This document is a technical specification for the management of lead, cadmium, and chromium during renovation, demolition, construction, removal, and abatement activities for a federal project. The key details are:
The specification covers project-related activities, including renovation, demolition, removal, and/or remediation, impacting paint with lead (PWL) and/or material containing lead (MCL), cadmium, and chromium. It outlines requirements for worker protection, exposure monitoring, clearance sampling, and waste disposal procedures to be followed. The specification requires the development of a detailed Lead, Cadmium, and Chromium Compliance Plan, including an Occupant Protection Plan, and prescribes specific methods and equipment to be used for containment, abatement, and cleanup. Clearance levels are defined for lead, cadmium, and chromium in dust, soil, and on surfaces. All work must be performed in accordance with applicable federal, state, and local regulations.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02 83 00.00 22
MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM DURING RENOVATION, DEMOLITION,
CONSTRUCTION, REMOVAL, AND ABATEMENT
(NORTHERN SITES PROJECTS)
02/24
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP/SAFE Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems
ASTM INTERNATIONAL (ASTM)
ASTM E1613 (2012) Standard Test Method for Determination of Lead by Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES), Flame Atomic Absorption Spectrometry (FAAS), or Graphite Furnace Atomic Absorption Spectrometry (GFAAS) Techniques
ASTM E1644 (2017) Standard Practice for Hot Plate Digestion of Dust Wipe Samples for the Determination of Lead
ASTM E1726 (2001; R 2009) Preparation of Soil Samples by Hotplate Digestion for Subsequent Lead Analysis
ASTM E1727 (2016) Standard Practice for Field Collection of Soil Samples for Subsequent Lead Determination
ASTM E1728 (2016) Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Lead Determination
ASTM E1792 (2003; R 2016) Standard Specification for Wipe Sampling Materials for Lead in Surface Dust
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films
DEMOLISH BULK FUEL FACILITY CUTLER 1694050
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD)
HUD 6780 (1995; Errata Aug 1996;Rev Ch. 7 - 1997) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.103 Respiratory Protection
29 CFR 1926.1126 Chromium
29 CFR 1926.1127 Cadmium
29 CFR 1926.21 Safety Training and Education
29 CFR 1926.33 Access to Employee Exposure and Medical Records
29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists
29 CFR 1926.59 Hazard Communication
29 CFR 1926.62 Lead
29 CFR 1926.65 Hazardous Waste Operations and Emergency Response
40 CFR 260 Hazardous Waste Management System: General
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential Structures
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials
Communications, Emergency Response Information, and Training Requirements
49 CFR 178 Specifications for Packagings
U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)
ND OPNAVINST 5100.23 (2005; Rev G) Navy Occupational Safety and Health (NAVOSH) Program Manual
UNDERWRITERS LABORATORIES (UL)
UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units
STATE OF MAINE, DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
ME L&C PROGRAM State of Maine Licensing and Certification Program http://www.mainelegislature.org/legis/statutes/38/title
06 096 CMR 425 Asbestos Management Regulations http://www.maine.gov/sos/cec/rules/06/096/096c425.doc
STATE OF MAINE REGULATIONS
MAINE REGS The following State of Maine regulations are available on request to the Contracting Officer or at:
http://www.maine.gov/sos/cec/rules/06/096/096c424.docx
PORTSMOUTH NAVAL SHIPYARD (PNSY)
5090.6F (4-21) Solid Waste Operations
5090.30 (4-05) Hazardous Waste Generator Standards
1.2 DEFINITIONS
1.2.1 Abatement
Measures defined in 40 CFR 745, Section 223, designed to permanently eliminate lead-based paint hazards.
1.2.2 Action Level
Employee exposure, without regard to use of respirators, to an airborne concentration of lead of 30 micrograms per cubic meter of air averaged over an 8-hour period; to an airborne concentration of cadmium of 2.5 micrograms per cubic meter of air averaged over an 8-hour period; to an airborne concentration of chromium (VI) of 2.5 micrograms per cubic meter of air averaged over an 8-hour period.
1.2.3 Area Sampling
Sampling of lead, cadmium, and chromium concentrations within the lead, cadmium, and chromium control area and inside the physical boundaries which is representative of the airborne lead, cadmium, and chromium concentrations but is not collected in the breathing zone of personnel (approximately 5 to 6 feet above the floor).
1.2.4 Cadmium Permissible Exposure Limit (PEL)
Five micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1926.1127. If an employee is exposed for more than 8-hours in a work day, determine the PEL by the following formula:
PEL (micrograms/cubic meter of air) = 40/No. hrs worked per day
1.2.5 Certified Industrial Hygienist (CIH)
As used in this section refers to a person retained by the Contractor who is certified as an industrial hygienist and who is trained in the recognition and control of lead, cadmium and chromium hazards in accordance with current federal, State, and local regulations. CIH must be certified for comprehensive practice by the American Board of Industrial Hygiene.
The Certified Industrial Hygienist must be independent of the Contractor and must have no employee or employer relationship which could constitute a conflict of interest.
