Demolish Bulk Fuel Facility Cutler

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
N4008524B2507
Agency
Naval Facilities Engineering Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237120 Oil and Gas Pipeline and Related Structures Construction
PSC
Z2NA Repair Or Alteration Of Fuel Supply Facilities
Place of performance
Cutler, Maine 04626, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy Naval Facilities Engineering Command is seeking contractors to demolish three existing bulk tanks and associated piping, as well as four transient fuel tanks and their corresponding dog houses, at NSA Cutler in Cutler, Maine. The work includes the installation of four new 50,000 gallon tanks in the existing bulk tank area and four 20,000 gallon tanks in the transient fuel area. The contract also includes 11 bid options, such as the demolition of the bulk tank berm oil water separator, providing a concrete slab, and making concrete repairs. The pre-solicitation notice has a posted date of May 23, 2024, and a due date of June 7, 2024, for responses.

This contract opportunity is not set aside for any specific business category. There are no details provided about potential incumbent contractors or the expected award value. The contract requires the demolition of existing fuel tanks and the installation of new tanks, with a total quantity of 8 new tanks to be installed.

Notice text

  • The work includes all labor, material, equipment, transportation, supervision, and incidental related work to demolish three existing bulk tanks and associated piping in the bulk tank area at NSA Cutler in Cutler, Maine. It also includes the demo of the four transient fuel tanks and their corresponding dog houses covering the utility pits. A total of four new 50,000 gal tanks will be installed in the existing bulk tank area and four 20,000 gal tanks will be installed in the transient fuel area. There are 11 bid options. Bid option 1: Includes the demo of the bulk tank berm oil water separator. Bid option 2: Includes providing a 6 inch concrete slab on abandoned bulk tank foundation. Bid option 3: Includes the demo of cantilevered concrete pan at transient tank dog house. Bid option 4: Includes providing a reinforced membrane waterproofing system to building. Bid option 5: Includes providing concrete repairs inside transient utility tunnel - Crack Injection. Bid option 6: Includes providing concrete repairs inside transient utility tunnel - Type B Spall. Bid option 7: Includes transport 650 CY of excess soil offsite in lieu of grading excess soils around project site. Bid option 8: Includes mill and overlay of roadways around project area. Bid option 9: Includes Fuel oil delivery and tank filling upon completion of Phase 2. Bid option 10: Includes on site temporary fuel storage for fuel oil removed as part of Phase 2. Bid option 11: provides for the installation of bollards for transient tank parking lot.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Results - Demolish Bulk Fuel Facility Cutler Award Award Notice
Demolish Bulk Fuel Facility Cutler - Amendment 01 Latest solicitation Solicitation
Results - Demolish Bulk Fuel Facility Cutler Solicitation
Demolish Bulk Fuel Facility Cutler This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity