Fuel Tank Repl - Geotech Data Report.pdf PDF
AMD 01 Gov Responses to PPIs - Demo Fuel Cutler - 24B2507.pdf PDF
AMD 01 Sign in Sheet - Bulk Fuel Cutler.pdf PDF
AMD 01 NAVFAC Cutler AST Replacement Env Investigation Ltr_11.8.2023.pdf PDF
Amendment 01 N4008524B2507 Demo Bulk Fuel Facility.pdf PDF
AMD 01 Cutler Fuel Tank - Natural Resource Report.pdf PDF
AMD 01 Cutler Fuel Tank - Wetlands.pdf PDF
AMD 01 Weston Sampson_NCTCS Cutler Fuel Tanks_RBM Survey Report.pdf PDF
AMD 01 Existing Bulk Fuel Tank Foundation Drawings.pdf PDF
Drawings - Demolish Bulk Fuel Facility Cutler.pdf PDF
Released N4008524B2507 Demolish Bulk Fuel Facilities Cutler.pdf PDF
Specifications - Demolish Bulk Fuel Facility Cutler.pdf PDF
Time Sensitive - Access Instructions - Cutler Site Walk.pdf PDF
Time Sensitive - Access List - Cutler Site Walk.xlsx XLSX spreadsheet
Bid Form - Bulk Fuel Cutler.pdf PDF
SECNAV 5512.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 PAGES

X

7A.

ITEM

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE D. UNIT PRICE

CLIN

0001 BASE BID - Demolish Bulk Fuel Facility 1 EA $9,906,022.16

CLIN

0002 Option 1: Demo Oil Water Separator 1 EA $136,380.77

CLIN

0003 Option 2: Concrete Slab 1 EA $128,718.78

CLIN

0004 Option 3: Demo Concrete Pan 1 EA $108,129.54

CLIN

0005 Option 4: Waterproofing System 1 EA $102,731.39

CLIN

0006 Option 5: Crack Injection Repairs 1 EA $148,442.66

CLIN

0007 Option 6: Type B Spall Repairs 1 EA $154,893.22

CLIN

0008 Option 7: Paint Bulk Tank Pipe Supports 1 EA $92,290.66

CLIN

0009 Option 8: Mill and Overlay 1 EA $147,202.59

CLIN

0010 Option 9: Fuel Oil Delivery 1 EA $358,558.85

CLIN

0011 Option 10: On Site Fuel Storage 1 EA $231,674.21

CLIN

0012 Option 11: Bollards 1 EA $53,279.60

Total BID $11,568,324.43

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

N4008524B2507

2. DATE ISSUED

6/12/2024

3. DATE OPENED

7/19/2024

PAGE OF

4. ISSUING OFFICE

NAVFAC MID ATLANTIC

PWD-ME FEAD PORTSMOUTH B59 PORTSMOUTH NAVAL SHIPYARD

PORTSMOUTH, NH 03801-2032

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

Philip Cole, Contracting Officer

SIGNATURE 7/19/2024

5. PROJECT TITLE

Demolish Bulk Fuel Facility Cutler - Cutler, ME

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

Goshawk, LLC San Antonio, TX 78232

SpecPro Environmental Services LLC Knoxville, TN 37932

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY 20% of Bid Price YES B. BID SECURITY 20% of Bid Price YES

$14,372,311.11 $11,898,741.50

$12,823,435.00 $11,056,637.55

6. NUMBER OF AMENDMENTS ISSUED: 2 C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED 2 of 2 C. AMENDMENTS ACKNOWLEDGED 2 of 2

E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT

$49,726.45

$202,261.65

$69,778.64

$117,324.31

$62,410.82

$47,558.98

$221,079.50

$34,882.89

$33,227.43

$36,774.85

$72,651.01

$386,431.50

$401,871.03

$153,539.98

$284,000.42

$148,532.58

$12,905.67

$16,894.70

$20,531.75

$4,258.87

$5,185.73

$9,151.30

2 2 PAGES

7A.

ITEM

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE D. UNIT PRICE

CLIN

0001 BASE BID - Demolish Bulk Fuel Facility 1 EA $16,457,000.00

CLIN

0002 Option 1: Demo Oil Water Separator 1 EA $48,700.00

CLIN

0003 Option 2: Concrete Slab 1 EA $57,000.00

CLIN

0004 Option 3: Demo Concrete Pan 1 EA $11,700.00

CLIN

0005 Option 4: Waterproofing System 1 EA $14,700.00

CLIN

0006 Option 5: Crack Injection Repairs 1 EA $11,700.00

CLIN

0007 Option 6: Type B Spall Repairs 1 EA $17,700.00

CLIN

0008 Option 7: Paint Bulk Tank Pipe Supports 1 EA $47,000.00

CLIN

0009 Option 8: Mill and Overlay 1 EA $77,000.00

CLIN

0010 Option 9: Fuel Oil Delivery 1 EA $497,127.60

CLIN

0011 Option 10: On Site Fuel Storage 1 EA $777,000.00

CLIN

0012 Option 11: Bollards 1 EA $19,000.00

Total BID EA $18,035,627.60

4. ISSUING OFFICE

NAVFAC MID ATLANTIC

PWD-ME FEAD PORTSMOUTH B59 PORTSMOUTH NAVAL SHIPYARD

PORTSMOUTH, NH 03801-2032

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

Philip Cole, Contracting Officer

SIGNATURE DATE SIGNED

7/19/2024

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

N4008524B2507

2. DATE ISSUED

6/12/2024

3. DATE OPENED

7/19/2024

PAGE OF

5. PROJECT TITLE

Demolish Bulk Fuel Facility Cutler - Cutler, ME NO. 4 NO. 5

N/A N/A B. BID SECURITY 20% of Bid Price ___

P&S Construction, Inc Westford, MA 01886

NO. 3

9. OFFERS

B. BID SECURITY 20% of Bid Price YES B. BID SECURITY 20% of Bid Price ___

$0.00 $0.00

6. NUMBER OF AMENDMENTS ISSUED: 2 C. AMENDMENT ACKNOWLEDGED _ of 2 C. AMENDMENTS ACKNOWLEDGED _ of 2

E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT

C. AMENDMENT ACKNOWLEDGED 2 of 2

page 1 of 3
page 2 of 3
2024-07-19T18:07:05-0400
COLE.PHILIP.J.1271622127
2024-07-19T18:30:55-0400
COLE.PHILIP.J.1271622127