1.2.6 Chromium Permissible Exposure Limit (PEL)
Five micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1926.1126. If an employee is exposed for more than 8-hours in a work day, determine the PEL by the following formula:
PEL (micrograms/cubic meter of air) = 40/No. hrs worked per day
1.2.7 Competent Person (CP)
As used in this section, refers to a person employed by the Contractor who is trained in the recognition and control of lead, cadmium and chromium hazards in accordance with current federal, State, and local regulations and has the authority to take prompt corrective actions to control the lead, cadmium and chromium hazard. The Contractor may provide more than one CP as required to supervise and monitor the work. The CP must be a Certified Industrial Hygienist (CIH) certified by the American Board of Industrial Hygiene or a Certified Safety Professional (CSP) certified by the Board of Certified Safety Professionals or a licensed lead-based paint abatement Supervisor/Project Designer in the State of Maine.
1.2.8 Contaminated Room
Refers to a room for removal of contaminated personal protective equipment
(PPE).
1.2.9 Decontamination Shower Facility
That facility that encompasses a clean clothing storage room, and a contaminated clothing storage and disposal rooms, with a shower facility in between.
1.2.10 Deleading
Activities conducted by a person who offers to eliminate lead-based paint or lead-based paint hazards or paints containing cadmium/chromium or to plan such activities in commercial buildings, bridges or other structures.
1.2.11 Eight-Hour Time Weighted Average (TWA)
Airborne concentration of lead, cadmium, and chromium to which an employee is exposed, averaged over an 8-hour workday as indicated in 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127.
1.2.12 High Efficiency Particulate Air (HEPA) Filter Equipment
HEPA filtered vacuuming equipment with a UL 586 filter system capable of collecting and retaining lead, cadmium, and chromium-contaminated particulate. A high efficiency particulate filter demonstrates at least
99.97 percent efficiency against 0.3 micron or larger size particles.
1.2.13 Lead
Metallic lead, inorganic lead compounds, and organic lead soaps. Excludes other forms of organic lead compounds. The use of the term Lead in this section also refers to paints which contain detectable concentrations of Cadmium and Chromium. For the purposes of the section lead-based paint (LBP) and paint with lead (PWL) also contains cadmium and chromium.
1.2.14 Lead-Based Paint (LBP)
Paint or other surface coating that contains lead in excess of 1.0 milligrams per centimeter squared or 0.5 percent by weight.
1.2.15 Lead-Based Paint Activities
In the case of target housing or child occupied facilities, lead-based paint activities include; a lead-based paint inspection, a risk assessment, or abatement of lead-based paint hazards.
1.2.16 Lead-Based Paint Hazards
Paint-lead hazard, dust-lead hazard or soil-lead hazard as identified in 40 CFR 745, Section 65. Any condition that causes exposure to lead from lead-contaminated dust, lead-contaminated soil, lead-based paint that is deteriorated or present in accessible surfaces, friction surfaces, or impact surfaces that would result in adverse human health effects.
1.2.17 Lead, Cadmium, and Chromium Control Area
A system of control methods to prevent the spread of lead, cadmium, and chromium dust, paint chips or debris to adjacent areas that may include temporary containment, floor or ground cover protection, physical boundaries, and warning signs to prevent unauthorized entry of personnel.
HEPA filtered local exhaust equipment may be used as engineering controls to further reduce personnel exposures or building/outdoor environmental contamination.
1.2.18 Lead Permissible Exposure Limit (PEL)
Fifty micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1926.62. If an employee is exposed for more than 8-hours in a work day, determine the PEL by the following formula:
PEL (micrograms/cubic meter of air) = 400/No. hrs worked per day
1.2.19 Material Containing Lead/Paint with Lead (MCL/PWL)
Any material, including paint, which contains lead as determined by the testing laboratory using a valid test method. The requirements of this section do not apply if no detectable levels of lead are found using a quantitative method for analyzing paint or MCL using laboratory instruments with specified limits of detection (usually 0.01 percent). An X-Ray Fluorescence (XRF) instrument is not considered a valid test method.
1.2.20 Personal Sampling
Sampling of airborne lead, cadmium, and chromium concentrations within the breathing zone of an employee to determine the 8-hour time weighted average concentration in accordance with 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127. Samples must be representative of the employees' work tasks. Breathing zone must be considered an area within a hemisphere, forward of the shoulders, with a radius of 6 to 9 inches and centered at the nose or mouth of an employee.
1.2.21 Physical Boundary
Area physically roped or partitioned off around lead, cadmium, and chromium control area to limit unauthorized entry of personnel.
1.2.22 Target Housing
Residential real property which is housing constructed prior to 1978, except housing for the elderly or persons with disabilities (unless any one or more children age 6-years or under resides or is expected to reside in such housing for the elderly or persons with disabilities) or any zero bedroom dwelling.
1.3 DESCRIPTION
This specification covers all project-related activities, including, but not limited to, renovation, demolition, removal, and/or remediation, impacting PWL and/or material containing lead, cadmium, and chromium located as indicated on the drawings. The work covered by this section includes work tasks and the precautions specified in this section for the protection of building occupants and the environment during and after the performance of the hazard abatement activities in accordance with state and federal regulations and as specified herein.
1.3.1 Protection of Existing Areas To Remain
Project work including, but not limited to, lead, cadmium, and chromium hazard abatement work, storage, transportation, and disposal must be performed without damaging or contaminating adjacent work and areas. Where such work or areas are damaged or contaminated, restore work and areas to the original condition.
