This document is an inspection report for a diesel tank (CU-103-AST-02) located at the Cutler, Maine facility operated by CCI Construction Services. The report was prepared by Applied Technical Services (ATS) and provides a visual assessment of the exterior condition of the tank, including the foundation, shell, heads, venting, secondary containment, and other components.

The key findings include the need to verify the adequacy of the tank's normal and emergency venting based on applicable standards, and the presence of scattered coating failure, surface rust, and light corrosion on various tank components. ATS recommends recoating affected areas and performing periodic owner inspections, with a formal inspection recommended every 5-10 years. The report also notes discrepancies between the tank's fuel level measurement and the control room gauge reading.

View the file

Other files for this federal contract opportunity

Other files attached to Results - Demolish Bulk Fuel Facility Cutler, newest first.
File Type Posted
1419 - Abstract of Offers - Cutler Demo Fuel Facility.pdf PDF
AMD 02 CU-127-AST-01.pdf PDF
AMD 02 CU-103-AST-03.pdf PDF
AMD 02 CU-126-AST-01.pdf PDF
AMD 02 CU-125-AST-01.pdf PDF
AMD 02 02 82 00.00 22.pdf PDF
AMD 02 CU-103-AST-01.pdf PDF
AMD 02 Procedures for Excavating in Areas of Grounding Grid-11Jan2023.pdf PDF
AMD 02 31 23 00.00 22.pdf PDF
AMD 02 02 83 00.00 22.pdf PDF
AMD 02 Existing Transient Tank Foundation Drawing.pdf PDF
AMD 02 Gov Responses to Remaining PPIs - Demo Fuel Cutler - 24B2507.pdf PDF
Amendment 02 N4008524B2507 Demo Bulk Fuel Facility.pdf PDF
AMD 02 CU-103-AST-04.pdf PDF
AMD 01 NAVFAC Cutler AST Replacement Env Investigation Ltr_11.8.2023.pdf PDF
AMD 01 Sign in Sheet - Bulk Fuel Cutler.pdf PDF
Amendment 01 N4008524B2507 Demo Bulk Fuel Facility.pdf PDF
AMD 01 Cutler Fuel Tank - Natural Resource Report.pdf PDF
AMD 01 Cutler Fuel Tank Repl - Geotech Data Report.pdf PDF
AMD 01 Weston Sampson_NCTCS Cutler Fuel Tanks_RBM Survey Report.pdf PDF
AMD 01 Existing Bulk Fuel Tank Foundation Drawings.pdf PDF
AMD 01 Cutler Fuel Tank - Wetlands.pdf PDF
AMD 01 Gov Responses to PPIs - Demo Fuel Cutler - 24B2507.pdf PDF
Time Sensitive - Access Instructions - Cutler Site Walk.pdf PDF
Released N4008524B2507 Demolish Bulk Fuel Facilities Cutler.pdf PDF
Drawings - Demolish Bulk Fuel Facility Cutler.pdf PDF
Specifications - Demolish Bulk Fuel Facility Cutler.pdf PDF
SECNAV 5512.pdf PDF
Time Sensitive - Access List - Cutler Site Walk.xlsx XLSX spreadsheet
Bid Form - Bulk Fuel Cutler.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPLIED TECHNICAL SERVICES

In states where Applied Technical Services does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

Professional Engineers and Scientists: Design • Consulting • Testing • Inspection

External Inspection:

Internal Inspection:

May 30, 2023 Not in scope

Elizabeth Ray

AC44195

UT Thickness Testing: Not in scope

STI

CU-103-AST-02

Cutler, ME

CCI Construction Services

East Syracuse, NY • 315-487-4390

Inspection Report

Diesel Tank for

Reviewed by:

Senior Engineer

Job Number: 399868

Inspected by:

Project Manager

Chuck Morissette

451A (03-2023) Proprietary Document. To be reproduced only in full.

