Bid Form - Bulk Fuel Cutler.pdf

PDF 327 KB Posted

Attached to
Results - Demolish Bulk Fuel Facility Cutler Federal contract opportunity
Solicitation number
N4008524B2507
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is a Bid Form for the Demolish Bulk Fuel Facility Cutler project, DE18-2329, located at NCTS Cutler in Cutler, Maine. The work includes demolishing three existing bulk tanks and associated piping in the bulk tank area, as well as four transient fuel tanks and their corresponding dog houses. The project also includes installing four new 50,000-gallon tanks in the existing bulk tank area and four 20,000-gallon tanks in the transient fuel area.

The Bid Form contains 12 contract line items, including the base bid and 11 bid options. The bid options cover additional demolition work, concrete repairs, painting, paving, fuel oil delivery and storage, and the installation of bollards. Contractors must provide pricing for each line item, including material, labor, and equipment costs. The solicitation number is N4008524B2507, and the procuring agency is the Department of the Navy, Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to Results - Demolish Bulk Fuel Facility Cutler, newest first.
File Type Posted
1419 - Abstract of Offers - Cutler Demo Fuel Facility.pdf PDF
AMD 02 CU-103-AST-01.pdf PDF
AMD 02 Procedures for Excavating in Areas of Grounding Grid-11Jan2023.pdf PDF
AMD 02 CU-126-AST-01.pdf PDF
AMD 02 CU-125-AST-01.pdf PDF
AMD 02 02 82 00.00 22.pdf PDF
AMD 02 CU-127-AST-01.pdf PDF
AMD 02 CU-103-AST-03.pdf PDF
AMD 02 31 23 00.00 22.pdf PDF
AMD 02 CU-103-AST-02.pdf PDF
AMD 02 02 83 00.00 22.pdf PDF
AMD 02 Existing Transient Tank Foundation Drawing.pdf PDF
AMD 02 Gov Responses to Remaining PPIs - Demo Fuel Cutler - 24B2507.pdf PDF
Amendment 02 N4008524B2507 Demo Bulk Fuel Facility.pdf PDF
AMD 02 CU-103-AST-04.pdf PDF
AMD 01 Cutler Fuel Tank - Natural Resource Report.pdf PDF
AMD 01 Cutler Fuel Tank Repl - Geotech Data Report.pdf PDF
AMD 01 NAVFAC Cutler AST Replacement Env Investigation Ltr_11.8.2023.pdf PDF
AMD 01 Sign in Sheet - Bulk Fuel Cutler.pdf PDF
Amendment 01 N4008524B2507 Demo Bulk Fuel Facility.pdf PDF
AMD 01 Weston Sampson_NCTCS Cutler Fuel Tanks_RBM Survey Report.pdf PDF
AMD 01 Existing Bulk Fuel Tank Foundation Drawings.pdf PDF
AMD 01 Cutler Fuel Tank - Wetlands.pdf PDF
AMD 01 Gov Responses to PPIs - Demo Fuel Cutler - 24B2507.pdf PDF
Drawings - Demolish Bulk Fuel Facility Cutler.pdf PDF
Specifications - Demolish Bulk Fuel Facility Cutler.pdf PDF
Released N4008524B2507 Demolish Bulk Fuel Facilities Cutler.pdf PDF
Time Sensitive - Access Instructions - Cutler Site Walk.pdf PDF
SECNAV 5512.pdf PDF
Time Sensitive - Access List - Cutler Site Walk.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

Demolish Bulk Fuel Facility Cutler

DE18-2329

PROJECT LOCATION

NCTS Cutler Cutler, Maine

CONTRACTOR:

DATE:

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0001AA Mechanical - Tank Demo 1 LS

0001AB Mechanical - Piping and Accessories Demo 1 LS

0001AC Mechanical - Tanks 1 LS

0001AD Mechanical - Pipes and Accessories 1 LS

0001AE Civil Demo 1 LS

0001AF Civil Site Work 1 LS

0001AG

Civil Soil Disposal and Dewatering Frac Tank

1 LS

0001AH Electrical Demo 1 LS

0001AI Electrical - Power and Conduit 1 LS

0001AJ Electrical - Controls 1 LS

0001AK Structural Demo 1 LS

0001AL Structural 1 LS

0001AM Maine Historic Engineering Record 1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0001 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

NOTE:

Refer to Scope of Work.

CLIN 0001 - BASE BID

QUANTITY

DE18-2329

PROJECT LOCATION

NCTS Cutler Cutler, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 1 - Demo Bulk Tank Berm Oil Water Separator

1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0002 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 2 - Concrete Slab on Abandoned 210K Bulk Tank Foundation

1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0003 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

BID OPTION 2

QUANTITY

BID OPTION 1

DE18-2329

PROJECT LOCATION

NCTS Cutler Cutler, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 3 - Demo Cantilevered Concrete Pan at Transient Tank Dog House

4 EA

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0004 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 4 - Reinforced Membrane Waterproofing System

1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0005 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

BID OPTION 3

QUANTITY

BID OPTION 4

DE18-2329

PROJECT LOCATION

NCTS Cutler Cutler, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 5 - Concrete Repairs Inside Transient Utility Tunnel - Crack Injection

150 LF

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0006 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 6 - Concrete Repairs Inside Transient Utility Tunnel – Type B Spall

100 SF

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0007 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

BID OPTION 5

QUANTITY

BID OPTION 6

DE18-2329

PROJECT LOCATION

NCTS Cutler Cutler, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 7 - Paint Bulk Tank Pipe Supports

2 EA

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0008 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0009 Bid Option 8 - Pavement - Mill & Overlay 340 SY

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0009 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

BID OPTION 8

QUANTITY

BID OPTION 7

DE18-2329

PROJECT LOCATION

NCTS Cutler Cutler, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0010AA

Bid Option 9 - Fuel Oil Transport, Delivery ,and Tank Filling (9,300 gal Max Each Delivery)

7 EA

0010AB

Bid Option 9 - ASTM standard D975, Grade No. 2. Fuel Oil

65,100 GAL

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0010 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 10 - On Site Temporary Fuel Storage

1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0011 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

BID OPTION 9

QUANTITY

BID OPTION 10

DE18-2329

PROJECT LOCATION

NCTS Cutler Cutler, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

CLIN DESCRIPTION NUMBER UNIT COST COST COST TOTAL

Bid Option 11 - Bollards for Transient Tank Parking Lot

1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0012 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

BID OPTION 11

QUANTITY

TOTAL PRICE CLINS 0001 THRU 0012: $_________________

File details come from the government source that posted it. Updated .