1.3.2 Coordination with Other Work
Coordinate with work being performed in adjacent areas to ensure there are no exposure issues. Explain coordination procedures in the Lead, Cadmium, and Chromium Compliance Plan and describe how the Contractor will prevent lead, cadmium and chromium exposure to other contractors and Government personnel performing work unrelated to lead, cadmium and chromium activities.
1.3.3 Sampling and Analysis
Submit a log of the analytical results from sampling conducted during the abatement. Keep the log of results current with project activities and brief the results to the Contracting Officer as analytical results are reported.
1.3.3.1 Dust Wipe Materials, Sampling and Analysis
Sampling must conform to ASTM E1728 and ASTM E1792. Analysis must conform to ASTM E1613 and ASTM E1644.
1.3.3.2 Soil Sampling and Analysis
Sampling must conform to ASTM E1727. Analysis must conform to ASTM E1613 and ASTM E1726.
1.3.3.3 Clearance Monitoring
a. Collect dust wipe samples inside, and, as appropriate, outside, the lead, cadmium and chromium hazard control area after the final visual inspection.
b. Collect exterior bare soil samples inside the lead, cadmium and chromium hazard control area after the final visual inspection.
1.3.4 Clearance Requirements
Target clearance levels - Option 1
(1) Lead - 400 ug/sq.ft. on floors or horizontal surfaces, or below concentrations detected in wipe samples collected before commencement of work - whichever is lower.
(2) Chromium - Below concentrations detected in wipe samples collected before commencement of work.
(3) Cadmium - Below concentrations detected in wipe samples collected before commencement of work.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Competent Person Qualifications; G
Training Certification; G
Occupational and Environmental Assessment Data Report; G
Medical Examinations; G
Lead, Cadmium, and Chromium Waste Management Plan; G
Licenses, Permits and Notifications; G
Occupant Protection Plan; G
Lead, Cadmium, and Chromium Compliance Plan; G
Lead, Cadmium, and Chromium Compliance Plan Checklist; G
Waste Characterization Sampling Plan; G
Sample Results; G
SD-03 Product Data
Respirators; G
Vacuum Filters; G
Negative Air Pressure System; G
Materials and Equipment; G
Expendable Supplies; G
Local Exhaust Equipment; G
Pressure Differential Automatic Recording Instrument; G
Pressure Differential Log; G
SD-06 Test Reports
Sampling and Analysis; G
Occupational and Environmental Assessment Data Report; G
Sampling Results; G
Pressure Differential Recordings For Local Exhaust System; G
SD-07 Certificates
Testing Laboratory; G
Third Party Consultant Qualifications; G
Occupant Notification; G
Notification of the Commencement of Work Impacting Lead, Cadmium, or Chromium; G
Clearance Certification; G
SD-11 Closeout Submittals
Turn-In Documents or Weight Tickets; G
1.5 QUALITY ASSURANCE
1.5.1 Qualifications
1.5.1.1 Competent Person (CP)
Submit name, address, and telephone number of the CP selected to perform responsibilities specified in paragraph COMPETENT PERSON (CP) RESPONSIBILITIES. Provide documented construction project-related experience with implementation of OSHA's Lead in Construction standard (29 CFR 1926.62), Chromium standard (29 CFR 1926.1126), and Cadmium standard (29 CFR 1926.1127) which shows ability to assess occupational and environmental exposure to lead, cadmium, and chromium; experience with the use of respirators, personal protective equipment and other exposure reduction methods to protect employee health. Demonstrate a minimum of 5 years experience implementing OSHA's Lead in Construction standard (29 CFR 1926.62), Chromium standard (29 CFR 1926.1126), and Cadmium standard (29 CFR 1926.1127). Submit proper documentation that the CP is trained and licensed and certified in accordance with federal, State and local laws. The competent person must possess the qualifications detailed in specification Section 1.2.8 above.
1.5.1.2 Training Certification
Submit a current certificate for each worker and supervisor, signed and dated by the accredited training provider, stating that the employee has received the required lead, cadmium and chromium training specified in 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127 and 40 CFR 745 and is certified to perform or supervise deleading, lead removal or demolition activities in the State of Maine.
1.5.1.3 Testing Laboratory
Submit the name, address, and telephone number of the testing laboratory selected to perform the analysis, testing, and reporting of airborne concentrations of lead, cadmium and chromium. Use a laboratory participating in the EPA National Lead Laboratory Accreditation Program (NLLAP) by being accredited by either the American Association for Laboratory Accreditation (A2LA) or the American Industrial Hygiene Association (AIHA) and that is successfully participating in the Environmental Lead Proficiency Analytical Testing (ELPAT) program to perform sample analysis. Laboratories selected to perform blood lead analysis must be OSHA approved.
1.5.1.4 Third Party Consultant Qualifications
Submit the name, address and telephone number of the third party consultant selected to perform the wipe sampling for determining concentrations of lead, cadmium and chromium in dust. Submit proper documentation that the consultant is trained and certified as an inspector technician or inspector/risk assessor by the USEPA authorized State (or local) certification and accreditation program.
1.5.1.5 Certified Risk Assessor
The Certified Risk Assessor must be certified pursuant to 40 CFR 745, Section 226 and be responsible to perform the clearance sampling, clearance sample data evaluation and summarize clearance sampling results in a section of the abatement report. The risk assessor must sign the abatement report to indicate clearance requirements for the contract have been met.