Executive Summary

Action Items

Table of Contents 399868

Job Number

General Equipment Information

Photographs

Reinspection Frequency

Visual Inspection

Personnel Qualifications left blank

Long: Circ:

n/aJacket-Side

Contents n/a

+ pressure - vacuum temperature

UnknownManufacturer

Year of Construction

Carbon Steel

Yes/No

FCT

n/a n/an/a vent pressure vent vacuum

Field Observed

Design

Field Observed

Design

0 Ambient0

UnknownUnknown vent pressure vent vacuum temperature

Unknown n/a n/a temperature n/a

Equipment Identification

Diesel TankEquipment Name

General Equipment Information 399868

Job Number

Owner

Cutler, ME

CCI Construction Services

Location

Equipment Location

Behind building 103.

Equipment Number CU-103-AST-02

Approximate Volume

N/A

NDT Technician(s)

15,422

Elizabeth Ray gallons

Inspector(s)

STI (AC44195)

Training

Training

N/A

Inspection Scope

Unknown

STI Category 1: with spill control & with CRDM

None

Joint Efficiency

YesPrevious External Visual

No

Historical Documentation

Inspection & Analysis STI-SP001

Maine

Date

NoDrawings Available

No

UnknownSerial Number

+ pressure - vacuum temperature

STI Category 2: with spill control & without CRDM

STI Category 3: without spill control

External Visual

Internal Visual

UT Thickness

Contents Diesel

State Equipment is Located

Not Applicable

Other Test Methods Performed

Jurisdiction and RAGAGEP*

Shell-Side

Service Category

Previous Internal Visual

Previous UTT Data -

Unknown

Unknown

Unknown

Construction Information

Construction Standard

Material Type

05-2022

While in service

Not in scope

Not in scope

451A (03-2023)

* Recognized and Generally Accepted Good Engineering Practices

Proprietary Document. To be reproduced only in full.

External Condition

Job Number

Scope of Work

Over-Pressure Protection

399868

STI-SP001 Category

ATS performed inspections in general accordance with STI-SP001. This report lists the results of inspection and provides a condition assessment of the equipment based upon the information gathered.

External inspections were performed from the ground and available ladders/platforms. External inspections were performed at areas that were safely accessible.

Foundation

Soil/earth is the foundation for this equipment. No visible deterioration or damage observed.

North Head

Scattered coating failure and surface rust observed throughout.

Shell

Scattered coating failure, surface rust, and light corrosion observed throughout.

Support saddles were observed. Scattered concrete deterioration observed.

Grounding Cables

This report identifies the over-pressure protection that was readily obvious during inspection. No determination of relief capacity was made by ATS. The owner should verify properly sized protection is provided for the system.

The tank was determined to be Category 1 per STI SP001. The basis for this determination is the spill control was observed to be the secondary containment, and the inherent CRDM was observed to be the tank is lifted off the ground.

The owner should verify the ability of the spill control to fully contain a release.

Normal Venting

None was observed on this equipment.

Overflow

None was observed on this equipment.

Nozzles

This was observed on the shell. No visible deterioration or damage observed.

Emergency Venting

Scattered coating failure and surface rust observed throughout.

South Head

Scattered coating failure and surface rust observed throughout.

Anchorage

One grounding cable was observed. No visible deterioration or damage observed.

Job Number

399868

Analysis

This equipment was visually assessed in general accordance with STI-SP001. The results listed in this report are based upon the visual inspection performed, and does not include UT thickness data analysis (as UTT was not part of the inspection scope).

Secondary Containment

One grounding cable was observed. No visible deterioration or damage observed.

An earthen berm was observed. The earthen berm contains tanks 103-AST-01 thru 103-AST-04 and is lined. No visible deterioration or damage observed.

Nameplate/Platforms/Ladders/Labels

The tank does not have a nameplate and labeling is missing and/or illegible due to weathering. Coating failure and surface rust on access platforms and ladders.

Additional Comments

The tank was stick tested; no water was found to be present. 69" of fuel was measured. Sensor/fill gauge is located in control room; the gauge reading was 88.2". This discrepancy was noted to the operator.

Observation / Finding Action Item Priority

Priority 1 - High likelihood/consequence of failure (or) Critical code/standard deficiency (or) May not be fit for service without action

Priority 2 - Med likelihood/consequence of failure (or) Add'l info needed for evaluation (or) Action may be considered for continued service

Priority 3 - Low likelihood/consequence of failure (or) Non-critical code/standard deficiency (or) Best practice/preventative maintenance

Action items listed below are based on observations recorded at the time of inspection and/or findings determined during the post-inspection analysis. Priority "1", "2", "3" has been applied and is defined as:

Job Number

Action Items 399868

Per UL-142, this tank requires a normal vent size of 2.5 inches and an emergency vent size of 8 inches. 6 inch normal venting was observed, and no emergency venting was observed.