1.5.2 Requirements
1.5.2.1 Competent Person (CP) Responsibilities
a. Verify training meets all federal, State, and local requirements.
b. Review and approve Lead, Cadmium, and Chromium Compliance Plan for conformance to the applicable referenced standards.
c. Continuously inspect LBP/PWL or MCL work for conformance with the approved plan.
d. Perform (or oversee performance of) air sampling. Recommend upgrades or downgrades (whichever is appropriate based on exposure) on the use of PPE (respirators included) and engineering controls.
e. Ensure work is performed in strict accordance with specifications at all times.
f. Control work to prevent hazardous exposure to human beings and to the environment at all times.
g. Supervise final cleaning of the lead, cadmium, and chromium control area, take clearance wipe samples if necessary; review clearance sample results and make recommendations for further cleaning.
h. Certify the conditions of the work as called for elsewhere in this specification.
i. The CP must be certified pursuant to 40 CFR 745, Section 226 and is responsible for development and implementation of the occupant protection plan, the abatement report and supervision of lead, cadmium and chromium hazard abatement work activities.
1.5.2.2 Lead, Cadmium, and Chromium Compliance Plan
Submit a detailed job-specific plan of the work procedures to be used in the disturbance of lead, cadmium and chromium, LBP/PWL or MCL. Include in the plan a sketch showing the location, size, and details of lead, cadmium, and chromium control areas, critical barriers, physical boundaries, location and details of decontamination facilities, viewing ports, and mechanical ventilation system. Include a description of equipment and materials, work practices, controls and job responsibilities for each activity from which lead, cadmium, and chromium is emitted. Include in the plan, eating, drinking, smoking, hygiene facilities and sanitary procedures, interface of trades, sequencing of lead, cadmium, and chromium related work, collected waste water and dust containing lead, cadmium, and chromium and debris, air sampling, respirators, personal protective equipment, and a detailed description of the method of containment of the operation to ensure that lead, cadmium, and chromium is not released outside of the lead, cadmium, and chromium control area. Include site preparation, cleanup and clearance procedures. Include occupational and environmental sampling, training and strategy, sampling and analysis strategy and methodology, frequency of sampling, duration of sampling, and qualifications of sampling personnel in the air sampling portion of the plan. Include a description of arrangements made among contractors on multicontractor worksites to inform affected employees and to clarify responsibilities to control exposures. If work will occur on a historic building, then include in the plan a description of how the proposed activities will comply with other relevant specifications to avoid or minimize impacts to historic fabric (for example, but not limited to, specifications related to historic masonry).
The plan must be developed and signed by a certified Lead Project Designer in the State of Maine. The plan must include the name and certification number of the person signing the plan.
In occupied buildings, the plan must also include an occupant protection program that describes the measures that will be taken during the work to notify and protect the building occupants.
1.5.2.3 Lead, Cadmium, and Chromium Compliance Plan Checklist
The Contractor must complete the Lead, Cadmium, and Chromium Compliance Plan Checklist included as Attachment A at the end of this specification.
The Checklist must be signed by the properly-certified person preparing the Plan and must be submitted to the Government for review and approval with the Lead, Cadmium, and Chromium Compliance Plan.
1.5.2.4 Occupational and Environmental Assessment Data Report
If initial monitoring is necessary, submit occupational and environmental sampling results to the Contracting Officer within three working days of collection, signed by the testing laboratory employee performing the analysis, the employee that performed the sampling, and the CP.
In order to reduce the full implementation of 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127 the Contractor must provide documentation. Submit a report that supports the determination to reduce full implementation of the requirements of 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127 and supporting the Lead, Cadmium, and Chromium Compliance Plan.
a. The initial monitoring must represent each job classification, or if working conditions are similar to previous jobs by the same employer, provide previously collected exposure data that can be used to estimate worker exposures per 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127. The data must represent the worker's regular daily exposure to lead, cadmium, and chromium for stated work. The initial monitoring must represent each task and/or type of activity. The initial monitoring must represent each/every PWL and/or material containing lead, cadmium, and chromium.
b. Submit worker exposure data gathered during the task based trigger operations of 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127 with a complete process description. This includes, but is not limited to, manual demolition, manual scraping, manual sanding, heat gun, power tool cleaning, rivet busting, cleanup of dry expendable abrasives, abrasive blast enclosure removal, abrasive blasting, welding, cutting and torch burning where lead, cadmium and chromium containing coatings are present.
c. The initial assessment must determine the requirement for further monitoring and the need to fully implement the control and protective requirements including the lead, cadmium, and chromium compliance plan per 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127.
1.5.2.5 Medical Examinations
Submit pre-work blood lead levels and post-work blood lead levels for all workers performing lead, cadmium, and chromium activities during the execution of the work. Initial medical surveillance as required by 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127 must be made available to all employees exposed to lead, cadmium, and chromium at any time (one day) above the action level. Full medical surveillance must be made available to all employees on an annual basis who are or may be exposed to lead, cadmium and chromium in excess of the action level for more than 30 days a year or as required by 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127. Adequate records must show that employees meet the medical surveillance requirements of 29 CFR 1926.33, 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127 and 29 CFR 1926.103. Provide medical surveillance to all personnel exposed to lead, cadmium, and chromium as indicated in 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127.
Maintain complete and accurate medical records of employees for the duration of employment plus 30 years.
1.5.2.6 Training
Train each employee performing work that disturbs lead, cadmium, and chromium, who performs LBP/MCL/PWL disposal, and air sampling operations prior to the time of initial job assignment and annually thereafter, in accordance with 29 CFR 1926.21, 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127,[ 40 CFR 745,] 49 CFR 172, and State of Maine and local regulations where appropriate.
1.5.2.7 Respiratory Protection Program
a. Provide each employee required to wear a respirator a respirator fit test at the time of initial fitting and at least annually thereafter as required by 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127.
b. Establish and implement a respiratory protection program as required by 29 CFR 1926.103, 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127, and 29 CFR 1926.55.
1.5.2.8 Hazard Communication Program
Establish and implement a Hazard Communication Program as required by 29
CFR 1926.59.
1.5.2.9 Lead, Cadmium, and Chromium Waste Management
The Lead, Cadmium, and Chromium Waste Management Plan must comply with applicable requirements of federal, State, and local hazardous waste regulations and address:
a. Identification and classification of wastes associated with the work.
b. Estimated quantities of wastes to be generated and disposed of.
c. Names and qualifications (experience and training) of personnel who will be working on-site with hazardous wastes.
d. List of waste handling equipment to be used in performing the work, to include cleaning, volume reduction, and transport equipment.
e. Spill prevention, containment, and cleanup contingency measures including a health and safety plan to be implemented in accordance with
29 CFR 1926.65.
f. Work plan and schedule for waste containment and management. Proper containment of the waste includes using acceptable waste containers, as well as proper marking/labeling of the containers. Clean up and containerize wastes daily.
g. Include any process that may alter or treat waste. Note that no process may be used that would render a hazardous waste non hazardous.
h. All HW must be placed in a Shipyard-permitted HWAA or Contractors shall turn HW in to a HWAA not later than the end of the shift on which it is generated. Responsibility for compliance is upon the Contractor. All hazardous wastes generated within the confines of the Shipyard are disposed of by the Government. Accordingly, all hazardous wastes generated by the Contractor to accomplish requirements of this contract will be considered Government-generated, and disposed of by the Government. Contractor shall not bring hazardous wastes onto Government property.
1.5.2.10 Waste Characterization Sampling Plan
A sampling plan must be developed that details practices to be followed for the collection, management, and analysis of waste characterization samples to determine if waste materials generated by the referenced project will be classified as hazardous or non-hazardous to ensure proper disposal. The plan must propose sampling that meets the requirements of all applicable local, state, and federal statutes and regulations, Navy and PNSY requirements, and project specifications. At a minimum, the sampling plan must include:
a. Confirmation that the sampling plan will be reviewed and accepted by the Navy prior to conducting any sampling. The Contracting Officer's Representative and NAVFAC EV must be notified seven calendar days in advance of sampling.
b. The timing of waste characterization sampling and analysis. To the extent feasible, waste sampling and analysis must be completed prior to any project work to ensure waste is properly characterized and can be separated to ensure hazardous waste is not commingled with non-hazardous waste.
c. The proposed date of sampling.
d. Documentation that the Environmental Field Technician (EFT) conducting the waste sampling has training in proper collection and decontamination procedures.
e. Confirmation that the samples will be submitted, under strict chain-of-custody (COC) requirements, to a Maine-certified laboratory. A copy of the laboratory's COC form should be attached to the plan.
f. Confirmation that sample collection, management, and analysis will be performed in accordance with the requirements of all applicable local, state and federal statutes and regulations, Navy and PNSY requirements, and the project specifications.
g. A listing of the constituents to be analyzed for, and the laboratory analytical methods to be utilized. At a minimum, the waste characterization must include laboratory analysis for RCRA 8 Metals via the Toxicity Characteristic Leaching Procedure (TCLP). Depending on the methods used in project implementation, additional waste characterization analysis may be required (for example, waste characterization analysis for corrosivity may be required if high pH solutions are used for paint removal).
h. Confirmation that results will be transmitted to the Contracting Officer and NAVFAC EV for final waste characterization and determination of disposal requirements for each waste material.
i. Confirmation that the sampling procedure will include, but not be limited to, the following:
1. The Contractor will notify the Contracting Officer's Representative and NAVFAC EV Sampling Program Manager seven (7) calendar days prior to each sampling event to ensure the area and materials to be sampled are witnessed by all parties.
2. The EFT taking the samples will inspect the work area/waste with the Government Representative(s) to visually and tactilely assess the materials to be sampled.
3. Using a field log, the EFT will record the locations, types, quantities and other salient details related to materials to be sampled.
4. The EFT will collect sufficient samples of the materials that will be waste requiring disposal from the project work area. Samples must be representative of all materials that comprise the waste.
5. The EFT will place the sample in a clean jar or vial, secure the jar or vial closed and label it with a unique sample number.
6. The EFT will record the sample number on the COC and note the location of the sample in the field log and on the site drawing.
7. The EFT will verify that the sample number(s) on the jar/vial are accurate and consistent with the COC.
8. The EFT will place the secured and labeled jar/vial into a cooler and arrange for prompt delivery of bulk samples to the analytical laboratory.