These are cursory calculations based on observations at the time of inspection. The Owner should verify venting capacity satisfies the requirements of an applicable standard for the system operating parameters (e.g. API-2000, NFPA-30, UL-142).

2 Coating deterioration was observed.

Coat areas as necessary. Refer to coating provider for best surface preparation and coating application.

❶

❶ ❷

❶ ❸

Elizabeth Ray NY registered Engineer-in-Training; degreed Mechanical Engineer. 10+ years experience with inspection, evaluation, repair, and design within various industries. API 510 / 653 / 570 certified inspector; FTPI certified fiberglass inspector; STI certified inspector; Pennsylvania DEP IAF and IAM certified inspector.

May-2043 year(s) year(s)20

Frequency based on STI-SP001.

Per STI-SP001, Periodic Owner inspections should be performed monthly.

❶

Personnel Qualifications

Per STI-SP001, this size Category 1 tanks do not require this formal inspection. However, performance of this inspection is considered a best practice to allow for an accurate condition assessment of the equipment. Owner may consider a 5 - 10 year frequency for this formal inspection.

Internal Visual

UT Thickness

External Visual

N/A year(s) N/A

Unknown prior inspection

❷

Maximum frequencies are based on applicable industry codes, standards, best practices, and judgement of ATS at the time of this evaluation. Formal inspections should be performed by qualified personnel experienced with inspection practices.

Reinspection Frequency 399868

Job Number

Shortened inspection interval due to lack of inspection history on file.❸

Date of Next InspectionMax. Frequency NotesFormal Inspections

2 Yes No NA NI

- X

- X

2 Yes No NA NI

- X

- X

2 Yes No NA NI

- X

- X

9 Yes No NA NI

- X

- X

- X

- X

- X

- X

- X

- X

- X

6 Yes No NA NI

- X

- X

- X

- X

- X

- X

Scattered coating failure, surface rust, and light corrosion observed throughout.

Visual limitations (access, insulation, cleanliness) No limitations

Type

None observed

No visible deterioration or damage observed.

Nominal Vent Diameter (inches)

Type

Corrosion, pitting, defects observed

Atmospheric vent

None observed

Device type(s) Atmos vent, Vacuum breaker, Flame arrestor, Weighted plate, Conservation vent

Location observed (roof, shell, not observed)

Overflow Condition / Comments

Location observed (roof, shell, not observed) None observed

Visual limitations (access, insulation, cleanliness)

Corrosion, pitting, defects observed

Indication of pluggage observed

Device type(s) Atmos vent, Vacuum breaker, Flame arrestor, Weighted plate, Conservation vent, Frangible roof

Condition / Comments

Condition / Comments

399868

Job Number

External Visual Inspection

Emergency Venting Condition / Comments

Corrosion, pitting, defects observed

Visual limitations (access, insulation, cleanliness)

NA = Not Applicable

NI = Not Inspected

Inspector Name(s): Elizabeth Ray

Normal Venting

Indication of pluggage observed

Location observed (roof, shell, not observed)

Indication of pluggage observed

Observed on shell

Nominal Vent Diameter (inches)

Corrosion or pitting observed

No limitationsVisual limitations (access, insulation, cleanliness)

Coating failure (peeling, disbond)

Shell

Insulation damage (wet, staining, missing, CUI)

Weld or rivet defects (cracks, leaks, corrosion)

Defects observed (bulges, dents, holes)

Insulation damage (wet, staining, missing, CUI)

Angle ring defects (distortion, corrosion)

North Head

Weld or rivet defects (cracks, leaks, corrosion)

No limitations

Debris build-up observed

Defects observed (bulges, dents, holes)

Head bolt issues (corrosion, damage, missing)

Drainage issues (standing water)

Corrosion or pitting observed

Visual limitations (access, insulation, cleanliness)

Condition / Comments

Scattered coating failure and surface rust observed throughout.