9. The EFT will clean up any debris generated by the sampling process.
10. The EFT will decontaminate the collection tool using wet wipes, water and paper towels after each sample is collected. Razor blades will be replaced on a periodic basis as determined by the Inspector.
11. All samples will be collected in a manner to eliminate cross-contamination by the previous sample.
12. All materials used in the collection of the samples (gloves, wipes, trash, etc.) will be containerized in a bag for delivery to approved facility for disposal.
13. The Inspector will obtain the following sampling equipment to perform the bulk sampling.
(a) Individual sample jars and vials;
(b) Field log;
(c) Site diagram;
(d) Chain-of-Custody (COC) forms;
(e) Nitrile gloves;
(f) Stainless steel or plastic soil scoops;
(g) Metal chisels of assorted sizes;
(h) Razor knives and replacement blades;
(i) Water and spray bottle;
(j) Trash bags;
(k) Disposable cleaning wipes;
(l) Paper towels;
(m) Duct tape; and
(n) Flashlight.
1.5.2.11 Environmental, Safety and Health Compliance
In addition to the detailed requirements of this specification, comply with laws, ordinances, rules, and regulations of federal, State, and local authorities regarding lead, cadmium, and chromium. Comply with the applicable requirements of the current issue of 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127, EM 385-1-1, and ND OPNAVINST 5100.23.
Submit matters regarding interpretation of standards to the Contracting Officer for resolution before starting work. Where specification requirements and the referenced documents vary, the most stringent requirements apply. The following local laws, ordinances, criteria, rules and regulations regarding removing, handling, storing, transporting, and disposing of lead, cadmium, and chromium-contaminated materials apply:
a. Shipyard Instruction 5090.6F Solid Waste Operations (included as
Attachment B at the end of this specification)
b. Shipyard Instruction 5090.30 Hazardous Waste Generator Standards
Licensing and certification in the State of Maine is required.
1.5.3 Pressure Differential Recordings for Local Exhaust System
Provide a local exhaust system that creates a negative pressure of at least
0.02 inches of water relative to the pressure external to the enclosure and operate it continuously, 24-hours a day, until the temporary enclosure of the lead, cadmium, and chromium control area is removed. Submit pressure differential recordings for each work day to the PQP and GC for review and to the Contracting Officer within 24-hours from the end of each work day.
1.5.4 Licenses, Permits and Notifications
Certify and submit in writing to the Maine Department of Environmental Protection and the Contracting Officer at least 10 days prior to the commencement of work that licenses, permits, and notifications have been obtained. All associated fees or costs incurred in obtaining the licenses, permits and notifications are included in the contract price.
1.5.5 Occupant Protection Plan
The certified project designer must develop and implement an Occupant Protection Plan describing the measures and management procedures to be taken during lead, cadmium and chromium hazard abatement activities to protect the building occupants/building facilities and the outside environment from exposure to any lead, cadmium and chromium contamination while lead, cadmium and chromium hazard abatement activities are performed.
1.5.6 Pre-Construction Conference
Along with the CP, meet with the Contracting Officer to discuss in detail the Lead, Cadmium, and Chromium Waste Management Plan and the Lead, Cadmium, and Chromium Compliance Plan, including procedures and precautions for the work.
1.6 EQUIPMENT
1.6.1 Respirators
Furnish appropriate respirators approved by the National Institute for Occupational Safety and Health (NIOSH), Department of Health and Human Services, for use in atmospheres containing lead, cadmium and chromium dust, fume and mist. Respirators must comply with the requirements of 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127.
1.6.2 Special Protective Clothing
Personnel exposed to lead, cadmium, and chromium contaminated dust must wear proper disposable protective whole body clothing, head covering, gloves, eye, and foot coverings as required by 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127. Furnish proper disposable plastic or rubber gloves to protect hands. Reduce the level of protection only after obtaining approval from the CP.
1.6.3 Rental Equipment Notification
If rental equipment is to be used during PWL or MCL handling and disposal, notify the rental agency in writing concerning the intended use of the equipment.
1.6.4 Vacuum Filters
UL 586 labeled HEPA filters.
1.6.5 Equipment for Government Personnel
Furnish the Contracting Officer with two complete sets of personal protective equipment (PPE) daily, as required herein, for entry into and inspection of the lead, cadmium and chromium removal work within the lead, cadmium and chromium controlled area. Personal protective equipment must include disposable whole body covering, including appropriate foot, head, eye, and hand protection. PPE remains the property of the Contractor.
The Government will provide respiratory protection for the Contracting Officer.
1.6.6 Abrasive Removal Equipment
The use of powered machine for vibrating, sanding, grinding, or abrasive blasting is prohibited unless equipped with local exhaust ventilation systems equipped with high efficiency particulate air (HEPA) filters. The use of abrasive removal equipment is prohibited unless expressly approved by the NAVFAC Cultural Resources (CR) Managers. Documentation of CR Manager approval must be included in the 'Lead, Cadmium, and Chromium Compliance Plan.'