Coating failure (peeling, disbond)

Attachment defects (brackets, stiffening ring)

399868

Job Number

External Visual Inspection

NA = Not Applicable

NI = Not Inspected

Inspector Name(s): Elizabeth Ray

5 Yes No NA NI

- X

- X

- X

- X

- X

6 Yes No NA NI

- X

- X

- X

- X

- X

- X

4 Yes No NA NI

- X

- X

- X

- X

5 Yes No NA NI

- X

- X

- X

- X

- X

1 Yes No NA NI

- X

4 Yes No NA NI

- X

- X

- X

- X

Condition / Comments

No limitations

Condition / Comments

Condition / Comments

Type (soil, ring-wall, concrete pad, structural steel)

Coating failure (peeling, disbond)

Anchor bolt defects (corrosion, necking, broken)

Structure defects (bending, cracking, broken)

No visible deterioration or damage observed.

Defects observed (broken, frayed, corroded)

Quantity observed (none, 1, 2, 3, 3+) 1

Foundation

Secondary Containment Condition / Comments

Grounding Cables

Sealant defects (degradation, missing, gaps)

Type (none, earth berm, dike wall, curbing) Earthen berm

Defects observed (bulges, dents, holes, cracks)

Drainage issues (standing water)

Areas breached or structurally unstable

Drainage issues (standing water)

Defects observed (bulges, dents, holes)

Saddles

No visible deterioration or damage observed.

Exposed aggregate, debris, vegetation build-up

The earthen berm contains tanks 103-AST-01 thru 103-AST-04 and is lined.

No visible deterioration or damage observed.

Defects observed (cracks, spalling, etc.)

Anchorage

Head bolt issues (corrosion, damage, missing)

Corrosion or pitting observed

Visual limitations (access, insulation, cleanliness)

Coating failure (peeling, disbond)

Scattered coating failure and surface rust observed throughout.

Nozzles

South Head

Scattered coating failure and surface rust observed throughout.

Coating failure (peeling, disbond)

Insulation damage (wet, staining, missing, CUI)

Corrosion or pitting observed

Visual limitations (access, insulation, cleanliness)

Weld or rivet defects (cracks, leaks, corrosion)

No limitations

Weld defects (cracks, leaks, corrosion)

Repad issues (weep hole leaks, plugged)

Flange bolt issues (corrosion, loose, missing)

Corrosion or pitting observed

Condition / Comments

Uneven settling or frost heaving observed

Corrosion or pitting observed

Visual limitations (access, insulation, cleanliness)

Condition / Comments

Scattered concrete deterioration observed.

Type (skirt, saddles, lugs, chairs, legs, none)

Soil only

No limitations

Job Number

External Visual Inspection

NA = Not Applicable

NI = Not Inspected

Inspector Name(s): Elizabeth Ray

6 Yes No NA NI

X

X

X

X

X

X

Miscellaneous Condition / Comments

The tank does not have a nameplate and labeling is missing and/or illegible due to weathering. Coating failure and surface rust on access platforms and ladders.

Nameplate

- nameplate missing

- corroded or illegible

Labels

- labels damaged or torn

- labels illegible

- corrosion observed

- defects (bent, unsupported) Platforms/Ladders

Additional Conditions / Comments

The tank was stick tested; no water was found to be present. 69" of fuel was measured. Sensor/fill gauge is located in control room; the gauge reading was 88.2". This discrepancy was noted to the operator.

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 1'

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 2'

399868

Overall view.

Photo 1

Job Number

Photographs

Photo 2

North head.

Job Number

Photographs

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 3'

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 4'

South head.

Photo 4

Shell, access ladder.

Photo 3

Job Number

Photographs

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 5'

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 6'

Photo 5

Shell.

Photo 6

Shell.

Job Number

Photographs

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 7'

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 8'

Photo 7

Shell, venting, saddles.

Photo 8

Shell.

Job Number

Photographs

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 9'

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 10'

Photo 9

Manway.

Photo 10

Shell, venting.

Job Number

Photographs

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 11'

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 12'

Photo 11

Nozzle.

Photo 12

Grounding.

Job Number

Photographs

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 13'

DELETE THE CAPTION

BELOW BEFORE ADDING

NEW PHOTO.

DO NOT DELETE: 'Photo 14'

Photo 13

Saddles, foundation, containment.

Photo 14

Containment area.