1.6.7 Negative Air Pressure System
1.6.7.1 Minimum Requirements
Do not proceed with work in the area until containment is set up and HEPA filtration systems are in place. The negative air pressure system must meet the requirements of ASSP/SAFE Z9.2 including approved HEPA filters in accordance with UL 586. Negative air pressure equipment must be equipped with new HEPA filters, and be sufficient to maintain a minimum pressure differential of minus 0.02 inch of water column relative to adjacent, unsealed areas. Negative air pressure system minimum requirements are listed as follows:
a. The unit must be capable of delivering its rated volume of air with a clean first stage filter, an intermediate filter and a primary HEPA filter in place.
b. The HEPA filter must be certified as being capable of trapping and retaining mono-disperse particles as small as 0.3 micrometers at a minimum efficiency of 99.97 percent.
c. The unit must be capable of continuing to deliver no less than 70 percent of rated capacity when the HEPA filter is 70 percent full or measures 2.5 inches of water static pressure differential on a magnehelic gauge.
d. Equip the unit with a manometer-type negative pressure differential monitor with minor scale division of 0.02 inch of water and accuracy within plus or minus 1.0 percent. The manometer must be calibrated daily as recommended by the manufacturer.
e. Equip the unit with a means for the operator to easily interpret the readings in terms of the volumetric flow rate of air per minute moving through the machine at any given moment.
f. Equip the unit with an electronic mechanism that automatically shuts the machine off in the event of a filter breach or absence of a filter.
g. Equip the unit with an audible horn that sounds an alarm when the machine has shut itself off.
h. Equip the unit with an automatic safety mechanism that prevents a worker from improperly inserting the main HEPA filter.
1.6.7.2 Auxiliary Generator
Provide an auxiliary generator with capacity to power a minimum of 50 percent of the negative air machines at any time during the work. When power fails, the generator controls must automatically start the generator and switch the negative air pressure system machines to generator power.
The generator must not present a carbon monoxide hazard to workers.
1.6.8 Vacuum Systems
Vacuum systems must be suitably sized for the project, and filters must be capable of trapping and retaining all mono-disperse particles as small as
0.3 micrometers (mean aerodynamic diameter) at a minimum efficiency of
99.97 percent. Properly dispose of used filters that are being replaced.
1.6.9 Heat Blower Guns
Heat blower guns must be flameless, electrical, paint-softener type with controls to limit temperature to 1,100 degrees F. Heat blower must be (grounded) 120 volts ac, and must be equipped with cone, fan, glass protector and spoon reflector nozzles.
1.7 PROJECT/SITE CONDITIONS
1.7.1 Protection of Existing Work to Remain
Perform work without damage or contamination of adjacent areas. Where existing work is damaged or contaminated, restore work to its original condition or better as determined by the Contracting Officer.
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
Keep materials and equipment needed to complete the project available and on the site. Submit a description of the materials and equipment required;
including Safety Data Sheets (SDSs) for material brought onsite to perform the work.
2.1.1 Expendable Supplies
Submit a description of the expendable supplies required.
2.1.1.1 Polyethylene Bags
Disposable bags must be polyethylene plastic and be a minimum of 6 mils thick (4 mils thick if double bags are used) or any other thick plastic material shown to demonstrate at least equivalent performance; and capable of being made leak-tight. Leak-tight means that solids, liquids or dust cannot escape or spill out.
2.1.1.2 Polyethylene Leak-tight Wrapping
Wrapping used to wrap lead, cadmium, and chromium contaminated debris must be polyethylene plastic that is a minimum of 6 mils thick or any other thick plastic material shown to demonstrate at least equivalent performance.
2.1.1.3 Polyethylene Sheeting
Sheeting must be polyethylene plastic with a minimum thickness of 6 mil, or any other thick plastic material shown to demonstrate at least equivalent performance; and be provided in the largest sheet size reasonably accommodated by the project to minimize the number of seams. Where the project location constitutes an out of the ordinary potential for fire, or where unusual fire hazards cannot be eliminated, provide flame-resistant polyethylene sheets which conform to the requirements of NFPA 701.
2.1.1.4 Tape and Adhesive Spray
Tape and adhesive must be capable of sealing joints between polyethylene sheets and for attachment of polyethylene sheets to adjacent surfaces.
After dry application, tape or adhesive must retain adhesion when exposed to wet conditions, including amended water. Tape must be minimum 50 mm 2 inches wide, industrial strength.
2.1.1.5 Containers
When used, containers must be leak-tight and be labeled in accordance with EPA, DOT and OSHA standards. For containerization of hazardous waste, the Contractor must use containers provided by B357.
2.1.1.6 Chemical Paint Strippers
SDS for all chemicals must be provided to the Government as part of the prework submittals.
Chemical paint strippers must not contain methylene chloride and be formulated to prevent stain, discoloration, or raising of the substrate materials.
2.1.1.7 Chemical Paint Stripper Neutralizer
SDS for all chemicals must be provided to the Government as part of the prework submittals.
Neutralizers for paint strippers must be compatible with the substrate and suitable for use with the chemical stripper that has been applied to the surface.
2.1.1.8 Detergents and Cleaners
SDS for all chemicals must be provided to the Government as part of the prework submittals.
Detergents or cleaning agents must not contain trisodium phosphate and have demonstrated effectiveness in lead, cadmium and chromium control work using cleaning techniques specified by HUD 6780 guidelines.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Protection
3.1.1.1 Notification
a. Notify the Contracting Officer 20 days prior to the start of any lead, cadmium and chromium work.
b. Occupant Notification
Submit occupant written acknowledgment of the delivery of lead hazard information pamphlet (EPA 747-K-99-001 "Protect Your Family From Lead in Your Home") prior to commencing the renovation work for each affected unit using language provided in 40 CFR 745 Subpart E.
c. Notification of the Commencement of Work Impacting Lead, Cadmium, or Chromium
Submit a copy of the notification of the commencement of Work Impacting Lead, Cadmium, or Chromium.
3.1.1.2 Lead, Cadmium, and Chromium Control Area
a. Physical Boundary - Provide physical boundaries around the lead, cadmium, and chromium control area by roping off the area designated in the work plan or providing curtains, portable partitions or other enclosures to ensure that lead, cadmium and chromium will not escape outside of the lead, cadmium and chromium control area. Prohibit the general public from accessing the lead, cadmium, and chromium control areas.
b. Warning Signs - Provide warning signs at approaches to lead, cadmium, and chromium control areas. Locate signs at such a distance that personnel may read the sign and take the necessary precautions before entering the area. Signs must comply with the requirements of
29 CFR 1926.62.
3.1.1.3 Local Exhaust System
Provide a local exhaust system in the lead, cadmium, and chromium control area in accordance with ASSP/SAFE Z9.2, 29 CFR 1926.62, 29 CFR 1926.1126 and 29 CFR 1926.1127 that will provide at least 4 air changes per hour inside of the negative pressure enclosure. Local exhaust equipment must be operated 24-hours per day, until the lead, cadmium, and chromium control area is removed and must be leak proof to the filter and equipped with HEPA filters. Maintain a minimum pressure differential in the lead, cadmium, and chromium control area of minus 0.02 inch of water column relative to adjacent, unsealed areas. Provide continuous 24-hour per day monitoring of the pressure differential with a pressure differential automatic recording instrument. The building ventilation system must not be used as the local exhaust system for the lead, cadmium, and chromium control area. Filters on exhaust equipment must conform to ASSP/SAFE Z9.2 and UL 586. Terminate the local exhaust system out of doors and remote from any public access or ventilation system intakes.
3.1.1.4 Negative Air Pressure System Containment
a. Operate the negative air pressure systems to provide at least 4 air changes per hour inside the containment. Operate the local exhaust unit equipment continuously until the containment is removed. Smoke test the negative air pressure system for leaks at the beginning of each shift.
The certified supervisor is responsible to continuously monitor and keep a pressure differential log with an automatic manometric recording instrument. Notify the Contracting Officer immediately if the pressure differential falls below the prescribed minimum. Submit the continuously monitored pressure differential log, as specified. Do not use the building ventilation system as the local exhaust system.
Terminate the local exhaust system out of doors unless the Contracting Officer allows an alternate arrangement. All filters must be new at the beginning of the project and be periodically changed as necessary to maintain specified pressure differential and disposed of as lead, cadmium and chromium contaminated waste.
b. Discontinuing Negative Air Pressure System. Operate the negative air pressure system continuously during work activities unless otherwise authorized by the Contracting Officer. At the completion of the project, units must be run until full cleanup has been completed and final clearance testing requirements have been met. Dismantling of the negative air pressure systems must be as presented in the Lead, Cadmium, and Chromium Compliance Plan. Seal the HEPA filter machine intakes with polyethylene to prevent environmental contamination.
3.1.1.5 Decontamination Shower Facility
Provide clean and contaminated change rooms and shower facilities in accordance with this specification and 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127.
3.1.1.6 Eye Wash Station
Provide suitable facilities within the work area for quick drenching or flushing of the eyes where eyes may be exposed to injurious corrosive materials.
3.1.1.7 Mechanical Ventilation System
a. Use adequate ventilation to control personnel exposure to lead, cadmium and chromium in accordance with 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127. To the extent feasible, use local exhaust ventilation or other collection systems, approved by the CP. Evaluate and maintain local exhaust ventilation systems in accordance with 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127.
b. Vent local exhaust outside the building and away from building ventilation intakes or ensure system is connected to HEPA filters.
c. Use locally exhausted, power actuated tools or manual hand tools.
3.1.1.8 Personnel Protection
Personnel must wear and use protective clothing and equipment as specified herein. Eating, smoking, or drinking or application of cosmetics is not permitted in the lead, cadmium, and chromium control area. No one will be permitted in the lead, cadmium, and chromium control area unless they have been appropriately trained and provided with protective equipment.
3.2 ERECTION
3.2.1 Lead, Cadmium, and Chromium Control Area Requirements
Establish a lead, cadmium, and chromium control area by completely establishing barriers and physical boundaries around the area or structure where PWL or MCL removal operations will be performed.
Full containment - Contain removal operations by the use of critical barriers and HEPA filtered exhaust, a negative pressure enclosure system with decontamination facilities and with HEPA filtered exhaust if required by the CP. For containment areas larger than 1,000 square feet install a minimum of two 18 inch square viewing ports. Locate ports to provide a view of the required work from the exterior of the enclosed contaminated area. Glaze ports with laminated safety glass.
3.3 APPLICATION
3.3.1 Lead, Cadmium, and Chromium Work
Perform lead, cadmium, and chromium work in accordance with approved Lead, Cadmium, and Chromium Compliance Plan. Use procedures and equipment required to limit occupational exposure and environmental contamination with lead, cadmium, and chromium when the work is…